[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-243645-105":3,"detail-sidebar-cat-1-en-105":81,"doc-detail-243645-en":126},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":74,"head_meta":76,"extra_data":78,"updated_unix":80},105,"en","civil-construction-request-for-information-rfi-cover-sheet","CIVIL CONSTRUCTION-REQUEST FOR INFORMATION (RFI) COVER SHEET","","This document is a Request for Information (RFI) cover sheet for Civil Construction projects. It outlines the necessary information and procedures for submitting RFIs, including project details, inspector information, project name, permit numbers, engineer contact, and RFI number and date. The cover sheet also details the required submittals, which include filling out the cover sheet, clouding proposed changes in red on the plan sheet, and retaining previously approved RFI numbers. It also provides a checklist for the types of changes an RFI can include, such as wet weather/TESC, water, street frontage improvements/ADA, landscape and trees, stormwater, sewer, streetlights, fire related, grading, side sewer, traffic control, and others. The document specifies that the RFI application should be emailed to the Construction Inspection Supervisor at CONSTRUCTIONINSPECTION@REDMOND.GOV. It is intended to streamline the RFI process for civil construction projects, ensuring all necessary information is provided for efficient review and approval of changes.",{"@graph":14,"@context":73},[15,34,56],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/template/","Template",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/template/forms/","Forms",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/template/civil-construction-request-for-information-rfi-cover-sheet/243645/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/civil-construction-request-for-information-rfi-cover-sheet/243645.png","ImageObject",442,249,{"name":42,"@type":43},"Emma Wilson","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-10-14","2026-09-12",true,{"@type":52,"interactionType":53,"userInteractionCount":55},"InteractionCounter",{"@type":54},"ViewAction",14,{"@type":57,"mainEntity":58},"FAQPage",[59,65,69],{"name":60,"@type":61,"acceptedAnswer":62},"What is the purpose of the RFI Cover Sheet?","Question",{"text":63,"@type":64},"The RFI Cover Sheet is used to formally document and submit requests for information or clarification regarding civil construction projects. It ensures all necessary project details and proposed changes are clearly communicated.","Answer",{"name":66,"@type":61,"acceptedAnswer":67},"What information must be included in the RFI Cover Sheet?",{"text":68,"@type":64},"The cover sheet requires project location, involved inspectors, project name, permit numbers, engineer contact information, the RFI number and request date, and the current construction status. It also includes sections for describing the RFI changes and the reason for them.",{"name":70,"@type":61,"acceptedAnswer":71},"What are the required submittals for an RFI?",{"text":72,"@type":64},"Required submittals include a fully completed RFI Cover Sheet, proposed changes clearly marked on the plan sheet in red, and a revision block listing all RFI numbers and dates. Previously approved RFI numbers must also be retained on the sheet.","https://schema.org",{"og:url":32,"og:type":75,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":77,"canonical":32},"index,follow",{"doc_id":79,"site_id":7},243645,1789206721,{"code":4,"msg":82,"data":83},"success",[84,89,94,98,103,108,112,117,122],{"id":85,"doc_module":22,"doc_module_name":25,"category_name":86,"show_sort_weight":87,"slug":88},11,"Presentations",90,"presentations",{"id":90,"doc_module":22,"doc_module_name":25,"category_name":91,"show_sort_weight":92,"slug":93},12,"Resumes",80,"resumes",{"id":55,"doc_module":22,"doc_module_name":25,"category_name":95,"show_sort_weight":96,"slug":97},"Invoices",70,"invoices",{"id":99,"doc_module":22,"doc_module_name":25,"category_name":100,"show_sort_weight":101,"slug":102},15,"Posters",60,"posters",{"id":104,"doc_module":22,"doc_module_name":25,"category_name":105,"show_sort_weight":106,"slug":107},16,"Social Media",50,"social-media",{"id":109,"doc_module":22,"doc_module_name":25,"category_name":29,"show_sort_weight":110,"slug":111},17,40,"forms",{"id":113,"doc_module":22,"doc_module_name":25,"category_name":114,"show_sort_weight":115,"slug":116},18,"Letters",30,"letters",{"id":118,"doc_module":22,"doc_module_name":25,"category_name":119,"show_sort_weight":120,"slug":121},21,"Paper Templates",5,"papers-templates",{"id":123,"doc_module":22,"doc_module_name":25,"category_name":124,"show_sort_weight":4,"slug":125},158,"General","general-158",{"code":4,"msg":82,"data":127},{"doc_id":79,"user_id":128,"nickname":42,"user_avatar":129,"doc_module":22,"category_id":109,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":130,"file_id":131,"file_url":132,"file_type":133,"file_size":134,"view_count":55,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":22,"language":135,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":136,"faqs":137,"seo_title":138,"seo_description":12,"update_tm":80,"read_time":4},3848291630094,"https://eur-avatar.wpscdn.com/davatar_085a072bc5b1113ac321206ff7593b45","Email RFI application to Construction Inspection Supervisor: CONSTRUCTIONINSPECTION@REDMOND.GOV  \nCIVIL CONSTRUCTION-REQUEST FOR INFORMATION (RFI) COVER SHEET  \n| EFFECTIVE DATE: 4/24/2026 |\n| --- |\n| General Information: |\n\nProject Location:   Involved Inspector(s):   Project Name:   Permit No. SITE-20XX-XXXXX:   Other Civil Permit No. (if applicable): CGP/RGD-  , SWR-  , or WWP-  Engineer Contact:  Phone:   Email:   RFI\\#:   Request Date:   Construction Status: ☐Started ☐Not Started  \nRequired Submittal:  \n1. This RFI Cover sheet with all line items should be filled out.  \n2. The proposed changes and RFI number should be clouded in red on the plan sheet, which must be created from the CAD file of the most recently approved plan, incorporating all previous RFIs. List all RFI numbers and dates in the Revision Block.  \n3. Any previously approved RFI numbers within a triangle symbol should be retained at their original locations on the sheet for reference.  \n\n| Description of RFI Changes (Must Include Affected Plan Sheet Numbers): |  |  |  |\n| --- | --- | --- | --- |\n|  |  |  |  |\n| Reason for RFI Changes: |  |  |  |\n|  |  |  |  |\n| RFI Includes: (Check All That Apply) |  |  |  |\n| ☐Wet Weather/TESC | ☐Water | ☐Street Frontage Improvements/ADA | ☐Landscape and Trees |\n| ☐Stormwater | ☐Sewer | ☐Streetlights | ☐Fire Related |\n| ☐Grading | ☐Side Sewer | ☐Traffic Control | ☐Others  |","cbCaig9seLlirPtY","https://ap.wps.com/l/cbCaig9seLlirPtY","pdf",449443,"English","# CIVIL CONSTRUCTION-REQUEST FOR INFORMATION (RFI) COVER SHEET\n## General Information\n## Required Submittal\n## Description of RFI Changes\n## Reason for RFI Changes\n## RFI Includes","[{\"question\":\"What is the purpose of the RFI Cover Sheet?\",\"answer\":\"The RFI Cover Sheet is used to formally document and submit requests for information or clarification regarding civil construction projects. It ensures all necessary project details and proposed changes are clearly communicated.\"},{\"question\":\"What information must be included in the RFI Cover Sheet?\",\"answer\":\"The cover sheet requires project location, involved inspectors, project name, permit numbers, engineer contact information, the RFI number and request date, and the current construction status. It also includes sections for describing the RFI changes and the reason for them.\"},{\"question\":\"What are the required submittals for an RFI?\",\"answer\":\"Required submittals include a fully completed RFI Cover Sheet, proposed changes clearly marked on the plan sheet in red, and a revision block listing all RFI numbers and dates. Previously approved RFI numbers must also be retained on the sheet.\"}]","CIVIL CONSTRUCTION-REQUEST FOR INFORMATION (RFI) COVER SHEET | PDF"]