[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-1-en-105":3,"doc-seo-306693-105":53,"doc-detail-306693-en":127},{"code":4,"msg":5,"data":6},0,"success",[7,14,19,24,29,34,39,44,49],{"id":8,"doc_module":9,"doc_module_name":10,"category_name":11,"show_sort_weight":12,"slug":13},11,1,"Template","Presentations",90,"presentations",{"id":15,"doc_module":9,"doc_module_name":10,"category_name":16,"show_sort_weight":17,"slug":18},12,"Resumes",80,"resumes",{"id":20,"doc_module":9,"doc_module_name":10,"category_name":21,"show_sort_weight":22,"slug":23},14,"Invoices",70,"invoices",{"id":25,"doc_module":9,"doc_module_name":10,"category_name":26,"show_sort_weight":27,"slug":28},15,"Posters",60,"posters",{"id":30,"doc_module":9,"doc_module_name":10,"category_name":31,"show_sort_weight":32,"slug":33},16,"Social Media",50,"social-media",{"id":35,"doc_module":9,"doc_module_name":10,"category_name":36,"show_sort_weight":37,"slug":38},17,"Forms",40,"forms",{"id":40,"doc_module":9,"doc_module_name":10,"category_name":41,"show_sort_weight":42,"slug":43},18,"Letters",30,"letters",{"id":45,"doc_module":9,"doc_module_name":10,"category_name":46,"show_sort_weight":47,"slug":48},21,"Paper Templates",5,"papers-templates",{"id":50,"doc_module":9,"doc_module_name":10,"category_name":51,"show_sort_weight":4,"slug":52},158,"General","general-158",{"code":4,"msg":54,"data":55},"ok",{"site_id":56,"language":57,"slug":58,"title":59,"keywords":60,"description":61,"schema_data":62,"social_meta":120,"head_meta":122,"extra_data":124,"updated_unix":126},105,"en","city-of-miami-building-department-permit-application-application-form","City of Miami Building Department Permit Application - Application Form","","City of Miami Building Department permit application form used to collect detailed project, property, and applicant information. Captures job location and address/folio data, owner and lessee details, contractor and license/registration information, proposed and current use, building type and permit type selections. Includes sections for engineer/architect information, scope changes to existing permits, cost and measurement fields, bonding and inspection details, affidavits and signatures, and notary acknowledgement for owner/lessee and qualifier.",{"@graph":63,"@context":119},[64,80,102],{"@type":65,"itemListElement":66},"BreadcrumbList",[67,71,74,77],{"item":68,"name":69,"@type":70,"position":9},"https://docshare.wps.com","Home","ListItem",{"item":72,"name":10,"@type":70,"position":73},"https://docshare.wps.com/template/",2,{"item":75,"name":36,"@type":70,"position":76},"https://docshare.wps.com/template/forms/",3,{"item":78,"name":59,"@type":70,"position":79},"https://docshare.wps.com/template/city-of-miami-building-department-permit-application-application-form/306693/",4,{"url":78,"name":59,"@type":81,"image":82,"author":87,"headline":59,"publisher":90,"fileFormat":93,"inLanguage":57,"description":61,"dateModified":94,"datePublished":95,"encodingFormat":93,"isAccessibleForFree":96,"interactionStatistic":97},"DigitalDocument",{"url":83,"@type":84,"width":85,"height":86},"https://docshare.wps.com/thumbnails/city-of-miami-building-department-permit-application-application-form/306693.png","ImageObject",442,249,{"name":88,"@type":89},"Felix Montgomery","Person",{"url":68,"name":91,"@type":92},"DocShare","Organization","application/pdf","2026-10-22","2026-09-19",true,{"@type":98,"interactionType":99,"userInteractionCount":101},"InteractionCounter",{"@type":100},"ViewAction",13,{"@type":103,"mainEntity":104},"FAQPage",[105,111,115],{"name":106,"@type":107,"acceptedAnswer":108},"What information is required about the job location and property?","Question",{"text":109,"@type":110},"The form requests job location details such as folio number, job address, legal address, unit number, and city/state/ZIP fields.","Answer",{"name":112,"@type":107,"acceptedAnswer":113},"What contractor and license information must be provided?",{"text":114,"@type":110},"Contractor social security number (if applicable), contractor’s license/registration number, company name, address, phone, and email are required, along with qualifying name and proposed building use details.",{"name":116,"@type":107,"acceptedAnswer":117},"What signatures and affidavits are included in the permit application?",{"text":118,"@type":110},"The form includes an owner’s affidavit, a lessee’s affidavit, and statements acknowledging supervision, authorization, and consequences of misrepresentation, followed by signatures for owner/lessee and qualifier.","https://schema.org",{"og:url":78,"og:type":121,"og:title":59,"og:site_name":91,"og:description":61},"article",{"robots":123,"canonical":78},"index,follow",{"doc_id":125,"site_id":56},306693,1790215524,{"code":4,"msg":5,"data":128},{"doc_id":125,"user_id":129,"nickname":88,"user_avatar":130,"doc_module":9,"category_id":35,"category_name":36,"doc_title":59,"doc_description":61,"doc_content":131,"file_id":132,"file_url":133,"file_type":134,"file_size":135,"view_count":101,"is_deleted":4,"is_public":9,"is_downloadable":9,"audit_status":9,"page_count":9,"language":136,"language_code":57,"site_id":56,"html_lang":57,"table_of_contents":137,"faqs":138,"seo_title":139,"seo_description":61,"update_tm":140,"read_time":4},549768064778,"https://ap-avatar.wpscdn.com/davatar_6f874abed73319feea01a86fa6f0fab8","City of Miami Building Department Permit Application  \nProcess \\#:   Total Due  Permit \\#:    \n\n| Job Location | Owner Lessee Information |\n| --- | --- |\n| Folio Number: | Owner: |\n| Job Address: Zip: | Owner’s Address: |\n| Legal Address: | Phone: E-Mail: |\n| Unit No: | Lessee: |\n| 􀀀 Commercial 􀀀 Residential 􀀀 Dry Run | Lessee Address: |\n| 􀀀 Owner 􀀀 Contractor 􀀀 Lessee | Phone: E-Mail: |\n| Contractor Information | General Information |\n| Contractor’s License/Registration No: | Proposed Use of Building: |\n| Contractor’s Social Security Number: | Current Use: |\n| Oualifier’s Name: | Job Description: |\n| Company’s Name: | New Construction Total Cost: |\n| Address: | New Construction Sq. Ft: Lineal Ft: |\n| City: State: Zip: | Remodeling Total Cost: |\n| Phone: | Remodeling Sq. Ft: Lineal Ft: |\n| E-Mail: | Units: Floors: Height: Gallons: |\n|  If this is related to another permit, you must provide :  | Master Permit Number: Plan No: \u003Cbr>|\n| Threshold Inspector | Bonding Company |\n| Name: | Name: |\n| Address: | Address: |\n| Phone: | Phone: |\n| Permit Type | Engineer/Architect Information |\n| 􀀀 Building 􀀀 Plumbing | Engineer’s Name: |\n| 􀀀 Mechanical/AC 􀀀 Plumbing/Gas | Address: |\n| 􀀀 Electrical 􀀀 Roofing | Phone: E-Mail: |\n| 􀀀 Landscaping 􀀀 Sign | Architect’s Name: |\n| 􀀀 Electrical 􀀀 Roofing | Address: |\n| 􀀀 Fire 􀀀 Mechanical Elevator | Phone: E-Mail: |\n| Change to Existing Permit | Building Permit only |\n| 􀀀 Change of Contractor (CR) 􀀀 Change of Qualifier (CQ) | 􀀀 New Construction 􀀀 Addition |\n| 􀀀 Re-certification of Plans (RC) 􀀀 Plans revision (RV) | 􀀀 General Repair/Remodeling 􀀀 Misc. Building |\n| 􀀀 Completion Permit (CP) | 􀀀 Change of Occupancy 􀀀 Demolition\u003Cbr>􀀀 Change of Use |\n\n\n| I understand that separate permits must be obtained for other items (i.e. electrical, plumbing, roofing, etc.), unless specifically covered by this permit. In signing this application, I am responsible for the supervision and completion of the construction in accordance with the plans and specifications and for compliance with all federal, state, and county laws applicable.\u003Cbr>Owner’s Affidavit: I certify that all the forgoing information is correct. Owner Certifies that the aforementioned Contractor has the authorization to perform the work as specified above.\u003Cbr>Lessee’s Affidavit: Lessee certifies that he has full consent and authorization from owner of subject property to perform the abovementioned work and to hire above captioned contractor.\u003Cbr>I have read the information contained in this permit and understand that any misrepresentation may constitutes fraud and could void the permit.\u003Cbr>Signature of Owner/Lessee Signature of Qualifier\u003Cbr>Print Name\u003Cbr>State of Florida, County of Miami-Dade\u003Cbr>Sworn to and subscribed before me this   Day of   , 20__ . By  (SEAL)   Personally known or Produced Identification,\u003Cbr>Type of Identification produced  \u003Cbr>Print Name\u003Cbr>State of Florida, County of Miami-Dade\u003Cbr>Sworn to and subscribed before me this   Day of   , 20__ . By  (SEAL)   Personally known or Produced Identification,\u003Cbr>Type of Identification produced   |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |\n| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |\n| \u003Cbr>FOR BUILDING DEPARTMENT USE ONLY |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |\n| Job Code: |  | Certificates Required:\u003Cbr>□ C.O. □ C.C. |  |  |  |  | Plans:\u003Cbr>□ Yes □ No |  |  |  | No. Of Sheets:  |  |  |  |  |  |  |\n| Tracking required |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |\n|  | Application Received by:  Date:  Permit Authorized by:   Date  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |  |","cbCaippyBOFojD7s","https://ap.wps.com/l/cbCaippyBOFojD7s","pdf",102211,"English","# Job and Property Information\n## Owner, Lessee, and Contractor Details\n# Proposed Use and Permit Type\n## New Construction and Changes to Existing Permits\n# Engineer/Architect Information\n## Threshold Inspector and Bonding Company\n# Affidavits and Signatures\n## Owner and Lessee Notary Acknowledgement\n# Building Department Use Only","[{\"question\":\"What information is required about the job location and property?\",\"answer\":\"The form requests job location details such as folio number, job address, legal address, unit number, and city/state/ZIP fields.\"},{\"question\":\"What contractor and license information must be provided?\",\"answer\":\"Contractor social security number (if applicable), contractor’s license/registration number, company name, address, phone, and email are required, along with qualifying name and proposed building use details.\"},{\"question\":\"What signatures and affidavits are included in the permit application?\",\"answer\":\"The form includes an owner’s affidavit, a lessee’s affidavit, and statements acknowledging supervision, authorization, and consequences of misrepresentation, followed by signatures for owner/lessee and qualifier.\"}]","City of Miami Building Department Permit Application - Application Form | PDF",1789840167]