[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-1-en-105":3,"doc-seo-254547-105":53,"doc-detail-254547-en":126},{"code":4,"msg":5,"data":6},0,"success",[7,14,19,24,29,34,39,44,49],{"id":8,"doc_module":9,"doc_module_name":10,"category_name":11,"show_sort_weight":12,"slug":13},11,1,"Template","Presentations",90,"presentations",{"id":15,"doc_module":9,"doc_module_name":10,"category_name":16,"show_sort_weight":17,"slug":18},12,"Resumes",80,"resumes",{"id":20,"doc_module":9,"doc_module_name":10,"category_name":21,"show_sort_weight":22,"slug":23},14,"Invoices",70,"invoices",{"id":25,"doc_module":9,"doc_module_name":10,"category_name":26,"show_sort_weight":27,"slug":28},15,"Posters",60,"posters",{"id":30,"doc_module":9,"doc_module_name":10,"category_name":31,"show_sort_weight":32,"slug":33},16,"Social Media",50,"social-media",{"id":35,"doc_module":9,"doc_module_name":10,"category_name":36,"show_sort_weight":37,"slug":38},17,"Forms",40,"forms",{"id":40,"doc_module":9,"doc_module_name":10,"category_name":41,"show_sort_weight":42,"slug":43},18,"Letters",30,"letters",{"id":45,"doc_module":9,"doc_module_name":10,"category_name":46,"show_sort_weight":47,"slug":48},21,"Paper Templates",5,"papers-templates",{"id":50,"doc_module":9,"doc_module_name":10,"category_name":51,"show_sort_weight":4,"slug":52},158,"General","general-158",{"code":4,"msg":54,"data":55},"ok",{"site_id":56,"language":57,"slug":58,"title":59,"keywords":60,"description":61,"schema_data":62,"social_meta":119,"head_meta":121,"extra_data":123,"updated_unix":125},105,"en","chino-valley-senior-center-kitchen-remodel-project-specification-manual","Chino Valley Senior Center Kitchen Remodel - Project Specification Manual","","Project Specification Manual for the Chino Valley Senior Center Kitchen Remodel in Chino Valley, Arizona, prepared under Michael Taylor Architects, Inc. Identified project number 22035 (April 8, 2024), the manual organizes procurement and contracting requirements, general requirements, and division-level specification coverage. Section 01 1000 Summary defines related documents, describes the scope of the work under the base bid, and explains how the project manual and contract documents are structured. It also states specification organization principles and responsibilities for segregation, omissions, or duplications.",{"@graph":63,"@context":118},[64,80,101],{"@type":65,"itemListElement":66},"BreadcrumbList",[67,71,74,77],{"item":68,"name":69,"@type":70,"position":9},"https://docshare.wps.com","Home","ListItem",{"item":72,"name":10,"@type":70,"position":73},"https://docshare.wps.com/template/",2,{"item":75,"name":11,"@type":70,"position":76},"https://docshare.wps.com/template/presentations/",3,{"item":78,"name":59,"@type":70,"position":79},"https://docshare.wps.com/template/chino-valley-senior-center-kitchen-remodel-project-specification-manual/254547/",4,{"url":78,"name":59,"@type":81,"image":82,"author":87,"headline":59,"publisher":90,"fileFormat":93,"inLanguage":57,"description":61,"dateModified":94,"datePublished":95,"encodingFormat":93,"isAccessibleForFree":96,"interactionStatistic":97},"DigitalDocument",{"url":83,"@type":84,"width":85,"height":86},"https://docshare.wps.com/thumbnails/chino-valley-senior-center-kitchen-remodel-project-specification-manual/254547.png","ImageObject",442,249,{"name":88,"@type":89},"\tWilliam","Person",{"url":68,"name":91,"@type":92},"DocShare","Organization","application/pdf","2026-10-20","2026-09-13",true,{"@type":98,"interactionType":99,"userInteractionCount":15},"InteractionCounter",{"@type":100},"ViewAction",{"@type":102,"mainEntity":103},"FAQPage",[104,110,114],{"name":105,"@type":106,"acceptedAnswer":107},"What is the purpose of the Project Manual in this manual?","Question",{"text":108,"@type":109},"The Project Manual is the volume containing the Bidding Requirements, sample forms, and selected Contract Documents such as the Conditions of the Contract and the Specifications. It also includes listed items like payment bonds, performance bonds, instructions to bidders, summary of the work, bid forms, and the general conditions.","Answer",{"name":111,"@type":106,"acceptedAnswer":112},"What does the manual state about the scope of work under the base bid?",{"text":113,"@type":109},"The work under the Base Bid includes all work indicated or specified within the Contract, unless the contract specifically indicates the work is not included.",{"name":115,"@type":106,"acceptedAnswer":116},"How are the specifications organized, and what responsibility does that create?",{"text":117,"@type":109},"Specifications are arranged by trades using headings for convenience and follow the Construction Specifications Institute Master Format 2004. This organization is for convenience only and does not relieve the contractor of furnishing every item indicated or specified, even if not properly segregated.","https://schema.org",{"og:url":78,"og:type":120,"og:title":59,"og:site_name":91,"og:description":61},"article",{"robots":122,"canonical":78},"index,follow",{"doc_id":124,"site_id":56},254547,1791742827,{"code":4,"msg":5,"data":127},{"doc_id":124,"user_id":128,"nickname":88,"user_avatar":129,"doc_module":9,"category_id":8,"category_name":11,"doc_title":59,"doc_description":61,"doc_content":130,"file_id":131,"file_url":132,"file_type":133,"file_size":134,"view_count":15,"is_deleted":4,"is_public":9,"is_downloadable":9,"audit_status":9,"page_count":135,"language":136,"language_code":57,"site_id":56,"html_lang":57,"table_of_contents":137,"faqs":138,"seo_title":139,"seo_description":61,"update_tm":140,"read_time":141},5909887254083,"https://ap-avatar.wpscdn.com/davatar_276721f389ce27ea32af1340a28f341c","Michael Taylor Architects, Inc  \n118 South Pleasant Street Prescott, Arizona 86303  \n®  \nChino Valley Senior Center Kitchen Remodel  \nTown Of Chino Valley  \n202 North State Route 89 Chino Valley, Arizona 86323  \nPROJECT SPECIFICATION MANUAL  \nMTAI Project number: 22035 April 8, 2024  \nSECTION 00 0110-TABLE OF CONTENTS  \nDIVISION 00 – PROCUREMENT AND CONTRACTING REQUIREMENTS  \nNot Used  \nDIVISION 01-GENERAL REQUIREMENTS  \nSection 01 1000 Summary  \nSection 01 2500 Substitution Procedures Section 01 2613 Requests for Interpretation  \nRequest for Information (Form)  \nSection 01 2973 Schedule of Values  \nSection 01 2976 Progress Payment Procedures Section 01 3119 Project Meetings  \nSection 01 3200 Construction Documentation Section 01 3216 Construction Progress Schedules Section 01 3333 Electronic Drawings  \nAIA Document C106-2007, Digital Data Licensing Agreement  \nSection 01 4200 References Section 01 4500 Quality Control  \nSection 01 5000 Temporary Facilities and Controls  \nSection 01 6600 Product Storage and Handling Requirements Section 01 7123 Field Engineering  \nSection 01 7329 Cutting and Patching  \nSection 01 7419 Construction Waste Management Section 01 7423 Final Cleaning  \nSection 01 7700 Closeout Procedures  \nSection 01 7823 Operation and Maintenance Data Section 01 7836 Warranties  \nSection 01 7839 Project Record Documents  \nSection 01 7845 Spare Parts and Maintenance Materials Section 01 7900 Demonstration and Training  \nDIVISION 02-EXISTING CONDITIONS  \nNot Used  \nDIVISION 03-CONCRETE  \nNot Used  \nDIVISION 04-MASONRY  \nNot Used  \nDIVISION 05-METALS  \nNot Used  \nDIVISION 06-WOOD, PLASTICS AND COMPOSITES  \nNot Used  \nDIVISION 07-THERMAL AND MOISTURE PROTECTION  \nNot Used  \nDIVISION 08-OPENINGS  \nSection 08 1416  \nSection 08 4113  \nSection 08 7100  \nSection 08 8000  \nFlush Wood Doors  \nAluminum-Framed Entrances and Storefronts Door Hardware  \nGlazing  \nDIVISION 09-FINISHES  \nSection 09 2116  \nSection 09 5113  \nSection 09 6513  \nSection 09 6519  \nSection 09 6813  \nSection 09 9100  \nGypsum Board Assemblies Acoustical Panel Ceilings Resilient Base and Accessories Resilient Tile Flooring  \nTile Carpeting  \nPainting  \nDIVISION 10-SPECIALTIES  \nNot Used  \nDIVISION 11-EQUIPMENT  \nNot Used  \nDIVISION 12-FURNISHINGS  \nSection 12 3216 Manufactured Plastic-Laminate-Clad Casework  \nDIVISION 13-SPECIAL CONSTRUCTION  \nNot Used  \nDIVISION 14-CONVEYING EQUIPMENT  \nNot Used  \nDIVISION 21-FIRE SUPPRESSION  \nNot Used  \nDIVISION 22-PLUMBING  \nSpecifications included on Plumbing sheets  \nDIVISION 23-HEATING, VENTILATING AND AIR CONDITIONING  \nSpecifications included on Mechanical sheets  \nDIVISION 26-ELECTRICAL  \nSpecifications included on Electrical sheets  \nDIVISION 27-COMMUNICATIONS  \nNot Used  \nDIVISION 28-ELECTRONIC SAFETY AND SECURITY  \nNot Used  \nDIVISION 31-EARTHWORK  \nNot Used  \nDIVISION 32-EXTERIOR IMPROVEMENTS  \nNot Used  \nDIVISION 33-UTILITIES  \nNot Used  \nEND OF TABLE OF CONTENTS  \nDIVISION 01-GENERAL REQUIREMENTS  \nSection 01 1000 Summary  \nSection 01 1520 Recycled Polyvinyl Safety Floor Installations Section 01 2300 Alternates  \nSection 01 2500 Substitution Procedures Section 01 2613 Requests for Interpretation  \nRequest for Information (Form)  \nSection 01 2973 Schedule of Values  \nSection 01 2976 Progress Payment Procedures Section 01 3119 Project Meetings  \nSection 01 3200 Construction Documentation Section 01 3216 Construction Progress Schedules  \nSection 01 3324 Electronic Submittal of Shop Drawings and Product Data Section 01 3333 Electronic Drawings  \nAIA Document C106-2007, Digital Data Licensing Agreement  \nSection 01 4200 References  \nSection 01 5000 Temporary Facilities and Controls  \nSection 01 6600 Product Storage and Handling Requirements Section 01 7329 Cutting and Patching  \nSection 01 7419 Construction Waste Management Section 01 7423 Final Cleaning  \nSection 01 7700 Closeout Procedures  \nSection 01 7823 Operation and Maintenance Data Section 01 7836 Warranties  \nSection 01 7839 Project Record Documents  \nSec","cbCaihSgqsNBKAnM","https://ap.wps.com/l/cbCaihSgqsNBKAnM","pdf",1828481,177,"English","# Division 00 – Procurement and Contracting Requirements\n# Division 01 – General Requirements\n## Section 01 1000 Summary\n## Section 01 2500 Substitution Procedures\n## Section 01 2613 Requests for Interpretation\n## Request for Information (Form)\n## Section 01 2973 Schedule of Values\n## Section 01 2976 Progress Payment Procedures\n## Section 01 3119 Project Meetings\n## Section 01 3200 Construction Documentation\n## Section 01 3216 Construction Progress Schedules\n## Section 01 3333 Electronic Drawings\n## Section 01 4200 References\n## Section 01 4500 Quality Control\n## Section 01 5000 Temporary Facilities and Controls\n## Section 01 6600 Product Storage and Handling Requirements\n## Section 01 7123 Field Engineering\n## Section 01 7329 Cutting and Patching\n## Section 01 7419 Construction Waste Management\n## Section 01 7423 Final Cleaning\n## Section 01 7700 Closeout Procedures\n## Section 01 7823 Operation and Maintenance Data\n## Section 01 7836 Warranties\n## Section 01 7839 Project Record Documents\n## Section 01 7845 Spare Parts and Maintenance Materials\n## Section 01 7900 Demonstration and Training","[{\"question\":\"What is the purpose of the Project Manual in this manual?\",\"answer\":\"The Project Manual is the volume containing the Bidding Requirements, sample forms, and selected Contract Documents such as the Conditions of the Contract and the Specifications. It also includes listed items like payment bonds, performance bonds, instructions to bidders, summary of the work, bid forms, and the general conditions.\"},{\"question\":\"What does the manual state about the scope of work under the base bid?\",\"answer\":\"The work under the Base Bid includes all work indicated or specified within the Contract, unless the contract specifically indicates the work is not included.\"},{\"question\":\"How are the specifications organized, and what responsibility does that create?\",\"answer\":\"Specifications are arranged by trades using headings for convenience and follow the Construction Specifications Institute Master Format 2004. This organization is for convenience only and does not relieve the contractor of furnishing every item indicated or specified, even if not properly segregated.\"}]","Chino Valley Senior Center Kitchen Remodel - Project Specification Manual | PDF",1789279381,62]