[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-200668-105":3,"detail-sidebar-cat-1-en-105":81,"doc-detail-200668-en":126},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":74,"head_meta":76,"extra_data":78,"updated_unix":80},105,"en","chesm-pre-job-safety-checklist-join-operations-standardized-sheers-process","CHESM - Pre-Job Safety Checklist - Join Operations - Standardized SHEERS Process","","Pre-Job Safety Checklist is used to review contractor safety details tied to the job scope after the contractor is selected, typically within one to two weeks of starting work. The checklist also supports reviews for major jobs performed by existing contractors. It captures general project and contractor information, verifies leadership and safety expectations, defines process for approvals on scope changes, and outlines facility planning, objective targets, teams, measurements, and work-process investigation and corrective action requirements.",{"@graph":14,"@context":73},[15,34,56],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/template/","Template",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/template/forms/","Forms",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/template/chesm-pre-job-safety-checklist-join-operations-standardized-sheers-process/200668/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/chesm-pre-job-safety-checklist-join-operations-standardized-sheers-process/200668.png","ImageObject",442,249,{"name":42,"@type":43},"Eliana","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/vnd.openxmlformats-officedocument.wordprocessingml.document","2026-10-22","2026-09-04",true,{"@type":52,"interactionType":53,"userInteractionCount":55},"InteractionCounter",{"@type":54},"ViewAction",12,{"@type":57,"mainEntity":58},"FAQPage",[59,65,69],{"name":60,"@type":61,"acceptedAnswer":62},"When should the pre-job safety checklist be completed?","Question",{"text":63,"@type":64},"The review is conducted within a week or two after beginning work, following contractor selection. It can also be used for major jobs by existing contractors to ensure scope details are discussed.","Answer",{"name":66,"@type":61,"acceptedAnswer":67},"What general information must be recorded in the checklist?",{"text":68,"@type":64},"It includes plant/location, project description, contract or P.O. number, contractor firm names (including subcontractors), local address, contact details, superintendent/foreman information, contractor EHS representative details, and expected project timing.",{"name":70,"@type":61,"acceptedAnswer":71},"Which topics are covered under work process and safety management?",{"text":72,"@type":64},"The checklist addresses safety activity planning, periodic review and evaluation expectations, incident investigation expectations and methods, reporting distribution, corrective action tracking and validation, and shared learnings across site and functional specialties.","https://schema.org",{"og:url":32,"og:type":75,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":77,"canonical":32},"index,follow",{"doc_id":79,"site_id":7},200668,1788509721,{"code":4,"msg":82,"data":83},"success",[84,89,93,98,103,108,112,117,122],{"id":85,"doc_module":22,"doc_module_name":25,"category_name":86,"show_sort_weight":87,"slug":88},11,"Presentations",90,"presentations",{"id":55,"doc_module":22,"doc_module_name":25,"category_name":90,"show_sort_weight":91,"slug":92},"Resumes",80,"resumes",{"id":94,"doc_module":22,"doc_module_name":25,"category_name":95,"show_sort_weight":96,"slug":97},14,"Invoices",70,"invoices",{"id":99,"doc_module":22,"doc_module_name":25,"category_name":100,"show_sort_weight":101,"slug":102},15,"Posters",60,"posters",{"id":104,"doc_module":22,"doc_module_name":25,"category_name":105,"show_sort_weight":106,"slug":107},16,"Social Media",50,"social-media",{"id":109,"doc_module":22,"doc_module_name":25,"category_name":29,"show_sort_weight":110,"slug":111},17,40,"forms",{"id":113,"doc_module":22,"doc_module_name":25,"category_name":114,"show_sort_weight":115,"slug":116},18,"Letters",30,"letters",{"id":118,"doc_module":22,"doc_module_name":25,"category_name":119,"show_sort_weight":120,"slug":121},21,"Paper Templates",5,"papers-templates",{"id":123,"doc_module":22,"doc_module_name":25,"category_name":124,"show_sort_weight":4,"slug":125},158,"General","general-158",{"code":4,"msg":82,"data":127},{"doc_id":79,"user_id":128,"nickname":42,"user_avatar":129,"doc_module":22,"category_id":109,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":130,"file_id":131,"file_url":132,"file_type":133,"file_size":134,"view_count":55,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":135,"language":136,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":137,"faqs":138,"seo_title":139,"seo_description":12,"update_tm":80,"read_time":140},4398048949847,"https://ap-avatar.wpscdn.com/avatar/400002536579ef2da7f?_k=1778318612642679267","CHESM – Pre-Job Safety Checklist\u000bJoin Operations – Standardized SHEERS Process\nApproved 23 May 2007\nRevised 31 Oct 2019\u000bVersion 1.0\n©2019 by Joint Operations\nThis document contains proprietary information of Joint Operations. Any use of this document without express, prior, written permission from Chevron Corporation and/or its affiliates is prohibited.\nPre-Job Safety Checklist\nThis checklist is used to review specific details pertinent to the job scope relative to contractor safety after the contractor has been selected. The review is to be conducted within a week or two of beginning work. This checklist may also be used for reviewing specific details for major jobs by existing contractors to ensure discussion of details pertinent to the job scope.\nGeneral Information\nPlant/location: \u0013 FORMTEXT \u0014     \u0015\nProject description: \u0013 FORMTEXT \u0014     \u0015\nContract/P.O. number: \u0013 FORMTEXT \u0014     \u0015\nContractor firm names (include sub-contractors): \u0013 FORMTEXT \u0014     \u0015\nContract firm’s local business address: \u0013 FORMTEXT \u0014     \u0015\nTelephone number: \u0013 FORMTEXT \u0014     \u0015\nEmail: \u0013 FORMTEXT \u0014     \u0015\nAlternate contact method: \u0013 FORMTEXT \u0014     \u0015\nSuperintendent/Leader’s\nName: \u0013 FORMTEXT \u0014     \u0015\nPhone:  (_____)______________________________\nWhat is the “work history” of the project/job superintendent (previous safety history)? \u0013 FORMTEXT \u0014     \u0015\nForeman’s\nName: \u0013 FORMTEXT \u0014     \u0015\nPhone:  (_____)_____________________________________\nContractor’s EHS representative:\nName: \u0013 FORMTEXT \u0014     \u0015\nPhone:  (_____)_____________________________________\nFull time  \u0013 FORMCHECKBOX \u0014\u0015    Part time \u0013 FORMCHECKBOX \u0014\u0015    As needed \u0013 FORMCHECKBOX \u0014\u0015\nProject start date: \u0013 FORMTEXT \u0014     \u0015\nExpected duration:  \u0013 FORMTEXT \u0014     \u0015\n\u0013 FORMTEXT \u0014     \u0015 Project manager\n\u0013 FORMTEXT \u0014     \u0015 Project contact\n\u0013 FORMTEXT \u0014     \u0015 Pre-job safety review facilitator\nDate of this review: \u0013 FORMTEXT \u0014     \u0015\n\u000fAttendees\nName\nTitle\nCompany\n\u000f\n\u000fLeadership\nReview project organization project leader, maintenance, and construction personnel, contract administrator, etc.\nYes\nReview safety expectations for each level involved in project, as well as the overall  project:\nContractor, project leader, plant personnel, etc.\nProject safety goals\nProject/turnaround incentives (if applicable)\nYes\nReview process for approval of scope changes after project is in progress.\nHow will safety be ensured as job scope changes or jobs added?\nYes   No   N/A\nRestricted areas within plant identified for the workers involved?\nYes   No   N/A\nHave contractor review progressive discipline policy for safety violations.\nYes   No   N/A\nExisting site safety performance and expectations for positive contribution.\nYes   No   N/A\nFacility Planning\nEnsure everyone familiar with selected work schedule: five work days/week of eight-hour/day, four work days/week of ten hour/day, 12 hour shifts, etc.\nYes   No\nGate/entrance assignment\nYes   No   N/A\nParking facilities\nYes   No   N/A\nTransportation of workers to work site:\nSeatbelts\nSpeed limits\nPedestrian travel\nPersonal vehicle/motorcycles allowed?\nYes   No   N/A\nFacility needs determined and plans in place to provide:\nOffice space\nRestroom/wash room/change room\nLunch room\nDrinking water\nTelephones\nContractor computer setup - ________ Intranet and email\nService shops notified and ready for additional work load (general repair shop, machine shop, sandblast booth, etc.)\nFabrication area\nYes   No   N/A\nIf a contractor supplies any portable temporary buildings, the contractor understands responsibility for:\nObtaining Fire Marshall approval or waivers\nPosting a copy of the certificate or letter of waiver on the doorway\nProviding building identification\nUsing an inspection checklist (if on site one month or more)\nIf occupied:\nExit signs\nStairways and landing platforms\nLocation/placement reviewed per API RP752 or applicable siting criteria\nYes   No   N/A\nIf a temporary hand wash or other sanitary stations required, are they drained to a sanitary sewer (not storm water outfall)?\nYes   No   N/A\nPlans in pla","cbCaik2tlaOMmyJo","https://ap.wps.com/l/cbCaik2tlaOMmyJo","docx",177316,23,"English","# Pre-Job Safety Checklist\n## General Information\n## Leadership\n## Facility Planning\n## Objective and Targets\n## Teams\n## Measurements\n## Work Process\n## Corrective Action/Preventive Action\n## Shared Learnings\n## Pre-Task Hazard Identification","[{\"question\":\"When should the pre-job safety checklist be completed?\",\"answer\":\"The review is conducted within a week or two after beginning work, following contractor selection. It can also be used for major jobs by existing contractors to ensure scope details are discussed.\"},{\"question\":\"What general information must be recorded in the checklist?\",\"answer\":\"It includes plant/location, project description, contract or P.O. number, contractor firm names (including subcontractors), local address, contact details, superintendent/foreman information, contractor EHS representative details, and expected project timing.\"},{\"question\":\"Which topics are covered under work process and safety management?\",\"answer\":\"The checklist addresses safety activity planning, periodic review and evaluation expectations, incident investigation expectations and methods, reporting distribution, corrective action tracking and validation, and shared learnings across site and functional specialties.\"}]","CHESM - Pre-Job Safety Checklist - Join Operations - Standardized SHEERS Process | DOCX",8]