[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-1-en-105":3,"doc-seo-241553-105":53,"doc-detail-241553-en":126},{"code":4,"msg":5,"data":6},0,"success",[7,14,19,24,29,34,39,44,49],{"id":8,"doc_module":9,"doc_module_name":10,"category_name":11,"show_sort_weight":12,"slug":13},11,1,"Template","Presentations",90,"presentations",{"id":15,"doc_module":9,"doc_module_name":10,"category_name":16,"show_sort_weight":17,"slug":18},12,"Resumes",80,"resumes",{"id":20,"doc_module":9,"doc_module_name":10,"category_name":21,"show_sort_weight":22,"slug":23},14,"Invoices",70,"invoices",{"id":25,"doc_module":9,"doc_module_name":10,"category_name":26,"show_sort_weight":27,"slug":28},15,"Posters",60,"posters",{"id":30,"doc_module":9,"doc_module_name":10,"category_name":31,"show_sort_weight":32,"slug":33},16,"Social Media",50,"social-media",{"id":35,"doc_module":9,"doc_module_name":10,"category_name":36,"show_sort_weight":37,"slug":38},17,"Forms",40,"forms",{"id":40,"doc_module":9,"doc_module_name":10,"category_name":41,"show_sort_weight":42,"slug":43},18,"Letters",30,"letters",{"id":45,"doc_module":9,"doc_module_name":10,"category_name":46,"show_sort_weight":47,"slug":48},21,"Paper Templates",5,"papers-templates",{"id":50,"doc_module":9,"doc_module_name":10,"category_name":51,"show_sort_weight":4,"slug":52},158,"General","general-158",{"code":4,"msg":54,"data":55},"ok",{"site_id":56,"language":57,"slug":58,"title":59,"keywords":60,"description":61,"schema_data":62,"social_meta":119,"head_meta":121,"extra_data":123,"updated_unix":125},105,"en","chesapeake-bay-tmdl-implementation-annual-status-report-form","Chesapeake Bay TMDL Implementation Annual Status Report - Form","","Annual status report form for Chesapeake Bay TMDL permittees to document implementation of Chesapeake Bay TMDL action plan BMPs. The report captures BMP types and locations, estimated pollutant reductions in pounds per year, and confirmation that BMPs were electronically reported and inspected via the DEQ BMP Warehouse. It also includes options to report newly implemented BMPs, annual practices, credit acquisition statements, and progress toward cumulative required reductions for total nitrogen and total phosphorus by basin when applicable.",{"@graph":63,"@context":118},[64,80,101],{"@type":65,"itemListElement":66},"BreadcrumbList",[67,71,74,77],{"item":68,"name":69,"@type":70,"position":9},"https://docshare.wps.com","Home","ListItem",{"item":72,"name":10,"@type":70,"position":73},"https://docshare.wps.com/template/",2,{"item":75,"name":36,"@type":70,"position":76},"https://docshare.wps.com/template/forms/",3,{"item":78,"name":59,"@type":70,"position":79},"https://docshare.wps.com/template/chesapeake-bay-tmdl-implementation-annual-status-report-form/241553/",4,{"url":78,"name":59,"@type":81,"image":82,"author":87,"headline":59,"publisher":90,"fileFormat":93,"inLanguage":57,"description":61,"dateModified":94,"datePublished":95,"encodingFormat":93,"isAccessibleForFree":96,"interactionStatistic":97},"DigitalDocument",{"url":83,"@type":84,"width":85,"height":86},"https://docshare.wps.com/thumbnails/chesapeake-bay-tmdl-implementation-annual-status-report-form/241553.png","ImageObject",442,249,{"name":88,"@type":89},"Clementine","Person",{"url":68,"name":91,"@type":92},"DocShare","Organization","application/pdf","2026-10-14","2026-09-12",true,{"@type":98,"interactionType":99,"userInteractionCount":25},"InteractionCounter",{"@type":100},"ViewAction",{"@type":102,"mainEntity":103},"FAQPage",[104,110,114],{"name":105,"@type":106,"acceptedAnswer":107},"What information must be provided for action plan BMPs implemented before the reporting period?","Question",{"text":108,"@type":109},"Provide a list of action plan BMPs (excluding annual practices), including BMP counts by type, estimated pollutant reductions achieved per type in pounds per year, and a confirmation statement that the BMPs were electronically reported and inspected using the DEQ BMP Warehouse.","Answer",{"name":111,"@type":106,"acceptedAnswer":112},"How should the form address BMPs implemented during the reporting period?",{"text":113,"@type":109},"Attach a list of newly implemented action plan BMPs (including annual practices implemented during the period), or select the option stating no BMPs were implemented. For newly implemented BMPs, include BMP type, location description, estimated pollutant reductions in pounds per year, and confirmation of electronic reporting to the DEQ BMP Warehouse.",{"name":115,"@type":106,"acceptedAnswer":116},"What additional data is required beyond BMP lists?",{"text":117,"@type":109},"The form includes a statement on whether credits were acquired during the reporting period, and it requires reporting progress toward meeting cumulative required reductions for total nitrogen and total phosphorus, specifying basin-specific 100% required and achieved reductions if multiple basins apply.","https://schema.org",{"og:url":78,"og:type":120,"og:title":59,"og:site_name":91,"og:description":61},"article",{"robots":122,"canonical":78},"index,follow",{"doc_id":124,"site_id":56},241553,1791672068,{"code":4,"msg":5,"data":127},{"doc_id":124,"user_id":128,"nickname":88,"user_avatar":129,"doc_module":9,"category_id":35,"category_name":36,"doc_title":59,"doc_description":61,"doc_content":130,"file_id":131,"file_url":132,"file_type":133,"file_size":134,"view_count":25,"is_deleted":4,"is_public":9,"is_downloadable":9,"audit_status":9,"page_count":76,"language":135,"language_code":57,"site_id":56,"html_lang":57,"table_of_contents":136,"faqs":137,"seo_title":138,"seo_description":61,"update_tm":139,"read_time":9},1374391974564,"https://ap-avatar.wpscdn.com/avatar/14000253aa45c000a9e?x-image-process=image/resize,m_fixed,w_180,h_180&k=1779874745381141002","Chesapeake Bay TMDL Implementafion Annual Status Report  \n\n| Permiftee Name: | Permit Number: | Reporfing Period: |  |  |\n| --- | --- | --- | --- | --- |\n|  |  |  |  |  |\n| Permit Requirement | Instrucfion | Response |  |  |\n| “[Include] a list of Chesapeake Bay TMDL acfion plan BMPs, not including annual pracfices, implemented prior to the reporfing period that includes the following informafion for reported BMPs: (a) the number of BMPs for each BMP type; (b) the esfimated reducfion of pollutants of concern achieved by each BMP type and reported in pounds of pollutant reducfion per year; and (c) a conﬁrmafion statement that the permiftee electronically reported Chesapeake Bay TMDL acfion plan BMPs inspected using the DEQ BMP Warehouse in accordance with Part III. B.5.” | Use the included “CBTMDL Annual Status Report BMP Template” excel ﬁle to document a list of Chesapeake Bay TMDL acfion plan BMPs implemented prior to the reporfing period. The included excel ﬁle includes ﬁelds for selecfing the BMP type and specifying the esfimated reducfion of pollutants of concern achieved by each BMP type. The excel ﬁle will also automafically count BMPs by type. A separate tab on the excel ﬁle can be used to report annual pracfices that were implemented during the reporfing period. Please check one of the responses in the next column. | Please check one: |  |  |\n|  |  |  ✔ A list of Chesapeake Bay TMDL acfion plan BMPs implemented prior to the reporfing period has beenaftached. |  |  |\n|  |  |  |  | A list was not aftached because |\n|  |  | there are no Chesapeake Bay TMDL acfion plan BMPs implemented to date. |  |  |\n|  | Please check one of the responses in the next column to conﬁrm that exisfing BMPs have been electronically reported to the DEQBMP Warehouse in accordance with Part III. B. | Please check one: |  |  |\n|  |  | ✔ All BMPs implemented and inspected, as applicable, between July 1 and June 30 of the reporfing period have been electronically reported to the DEQ BMP Warehouse in accordance with Part III. B. |  |  |\n|  |  |  BMPs implemented and inspected, as applicable, between July 1 and June 30 of the reporfing period have not been reported to the DEQ BMP Warehouse in accordance with Part III.B. Please indicate why reporfing was not completed below: |  |  |\n\nPage 1 of 3 | Rev. 08/09  \nChesapeake Bay TMDL Implementation Annual Status Report  \n\n| Permiftee Name: | Permit Number: | Reporfing Period: |\n| --- | --- | --- |\n|  |  |  |\n| Permit Requirement | Instrucfion | Response |\n| “[Include] a list of newly implemented BMPs including annual pracfices implemented during thereporfing period that includes the following informafion for each reported BMP or a statement that no BMPs were implemented during thereporfing period: (a) The BMP type and a descripfion of the locafion for each BMP; (b) the esfimated reducfion of pollutants of concern achieved by each BMP and reported in pounds of pollutant reducfion per year; and (c) a conﬁrmafion statement that the permiftee electronically reported BMPs using the DEQ BMP Warehouse in accordance with Part III. B.3.” | Use the included “CBTMDL Annual Status Report BMP Template” excel ﬁle to document a list of Chesapeake Bay TMDL acfion plan BMPs implemented during the reporfing period. The included excel ﬁle includes ﬁelds for selecfing the BMP type, BMP locafion and specifying theesfimated reducfion of pollutants of concern achieved by each BMP type. The excel ﬁle will also automafically count BMPs by type. A separate tab on the excel ﬁle can be used to report annual pracfices that were implemented during the reporfing period. Please check one of the responses in the next column. | Please check one:\u003Cbr> A list of Chesapeake Bay TMDL acfion plan BMPs implemented during the reporfing period has beenaftached.\u003Cbr>✔ A list was not aftached because there were no Chesapeake Bay TMDL acfion plan BMPs implemented during this reporfing period.\u003Cbr>|\n|  | Please check one of the responses in the next col","cbCairjijLClrWwC","https://ap.wps.com/l/cbCairjijLClrWwC","pdf",2356728,"English","# Chesapeake Bay TMDL Implementation Annual Status Report\n## Reporting requirements for implemented action plan BMPs\n## Reporting requirements for newly implemented BMPs and annual practices\n## Credit acquisition and progress toward cumulative reductions","[{\"question\":\"What information must be provided for action plan BMPs implemented before the reporting period?\",\"answer\":\"Provide a list of action plan BMPs (excluding annual practices), including BMP counts by type, estimated pollutant reductions achieved per type in pounds per year, and a confirmation statement that the BMPs were electronically reported and inspected using the DEQ BMP Warehouse.\"},{\"question\":\"How should the form address BMPs implemented during the reporting period?\",\"answer\":\"Attach a list of newly implemented action plan BMPs (including annual practices implemented during the period), or select the option stating no BMPs were implemented. For newly implemented BMPs, include BMP type, location description, estimated pollutant reductions in pounds per year, and confirmation of electronic reporting to the DEQ BMP Warehouse.\"},{\"question\":\"What additional data is required beyond BMP lists?\",\"answer\":\"The form includes a statement on whether credits were acquired during the reporting period, and it requires reporting progress toward meeting cumulative required reductions for total nitrogen and total phosphorus, specifying basin-specific 100% required and achieved reductions if multiple basins apply.\"}]","Chesapeake Bay TMDL Implementation Annual Status Report - Form | PDF",1789177467]