[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-1-en-105":3,"doc-seo-287267-105":53,"doc-detail-287267-en":126},{"code":4,"msg":5,"data":6},0,"success",[7,14,19,24,29,34,39,44,49],{"id":8,"doc_module":9,"doc_module_name":10,"category_name":11,"show_sort_weight":12,"slug":13},11,1,"Template","Presentations",90,"presentations",{"id":15,"doc_module":9,"doc_module_name":10,"category_name":16,"show_sort_weight":17,"slug":18},12,"Resumes",80,"resumes",{"id":20,"doc_module":9,"doc_module_name":10,"category_name":21,"show_sort_weight":22,"slug":23},14,"Invoices",70,"invoices",{"id":25,"doc_module":9,"doc_module_name":10,"category_name":26,"show_sort_weight":27,"slug":28},15,"Posters",60,"posters",{"id":30,"doc_module":9,"doc_module_name":10,"category_name":31,"show_sort_weight":32,"slug":33},16,"Social Media",50,"social-media",{"id":35,"doc_module":9,"doc_module_name":10,"category_name":36,"show_sort_weight":37,"slug":38},17,"Forms",40,"forms",{"id":40,"doc_module":9,"doc_module_name":10,"category_name":41,"show_sort_weight":42,"slug":43},18,"Letters",30,"letters",{"id":45,"doc_module":9,"doc_module_name":10,"category_name":46,"show_sort_weight":47,"slug":48},21,"Paper Templates",5,"papers-templates",{"id":50,"doc_module":9,"doc_module_name":10,"category_name":51,"show_sort_weight":4,"slug":52},158,"General","general-158",{"code":4,"msg":54,"data":55},"ok",{"site_id":56,"language":57,"slug":58,"title":59,"keywords":60,"description":61,"schema_data":62,"social_meta":119,"head_meta":121,"extra_data":123,"updated_unix":125},105,"en","certificate-of-completion-submittal-development-services-center","Certificate of Completion Submittal - Development Services Center","","This document serves as the official Certificate of Completion Submittal form for the City of Virginia Beach Development Services Center. It is designed for applicants seeking to have subdivision improvements accepted for city dedication, maintenance, or operation, marking the transition into the mandatory two-year defect period. The form outlines essential requirements, including final subdivision plats, approved as-built drawings, storm sewer CCTV inspections, and specific sureties such as landscaping and streetlights. Design professionals must certify the completion of construction in accordance with approved plans. This procedural framework ensures that all infrastructure standards are met before project acceptance, preventing potential delays in the handover process. The document provides a clear structure for applicants to verify their submittal package, document interactions with city staff, and provide justifications for any non-applicable requirements, thereby facilitating an efficient review by city authorities.",{"@graph":63,"@context":118},[64,80,101],{"@type":65,"itemListElement":66},"BreadcrumbList",[67,71,74,77],{"item":68,"name":69,"@type":70,"position":9},"https://docshare.wps.com","Home","ListItem",{"item":72,"name":10,"@type":70,"position":73},"https://docshare.wps.com/template/",2,{"item":75,"name":36,"@type":70,"position":76},"https://docshare.wps.com/template/forms/",3,{"item":78,"name":59,"@type":70,"position":79},"https://docshare.wps.com/template/certificate-of-completion-submittal-development-services-center/287267/",4,{"url":78,"name":59,"@type":81,"image":82,"author":87,"headline":59,"publisher":90,"fileFormat":93,"inLanguage":57,"description":61,"dateModified":94,"datePublished":95,"encodingFormat":93,"isAccessibleForFree":96,"interactionStatistic":97},"DigitalDocument",{"url":83,"@type":84,"width":85,"height":86},"https://docshare.wps.com/thumbnails/certificate-of-completion-submittal-development-services-center/287267.png","ImageObject",442,249,{"name":88,"@type":89},"Ivy","Person",{"url":68,"name":91,"@type":92},"DocShare","Organization","application/pdf","2026-09-23","2026-09-17",true,{"@type":98,"interactionType":99,"userInteractionCount":79},"InteractionCounter",{"@type":100},"ViewAction",{"@type":102,"mainEntity":103},"FAQPage",[104,110,114],{"name":105,"@type":106,"acceptedAnswer":107},"What is the purpose of the Certificate of Completion Submittal form?","Question",{"text":108,"@type":109},"The form is used to request that subdivision improvements be accepted by the City of Virginia Beach for dedication, maintenance, or operation, officially initiating the two-year defect period.","Answer",{"name":111,"@type":106,"acceptedAnswer":112},"What are the primary documentation requirements for this submittal?",{"text":113,"@type":109},"Applicants must provide a recorded final subdivision plat, approved overall subdivision as-built drawings, an approved storm sewer CCTV inspection report, and any necessary special sureties.",{"name":115,"@type":106,"acceptedAnswer":116},"Who is authorized to sign the certification section of the document?",{"text":117,"@type":109},"The certification must be signed by the Design Professional of record to confirm that all required items are included and that the subdivision was completed according to approved construction plans.","https://schema.org",{"og:url":78,"og:type":120,"og:title":59,"og:site_name":91,"og:description":61},"article",{"robots":122,"canonical":78},"index,follow",{"doc_id":124,"site_id":56},287267,1790002143,{"code":4,"msg":5,"data":127},{"doc_id":124,"user_id":128,"nickname":88,"user_avatar":129,"doc_module":9,"category_id":35,"category_name":36,"doc_title":59,"doc_description":61,"doc_content":130,"file_id":131,"file_url":132,"file_type":133,"file_size":134,"view_count":79,"is_deleted":4,"is_public":9,"is_downloadable":9,"audit_status":9,"page_count":9,"language":135,"language_code":57,"site_id":56,"html_lang":57,"table_of_contents":136,"faqs":137,"seo_title":138,"seo_description":61,"update_tm":139,"read_time":4},549758252649,"https://ap-avatar.wpscdn.com/avatar/8000253669c5317157?_k=1778319167496531819","Certificate of Completion Submittal  \nDEVELOPMENT SERVICES CENTER  \n[VirginiaBeach.gov/DSC](VirginiaBeach.gov/DSC)  \n(757) [385-4621 |](385-4621 | DSC@VBgov.com)[ ](385-4621 | DSC@VBgov.com)[DSC@VBgov.com](385-4621 | DSC@VBgov.com)  \nThis form is used to request that improvements constructed as part of a Subdivision Construction Plan be accepted for dedication, maintenance, or operation by the City. This is associated with the completion of all construction shown on the plans when the applicant is ready to enter the 2 year defect period.  \nThe following items are required to be completed prior to submittal. Please note that the submittal will be checked for completeness prior to acceptance. Incomplete submittals will not be certified as complete, and the project will not be eligible to enter the 2 year defect period.  \n1) Recorded Final Subdivision Plat  \n2) Approved Overall Subdivision As-Built Drawings  \n3) Approved Storm Sewer CCTV Inspection  \n4) Special Sureties (If Required)  \na) Landscaping (Street Trees and/or required buffer)  \nb) Final Layer of Asphalt  \nc) Streetlights  \nd) Subdivision As-built Drawings  \ne) Sidewalk for sidewalks not covered under residential building permits or Commercial Site plans  \nWhat is the name of the project and/or site location?  \nWhich City staff has been informed of this plan through meetings, phone conversations or emails?  \nWhat issues were discussed?  \nIf any required items are not included in the submittal package, list the associated item number below with a brief explanation for why the requirement is not applicable to this project.  \nCertification:  \nI certify as the Design Professional of record that all required items, excluding exceptions listed above, have been included in this submittal package and the above-referenced subdivision has been completed in accordance with the approved construction plan.  \nPrinted Name Signature Date  \nCertificate of Completion Submittal | rev. Sep-2025 pg. 1 of 1","cbCaijpIQlpZURzU","https://ap.wps.com/l/cbCaijpIQlpZURzU","pdf",741452,"English","# Certificate of Completion Submittal Requirements\n## Required Submittal Items\n## Project Certification Details","[{\"question\":\"What is the purpose of the Certificate of Completion Submittal form?\",\"answer\":\"The form is used to request that subdivision improvements be accepted by the City of Virginia Beach for dedication, maintenance, or operation, officially initiating the two-year defect period.\"},{\"question\":\"What are the primary documentation requirements for this submittal?\",\"answer\":\"Applicants must provide a recorded final subdivision plat, approved overall subdivision as-built drawings, an approved storm sewer CCTV inspection report, and any necessary special sureties.\"},{\"question\":\"Who is authorized to sign the certification section of the document?\",\"answer\":\"The certification must be signed by the Design Professional of record to confirm that all required items are included and that the subdivision was completed according to approved construction plans.\"}]","Certificate of Completion Submittal - Development Services Center | PDF",1789632088]