[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-1-en-105":3,"doc-seo-163064-105":53,"doc-detail-163064-en":127},{"code":4,"msg":5,"data":6},0,"success",[7,14,19,24,29,34,39,44,49],{"id":8,"doc_module":9,"doc_module_name":10,"category_name":11,"show_sort_weight":12,"slug":13},11,1,"Template","Presentations",90,"presentations",{"id":15,"doc_module":9,"doc_module_name":10,"category_name":16,"show_sort_weight":17,"slug":18},12,"Resumes",80,"resumes",{"id":20,"doc_module":9,"doc_module_name":10,"category_name":21,"show_sort_weight":22,"slug":23},14,"Invoices",70,"invoices",{"id":25,"doc_module":9,"doc_module_name":10,"category_name":26,"show_sort_weight":27,"slug":28},15,"Posters",60,"posters",{"id":30,"doc_module":9,"doc_module_name":10,"category_name":31,"show_sort_weight":32,"slug":33},16,"Social Media",50,"social-media",{"id":35,"doc_module":9,"doc_module_name":10,"category_name":36,"show_sort_weight":37,"slug":38},17,"Forms",40,"forms",{"id":40,"doc_module":9,"doc_module_name":10,"category_name":41,"show_sort_weight":42,"slug":43},18,"Letters",30,"letters",{"id":45,"doc_module":9,"doc_module_name":10,"category_name":46,"show_sort_weight":47,"slug":48},21,"Paper Templates",5,"papers-templates",{"id":50,"doc_module":9,"doc_module_name":10,"category_name":51,"show_sort_weight":4,"slug":52},158,"General","general-158",{"code":4,"msg":54,"data":55},"ok",{"site_id":56,"language":57,"slug":58,"title":59,"keywords":60,"description":61,"schema_data":62,"social_meta":120,"head_meta":122,"extra_data":124,"updated_unix":126},105,"en","cd-report-table-of-contents-template","CD Report Table of Contents Template","","CD report table-of-contents template covering the full workflow from introduction and foreword through purpose and need, existing inventory and condition, and traffic/crash summary. It includes social, economic, and environmental screening categories, evaluation of conceptual alternatives with analyses across hydrology, utilities, access, ITS, constructability, cost, value engineering, life-cycle costs, and risk. It also provides sections for preliminary preferred alternative selection and appendices containing supporting reports, maps, traffic counts, crash data, environmental constraint materials, communications, cost and risk documentation.",{"@graph":63,"@context":119},[64,80,102],{"@type":65,"itemListElement":66},"BreadcrumbList",[67,71,74,77],{"item":68,"name":69,"@type":70,"position":9},"https://docshare.wps.com","Home","ListItem",{"item":72,"name":10,"@type":70,"position":73},"https://docshare.wps.com/template/",2,{"item":75,"name":11,"@type":70,"position":76},"https://docshare.wps.com/template/presentations/",3,{"item":78,"name":59,"@type":70,"position":79},"https://docshare.wps.com/template/cd-report-table-of-contents-template/163064/",4,{"url":78,"name":59,"@type":81,"image":82,"author":87,"headline":59,"publisher":90,"fileFormat":93,"inLanguage":57,"description":61,"dateModified":94,"datePublished":95,"encodingFormat":93,"isAccessibleForFree":96,"interactionStatistic":97},"DigitalDocument",{"url":83,"@type":84,"width":85,"height":86},"https://docshare.wps.com/thumbnails/cd-report-table-of-contents-template/163064.png","ImageObject",442,249,{"name":88,"@type":89},"Gelato","Person",{"url":68,"name":91,"@type":92},"DocShare","Organization","application/vnd.openxmlformats-officedocument.wordprocessingml.document","2026-09-29","2026-08-31",true,{"@type":98,"interactionType":99,"userInteractionCount":101},"InteractionCounter",{"@type":100},"ViewAction",7,{"@type":103,"mainEntity":104},"FAQPage",[105,111,115],{"name":106,"@type":107,"acceptedAnswer":108},"What major sections are included in this CD report table of contents?","Question",{"text":109,"@type":110},"It covers Introduction, Purpose and Need, Existing Inventory and Condition, Traffic and Crash Summary, Social/Economic/Environmental Screening, Evaluation of Conceptual Alternatives, Concept Development Recommendation, and Appendices.","Answer",{"name":112,"@type":107,"acceptedAnswer":113},"How does the template support evaluating bridge rehabilitation versus replacement?",{"text":114,"@type":110},"It includes an evaluation of conceptual alternatives section that compares bridge rehabilitation and bridge replacement, along with traffic analysis, hydrology & hydraulics, right-of-way and utility impacts, constructability, cost, value engineering, life-cycle cost, and risk.",{"name":116,"@type":107,"acceptedAnswer":117},"What types of materials are listed under the appendices?",{"text":118,"@type":110},"Appendix items include problem statement/charter, latest-cycle bridge re-evaluation and scour reports, as-built plans and right-of-way maps, tax maps, crash data, traffic counts, aerial plans and photographs, constraint maps, communications documents, and supporting cost/risk analyses.","https://schema.org",{"og:url":78,"og:type":121,"og:title":59,"og:site_name":91,"og:description":61},"article",{"robots":123,"canonical":78},"index,follow",{"doc_id":125,"site_id":56},163064,1788136884,{"code":4,"msg":5,"data":128},{"doc_id":125,"user_id":129,"nickname":88,"user_avatar":130,"doc_module":9,"category_id":8,"category_name":11,"doc_title":59,"doc_description":61,"doc_content":131,"file_id":132,"file_url":133,"file_type":134,"file_size":135,"view_count":101,"is_deleted":4,"is_public":9,"is_downloadable":9,"audit_status":9,"page_count":76,"language":136,"language_code":57,"site_id":56,"html_lang":57,"table_of_contents":137,"faqs":138,"seo_title":139,"seo_description":61,"update_tm":126,"read_time":9},19241457091524,"https://us-avatar.wpscdn.com/davatar_276721f389ce27ea32af1340a28f341c","INTRODUCTION\nForeword\nOriginal and Successor Projects\nData Reviewed\nDesign Standards\nCharacteristics of the Roadways and Surrounding Area\nConcept Development Scope Statement\nCD Public Involvement Action Plan\nPURPOSE AND NEED\nBridge Needs\nScour Needs\nMaintenance Needs\nRoadway Needs\nGoals and Objectives\nEXISTING INVENTORY AND CONDITION\nExisting Bridge Inventory and Condition\nScour\nMaintenance Issues\nExisting Roadway Inventory and Condition\nExisting Utilities\nSummary of Existing Deficiencies\nList of Substandard Design Elements\nManagement Systems Input\nAs-Built Plans, Right of Way Maps and Jurisdiction Map\nTRAFFIC AND CRASH SUMMARY\nTraffic Operations\nTraffic Data\nTraffic Volume Forecasts\nCrash Data Analysis and Crash Diagram\nSOCIAL, ECONOMIC AND ENVIRONMENTAL SCREENING\nCommunity Outreach\nNoise and Air Quality\nSocioeconomics\nCultural Resources\nSection 4(f) Properties\nHighlands/Pinelands\nWetlands\nReforestation\nFloodplain\nSole Source Aquifer\nThreatened/Endangered Species\nCategory 1 Waters\nVernal Pools\nStormwater\nHazardous Waste\nAnticipated Environmental Permits or Approvals\nEnvironmental Summary with Probable NEPA Document required\nEVALUATION OF CONCEPTUAL ALTERNATIVES\nBridge Rehabilitation versus Bridge Replacement\nTemporary Bridge Location and Widening Constraints\nConceptual Alternatives\nTraffic Analysis\nHydrology & Hydraulics Analysis\nRight of Way Impacts and Review\nUtility Impacts\nITS Facilities\nComplete Streets Policy\nAccess Impacts and Review\nConstructability and Staging Plans and Detour Plan\nControlling Substandard Design Elements and Reasonable Assurance\nConstruction Cost Estimate\nValue Engineering Study and Report\nLife Cycle Cost Analysis\nAlternatives Matrix\nRisk Analysis Summary\nDiscussions with Subject Matter Experts\nPreliminary Preferred Alternative (PPA)\nPreliminary Engineering Scope Statement\nCONCEPT DEVELOPMENT RECOMMENDATION\nFederal Highway Administration (FHWA) Approval of Report\nCapital Program Screening Committee (CPSC) Recommendation\nCapital Program Committee (CPC) Approval\nAppendices\nProblem Statement/Charter\nBridge Re-evaluation Survey Report (latest cycle)\nBridge Scour Evaluation Report (latest cycle)\nAs-Built Plans, ROW Maps, and Jurisdiction Map\nTax Maps\nCrash Data\nTraffic Counts\nAerial Plan and Photographs\nStraight Line Diagrams\nTraffic Volumes (VPH) Graph\nCollision Diagrams\nEnvironmental Screening and Constraint Map\nConceptual Alignments, Right of Way Impacts, Environmental Constraints, Bridge Staging, Profile and Local Detour\nPublic Communications\nDesign Communications Report (DCR)\nResolutions of Support\nNJDOT Communications\nCost Estimates\nAlternatives Matrix\nRisk Register\nQuantitative Risk Analysis Report\nUtility Risk Assessment Plan\nComplete Streets Checklist\nLife Cycle Cost Analyses\nSystems Engineering Review Form\nPreliminary Engineering Public Involvement Action Plan\nPreliminary Engineering Scope Statement","cbCaibgMJzhpRXyh","https://ap.wps.com/l/cbCaibgMJzhpRXyh","docx",33589,"English","# Introduction\n## Foreword\n## Purpose and Need\n## Existing Inventory and Condition\n## Traffic and Crash Summary\n## Social, Economic and Environmental Screening\n## Evaluation of Conceptual Alternatives\n## Concept Development Recommendation\n## Appendices","[{\"question\":\"What major sections are included in this CD report table of contents?\",\"answer\":\"It covers Introduction, Purpose and Need, Existing Inventory and Condition, Traffic and Crash Summary, Social/Economic/Environmental Screening, Evaluation of Conceptual Alternatives, Concept Development Recommendation, and Appendices.\"},{\"question\":\"How does the template support evaluating bridge rehabilitation versus replacement?\",\"answer\":\"It includes an evaluation of conceptual alternatives section that compares bridge rehabilitation and bridge replacement, along with traffic analysis, hydrology \\u0026 hydraulics, right-of-way and utility impacts, constructability, cost, value engineering, life-cycle cost, and risk.\"},{\"question\":\"What types of materials are listed under the appendices?\",\"answer\":\"Appendix items include problem statement/charter, latest-cycle bridge re-evaluation and scour reports, as-built plans and right-of-way maps, tax maps, crash data, traffic counts, aerial plans and photographs, constraint maps, communications documents, and supporting cost/risk analyses.\"}]","CD Report Table of Contents Template | DOCX"]