[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-1-en-105":3,"doc-seo-200743-105":53,"doc-detail-200743-en":127},{"code":4,"msg":5,"data":6},0,"success",[7,14,19,24,29,34,39,44,49],{"id":8,"doc_module":9,"doc_module_name":10,"category_name":11,"show_sort_weight":12,"slug":13},11,1,"Template","Presentations",90,"presentations",{"id":15,"doc_module":9,"doc_module_name":10,"category_name":16,"show_sort_weight":17,"slug":18},12,"Resumes",80,"resumes",{"id":20,"doc_module":9,"doc_module_name":10,"category_name":21,"show_sort_weight":22,"slug":23},14,"Invoices",70,"invoices",{"id":25,"doc_module":9,"doc_module_name":10,"category_name":26,"show_sort_weight":27,"slug":28},15,"Posters",60,"posters",{"id":30,"doc_module":9,"doc_module_name":10,"category_name":31,"show_sort_weight":32,"slug":33},16,"Social Media",50,"social-media",{"id":35,"doc_module":9,"doc_module_name":10,"category_name":36,"show_sort_weight":37,"slug":38},17,"Forms",40,"forms",{"id":40,"doc_module":9,"doc_module_name":10,"category_name":41,"show_sort_weight":42,"slug":43},18,"Letters",30,"letters",{"id":45,"doc_module":9,"doc_module_name":10,"category_name":46,"show_sort_weight":47,"slug":48},21,"Paper Templates",5,"papers-templates",{"id":50,"doc_module":9,"doc_module_name":10,"category_name":51,"show_sort_weight":4,"slug":52},158,"General","general-158",{"code":4,"msg":54,"data":55},"ok",{"site_id":56,"language":57,"slug":58,"title":59,"keywords":60,"description":61,"schema_data":62,"social_meta":120,"head_meta":122,"extra_data":124,"updated_unix":126},105,"en","catp-cost-estimating-tool-final-20190531","CATP Cost Estimating Tool Final - 20190531","","CATP Cost Estimating Tool Final - 20190531 provides a structured worksheet for computing project cost estimates using repeatable rate and quantity inputs. The content includes numerous per-unit cost lines such as “Each,” “Per Intersection,” and “Per Approach,” supporting scenario-based costing across multiple elements. It also includes numeric parameters and multipliers (e.g., standard values like 0.05, 0.1, 0.15, 0.3) used to derive costs from baseline quantities.",{"@graph":63,"@context":119},[64,80,102],{"@type":65,"itemListElement":66},"BreadcrumbList",[67,71,74,77],{"item":68,"name":69,"@type":70,"position":9},"https://docshare.wps.com","Home","ListItem",{"item":72,"name":10,"@type":70,"position":73},"https://docshare.wps.com/template/",2,{"item":75,"name":21,"@type":70,"position":76},"https://docshare.wps.com/template/invoices/",3,{"item":78,"name":59,"@type":70,"position":79},"https://docshare.wps.com/template/catp-cost-estimating-tool-final-20190531/200743/",4,{"url":78,"name":59,"@type":81,"image":82,"author":87,"headline":59,"publisher":90,"fileFormat":93,"inLanguage":57,"description":61,"dateModified":94,"datePublished":95,"encodingFormat":93,"isAccessibleForFree":96,"interactionStatistic":97},"DigitalDocument",{"url":83,"@type":84,"width":85,"height":86},"https://docshare.wps.com/thumbnails/catp-cost-estimating-tool-final-20190531/200743.png","ImageObject",442,249,{"name":88,"@type":89},"McGucket","Person",{"url":68,"name":91,"@type":92},"DocShare","Organization","application/vnd.openxmlformats-officedocument.spreadsheetml.sheet","2026-10-14","2026-09-04",true,{"@type":98,"interactionType":99,"userInteractionCount":101},"InteractionCounter",{"@type":100},"ViewAction",9,{"@type":103,"mainEntity":104},"FAQPage",[105,111,115],{"name":106,"@type":107,"acceptedAnswer":108},"What pricing bases does the tool support?","Question",{"text":109,"@type":110},"It includes per-unit pricing options such as “Each,” “Per Intersection,” and “Per Approach,” enabling different costing rules for different elements.","Answer",{"name":112,"@type":107,"acceptedAnswer":113},"How are scenario quantities reflected in the estimate?",{"text":114,"@type":110},"Quantities are used alongside per-unit rules to calculate totals, with repeated rows indicating multiple cost items that follow the same structure.",{"name":116,"@type":107,"acceptedAnswer":117},"What role do the numeric multipliers play?",{"text":118,"@type":110},"Numeric parameter values (such as 0.05, 0.1, 0.15, and 0.3) act as multipliers or coefficients to adjust costs based on selected assumptions.","https://schema.org",{"og:url":78,"og:type":121,"og:title":59,"og:site_name":91,"og:description":61},"article",{"robots":123,"canonical":78},"index,follow",{"doc_id":125,"site_id":56},200743,1790922125,{"code":4,"msg":5,"data":128},{"doc_id":125,"user_id":129,"nickname":88,"user_avatar":130,"doc_module":9,"category_id":20,"category_name":21,"doc_title":59,"doc_description":61,"doc_content":131,"file_id":132,"file_url":133,"file_type":134,"file_size":135,"view_count":101,"is_deleted":4,"is_public":9,"is_downloadable":9,"audit_status":9,"page_count":9,"language":136,"language_code":57,"site_id":56,"html_lang":57,"table_of_contents":137,"faqs":138,"seo_title":139,"seo_description":61,"update_tm":140,"read_time":4},1236954412713,"https://us-avatar.wpscdn.com/davatar_29158cc5080c5b710cf443261637dec0","0\n1\n2\n3\n4\n5\n6\n7\n8\n1\n9\n10\n2\n11\n10\n3\n12\n10\n4\n13\n10\n5\n14\n10\n6\n15\n10\n7\n16\n10\n8\n17\n10\n18\n9\n19\nEach\n10\n20\nEach\n11\n21\nPer Intersection\n12\n22\nPer Approach\n23\n24\n25\n6\n26\n27\n19\n28\n27\n29\n28\n30\n31\n32\n30\n33\n32\n30\n34\n32\n30\n35\n36\n30\n37\n28\n30\n38\n32\n30\n39\n36\n30\n40\n32\n30\n41\n28\n30\n42\n36\n30\n43\n28\n30\n44\n28\n30\n45\n28\n46\n47\n36\n46\n48\n36\n46\n49\n36\n46\n50\n32\n46\n51\n32\n46\n52\n32\n46\n53\n36\n46\n20\n28\n46\n54\n28\n46\n21\n55\n46\n56\n57\n46\n58\n55\n59\n60\n36\n59\n61\n28\n59\n62\n36\n59\n63\n36\n59\n64\n28\n59\n65\n28\n59\n66\n36\n59\n67\n28\n59\n68\n28\n69\n22\n70\n69\n71\n55\n69\n72\n28\n69\n73\n28\n69\n74\n28\n69\n75\n55\n69\n76\n70\n69\n77\n28\n69\n78\n28\n69\n79\n28\n69\n80\n28\n69\n81\n28\n69\n82\n32\n69\n83\n28\n69\n84\n57\n85\n86\n87\n88\n89\n90\n91\n7\n92\n93\n94\n9\n10\n95\n96\n10\n97\n98\n11\n10\n99\n12\n10\n100\n101\n10\n102\n103\n104\n10\n105\n13\n10\n106\n107\n14\n10\n108\n109\n10\n110\n111\n10\n112\n15\n10\n113\n114\n16\n10\n115\n10\n116\n117\n118\n10\n119\n10\n17\n10\n120\n121\n6\n122\n123\n124\n5280\n123\n125\n600\n123\n126\n8.8\n127\n128\n0.05\n127\n129\n0.05\n127\n130\n0.1\n127\n131\n0.1\n127\n132\n0.15\n127\n133\n0.1\n134\n134\n0.3\n134\n135\n0.1\n134\n136\n0.3\n137\n9\n96\n11\n12\n101\n104\n13\n14\n109\n111\n15\n16\n115\n116\n118\n119\n17","cbCaiixHHxrAr6ys","https://ap.wps.com/l/cbCaiixHHxrAr6ys","xlsx",50574,"English","# Cost estimation inputs\n## Per-unit pricing rules\n## Parameter multipliers","[{\"question\":\"What pricing bases does the tool support?\",\"answer\":\"It includes per-unit pricing options such as “Each,” “Per Intersection,” and “Per Approach,” enabling different costing rules for different elements.\"},{\"question\":\"How are scenario quantities reflected in the estimate?\",\"answer\":\"Quantities are used alongside per-unit rules to calculate totals, with repeated rows indicating multiple cost items that follow the same structure.\"},{\"question\":\"What role do the numeric multipliers play?\",\"answer\":\"Numeric parameter values (such as 0.05, 0.1, 0.15, and 0.3) act as multipliers or coefficients to adjust costs based on selected assumptions.\"}]","CATP Cost Estimating Tool Final - 20190531 | XLSX",1788511740]