[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-1-en-105":3,"doc-seo-240086-105":53,"doc-detail-240086-en":127},{"code":4,"msg":5,"data":6},0,"success",[7,14,19,24,29,34,39,44,49],{"id":8,"doc_module":9,"doc_module_name":10,"category_name":11,"show_sort_weight":12,"slug":13},11,1,"Template","Presentations",90,"presentations",{"id":15,"doc_module":9,"doc_module_name":10,"category_name":16,"show_sort_weight":17,"slug":18},12,"Resumes",80,"resumes",{"id":20,"doc_module":9,"doc_module_name":10,"category_name":21,"show_sort_weight":22,"slug":23},14,"Invoices",70,"invoices",{"id":25,"doc_module":9,"doc_module_name":10,"category_name":26,"show_sort_weight":27,"slug":28},15,"Posters",60,"posters",{"id":30,"doc_module":9,"doc_module_name":10,"category_name":31,"show_sort_weight":32,"slug":33},16,"Social Media",50,"social-media",{"id":35,"doc_module":9,"doc_module_name":10,"category_name":36,"show_sort_weight":37,"slug":38},17,"Forms",40,"forms",{"id":40,"doc_module":9,"doc_module_name":10,"category_name":41,"show_sort_weight":42,"slug":43},18,"Letters",30,"letters",{"id":45,"doc_module":9,"doc_module_name":10,"category_name":46,"show_sort_weight":47,"slug":48},21,"Paper Templates",5,"papers-templates",{"id":50,"doc_module":9,"doc_module_name":10,"category_name":51,"show_sort_weight":4,"slug":52},158,"General","general-158",{"code":4,"msg":54,"data":55},"ok",{"site_id":56,"language":57,"slug":58,"title":59,"keywords":60,"description":61,"schema_data":62,"social_meta":120,"head_meta":122,"extra_data":124,"updated_unix":126},105,"en","cap1616-airspace-design-change-sponsor-update-request-form-version-15","CAP1616 Airspace Design Change Sponsor Update Request Form - Version 1.5","","This document is a formal request form for change sponsors to update their airspace change proposal timelines previously agreed upon with the CAA. It outlines the CAP 1616 requirement for submitting and reviewing these timelines to ensure adherence to decision timeframes. The form includes sections for the ACP reference number, change sponsor name, and a brief explanation for the timeline revision. It also features a table to compare current and proposed document submission deadlines and gateway dates for various stages of the Airspace Change Proposal (ACP) process, including DEFINE, DEVELOP & ASSESS, CONSULT, Formal ACP Submission, DECIDE, and Target AIRAC. The document is version 1.5, dated January 2024, and is intended for use by the CAA and change sponsors involved in airspace design and modification.",{"@graph":63,"@context":119},[64,80,102],{"@type":65,"itemListElement":66},"BreadcrumbList",[67,71,74,77],{"item":68,"name":69,"@type":70,"position":9},"https://docshare.wps.com","Home","ListItem",{"item":72,"name":10,"@type":70,"position":73},"https://docshare.wps.com/template/",2,{"item":75,"name":36,"@type":70,"position":76},"https://docshare.wps.com/template/forms/",3,{"item":78,"name":59,"@type":70,"position":79},"https://docshare.wps.com/template/cap1616-airspace-design-change-sponsor-update-request-form-version-15/240086/",4,{"url":78,"name":59,"@type":81,"image":82,"author":87,"headline":59,"publisher":90,"fileFormat":93,"inLanguage":57,"description":61,"dateModified":94,"datePublished":95,"encodingFormat":93,"isAccessibleForFree":96,"interactionStatistic":97},"DigitalDocument",{"url":83,"@type":84,"width":85,"height":86},"https://docshare.wps.com/thumbnails/cap1616-airspace-design-change-sponsor-update-request-form-version-15/240086.png","ImageObject",442,249,{"name":88,"@type":89},"Logic","Person",{"url":68,"name":91,"@type":92},"DocShare","Organization","application/pdf","2026-10-23","2026-09-11",true,{"@type":98,"interactionType":99,"userInteractionCount":101},"InteractionCounter",{"@type":100},"ViewAction",10,{"@type":103,"mainEntity":104},"FAQPage",[105,111,115],{"name":106,"@type":107,"acceptedAnswer":108},"What is the purpose of this form?","Question",{"text":109,"@type":110},"This form is used by change sponsors to formally request an update to previously agreed airspace change proposal timelines with the CAA, as required by CAP 1616.","Answer",{"name":112,"@type":107,"acceptedAnswer":113},"What information must be published by the change sponsor?",{"text":114,"@type":110},"The change sponsor is required to publish a record of this form, including the latest indicative dates, on the Airspace Change Portal at specific points in the process.",{"name":116,"@type":107,"acceptedAnswer":117},"What are the key stages of the ACP process outlined in the table?",{"text":118,"@type":110},"The table details current and proposed deadlines and gateway dates for stages such as DEFINE Gateway, DEVELOP & ASSESS Gateway, CONSULT Gateway, Formal ACP Submission, DECIDE Gateway, and Target AIRAC.","https://schema.org",{"og:url":78,"og:type":121,"og:title":59,"og:site_name":91,"og:description":61},"article",{"robots":123,"canonical":78},"index,follow",{"doc_id":125,"site_id":56},240086,1790869438,{"code":4,"msg":5,"data":128},{"doc_id":125,"user_id":129,"nickname":88,"user_avatar":130,"doc_module":9,"category_id":35,"category_name":36,"doc_title":59,"doc_description":61,"doc_content":131,"file_id":132,"file_url":133,"file_type":134,"file_size":135,"view_count":101,"is_deleted":4,"is_public":9,"is_downloadable":9,"audit_status":9,"page_count":9,"language":136,"language_code":57,"site_id":56,"html_lang":57,"table_of_contents":137,"faqs":138,"seo_title":139,"seo_description":61,"update_tm":140,"read_time":4},1099513958762,"https://ap-avatar.wpscdn.com/avatar/1000023916a998db790?x-image-process=image/resize,m_fixed,w_180,h_180&k=1784791008015729253","Airspace Change Proposal Change Sponsor Indicative Timeline Update Request Form  \nCAP 1616 requires change sponsors to submit a timeline for their airspace change proposal to the CAA so that it can be reviewed and agreed accordingly. In agreeing a timeline, the CAA is making a commitment to deliver the decision timeframes as specified in CAP 1616 for each of the four Gateway sign-offs, and for the decision on the final proposal, subject to the change sponsors meeting their own commitments.  \nThis form should be used by the change sponsor to formally request an update to airspace change proposal timelines that have previously been presented to/and agreed with the CAA.  \nThe change sponsor is required to publish a record of this form, including the latest indicative dates, on the Airspace Change Portal at the following points in the process (major timeline updates can and should be published outside of this as required):  \n\n|  | CURRENT DOCUMENT SUBMISSION DEADLINE | CURRENT GATEWAY DATE | PROPOSED DOCUMENT SUBMISSION DEADLINE | PROPOSED GATEWAY DATE |\n| --- | --- | --- | --- | --- |\n| DEFINE Gateway |  |  |  |  |\n| DEVELOP & ASSESS Gateway |  |  |  |  |\n| CONSULT Gateway |  |  |  |  |\n| Formal ACP Submission |  |  |  |  |\n| DECIDE Gateway |  |  |  |  |\n| Target AIRAC |  |  |  |  |\n\nACP Reference Number (ACP-YYYY-NNN):  \nChange Sponsor Name:  \nPlease briefly explain the need to revise the timelines:  \nFor CAA use only:  \nRevised timelines reviewed / agreed by (position):  \nDate:  \nVersion 1.5 January 2024  \nCAP1616: Airspace Design Change Sponsor Update Request Form","cbCaieS9MsC8rsnW","https://ap.wps.com/l/cbCaieS9MsC8rsnW","pdf",205805,"English","# Airspace Change Proposal\n## Indicative Timeline Update Request Form\n## Current Document Submission Deadline\n## Current Gateway Date\n## Proposed Document Submission Deadline\n## Proposed Gateway Date\n## DEFINE Gateway\n## DEVELOP & ASSESS Gateway\n## CONSULT Gateway\n## Formal ACP Submission\n## DECIDE Gateway\n## Target AIRAC\n## ACP Reference Number\n## Change Sponsor Name\n## Explanation for Revision\n## For CAA Use Only\n## Revised Timelines Reviewed / Agreed By","[{\"question\":\"What is the purpose of this form?\",\"answer\":\"This form is used by change sponsors to formally request an update to previously agreed airspace change proposal timelines with the CAA, as required by CAP 1616.\"},{\"question\":\"What information must be published by the change sponsor?\",\"answer\":\"The change sponsor is required to publish a record of this form, including the latest indicative dates, on the Airspace Change Portal at specific points in the process.\"},{\"question\":\"What are the key stages of the ACP process outlined in the table?\",\"answer\":\"The table details current and proposed deadlines and gateway dates for stages such as DEFINE Gateway, DEVELOP \\u0026 ASSESS Gateway, CONSULT Gateway, Formal ACP Submission, DECIDE Gateway, and Target AIRAC.\"}]","CAP1616 Airspace Design Change Sponsor Update Request Form - Version 1.5 | PDF",1789157037]