[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-250409-105":3,"detail-sidebar-cat-1-en-105":81,"doc-detail-250409-en":126},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":74,"head_meta":76,"extra_data":78,"updated_unix":80},105,"en","c-work-plan-summary-attachment-c-work-plan-detail-project-name","C-Work Plan Summary - Attachment C-Work Plan Detail - Project Name","","Attachment C provides a structured Work Plan Summary and detailed Work Plan for land acquisition activities under the WQIP program. It outlines project objectives and a step-by-step task framework for two pathways: conservation easement acquisition and fee simple acquisition. For each pathway, the plan specifies required documentation and deliverables including municipal notification (where applicable), appraisal reports, Phase I Environmental Assessments, title review and defect cure, surveys meeting DEC standards, baseline documentation, public access support materials, tiered AEM planning when applicable, and forest management plan submittals.",{"@graph":14,"@context":73},[15,34,56],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/template/","Template",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/template/presentations/","Presentations",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/template/c-work-plan-summary-attachment-c-work-plan-detail-project-name/250409/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/c-work-plan-summary-attachment-c-work-plan-detail-project-name/250409.png","ImageObject",442,249,{"name":42,"@type":43},"Putri","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-10-20","2026-09-12",true,{"@type":52,"interactionType":53,"userInteractionCount":55},"InteractionCounter",{"@type":54},"ViewAction",12,{"@type":57,"mainEntity":58},"FAQPage",[59,65,69],{"name":60,"@type":61,"acceptedAnswer":62},"What are the two main acquisition objectives covered in the attachment?","Question",{"text":63,"@type":64},"The attachment covers Objective 1: Conservation Easement Acquisition and Objective 2: Fee Simple Acquisition.","Answer",{"name":66,"@type":61,"acceptedAnswer":67},"Which documents are required for conservation easement acquisition?",{"text":68,"@type":64},"Key deliverables include landowner conservation easement agreement, appraisal reports, Phase I Environmental Assessment, title review with attorney approval, DEC-standard survey and baseline documentation report, Tier 3 AEM plan (if applicable), forest management plan (if applicable), public access documentation (if applicable), and recorded conservation easement with required notices.",{"name":70,"@type":61,"acceptedAnswer":71},"What is required to complete fee simple acquisition under the plan?",{"text":72,"@type":64},"Fee simple acquisition includes obtaining appraisal reports, executing a purchase and sale contract, providing municipal notification to DEC (not-for-profits only), completing public access documentation (if applicable), conducting Phase I Environmental Assessment, performing title review and cure title defects as needed, obtaining DEC-standard survey, confirming DEC review and approval of documents, and acquiring and recording the deed.","https://schema.org",{"og:url":32,"og:type":75,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":77,"canonical":32},"index,follow",{"doc_id":79,"site_id":7},250409,1791480438,{"code":4,"msg":82,"data":83},"success",[84,88,92,97,102,107,112,117,122],{"id":85,"doc_module":22,"doc_module_name":25,"category_name":29,"show_sort_weight":86,"slug":87},11,90,"presentations",{"id":55,"doc_module":22,"doc_module_name":25,"category_name":89,"show_sort_weight":90,"slug":91},"Resumes",80,"resumes",{"id":93,"doc_module":22,"doc_module_name":25,"category_name":94,"show_sort_weight":95,"slug":96},14,"Invoices",70,"invoices",{"id":98,"doc_module":22,"doc_module_name":25,"category_name":99,"show_sort_weight":100,"slug":101},15,"Posters",60,"posters",{"id":103,"doc_module":22,"doc_module_name":25,"category_name":104,"show_sort_weight":105,"slug":106},16,"Social Media",50,"social-media",{"id":108,"doc_module":22,"doc_module_name":25,"category_name":109,"show_sort_weight":110,"slug":111},17,"Forms",40,"forms",{"id":113,"doc_module":22,"doc_module_name":25,"category_name":114,"show_sort_weight":115,"slug":116},18,"Letters",30,"letters",{"id":118,"doc_module":22,"doc_module_name":25,"category_name":119,"show_sort_weight":120,"slug":121},21,"Paper Templates",5,"papers-templates",{"id":123,"doc_module":22,"doc_module_name":25,"category_name":124,"show_sort_weight":4,"slug":125},158,"General","general-158",{"code":4,"msg":82,"data":127},{"doc_id":79,"user_id":128,"nickname":42,"user_avatar":129,"doc_module":22,"category_id":85,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":130,"file_id":131,"file_url":132,"file_type":133,"file_size":134,"view_count":55,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":135,"language":136,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":137,"faqs":138,"seo_title":139,"seo_description":12,"update_tm":140,"read_time":26},962085571259,"https://ap-avatar.wpscdn.com/davatar_29158cc5080c5b710cf443261637dec0","ATTACHMENT C-WORK PLAN SUMMARY  \nPROJECT NAME:  \nCONTRACTOR SFS PAYEE NAME:  \nProject Name from Application  \n Awardee Title   \nCONTRACT PERIOD: From:  \nTo:  \nContract Period from Application  \nContract Period from Application  \nProject Summary: A high-level overview of the project, including the overall goal and desired outcomes.  \nBelow is a general outline WQIP Land Acquisition awardees can use when completing a project summary.  \n1. Primary goal of the project  \n2. Project Description  \na. Drinking water source description  \nb. Number of parcels and acres being acquired through this grant, conservation easement vs. fee title, water frontage, etc.  \nc. Whether the parcel(s) has existing riparian buffer(s) or if any required restoration work is needed (if applicable)  \nd. Proposed public access, forestry or agriculture activities (if applicable)  \n3. Performance Measures/Outcomes ofthe program  \n4. A brief description of the monitoring and stewardship protocols  \n5. A brief summary of the source of local match  \nContract Number: \\#   Page 1 of 1 , Attachment C-Work Plan Summary  \nATTACHMENT C-WORK PLAN  \nDETAIL  \n\n| Objective |  |\n| --- | --- |\n| 1 | Conservation Easement Acquisition |\n| Tasks |  |\n| 1.1 Secure agreement from landowner on conservation easement terms\u003Cbr>Performance Measures\u003Cbr>1.1.1 Landowner agreement-Executed agreement between landowner and awardee on steps for conservation easement. |  |\n| Tasks |  |\n| 1.2 Provide municipal notification letter to DEC (Not-for-profits only)\u003Cbr>Performance Measures\u003Cbr>1.2.1 Municipal notification of intent to acquire parcel-Obtain approval to acquire parcel from municipality. |  |\n| Tasks |  |\n| 1.3 Use WQIP Conservation Easement Template\u003Cbr>Performance Measures\u003Cbr>1.3.1 Submit conservation easement to DEC for review-Submit completed WQIP Conservation Easement Template to DEC for review and approval. |  |\n| Tasks |  |\n| 1.4 Obtain appraisal report(s)\u003Cbr>Performance Measures\u003Cbr>1.4.1 Appraisal report completed by a certified general real estate appraiser-The completed appraisal report will provide fair market value for conservation easement. |  |\n| Tasks |  |\n| 1.5 Complete a Phase I Environmental Assessment\u003Cbr>Performance Measures\u003Cbr>1.5.1 Phase I Environmental Assessment(s) -A completed assessment for acquisiton. |  |\n| Tasks |  |\n\n1.6 Complete title review, cure title defects if necessary for property, and obtain necessary reviews  \nPerformance Measures  \n1.6.1 Clear title/attorney approval-Confirmation by awardee counsel of clear title. Contract Number: \\#  \n_______________________  \nPage 1 of 5 , Attachment C-Work Plan Detail  \nATTACHMENT C-WORK PLAN  \nDETAIL  \n\n| Tasks |\n| --- |\n| 1.7 Complete a survey meeting DEC standards and a baseline documentation report for the property\u003Cbr>Performance Measures\u003Cbr>1.7.1 Survey and baseline documentation report-A survey will determine exact conservation easement acreage. A completed BDR by awardee staff. |\n| Tasks |\n| 1.8 Submit the completed Tier 3 Agriculutral Environmental Management (AEM) Plan (If applicable) Performance Measures\u003Cbr>1.8.1 Tier 3 AEM Plan-Submit completed AEM Tier 3 plan to DEC. |\n| Tasks |\n| 1.9 Submit completed Forest Management Plan (If applicable)\u003Cbr>Performance Measures\u003Cbr>1.9.1 Forest Management Plan-Submit completed Forest Management Plan to DEC. |\n| Tasks |\n\n1.10 Complete public access documentation (If applicable)  \nPerformance Measures  \n1.10.1 Public access description and maps-Obtain DEC approval for passive recreational activities.  \n\n| Tasks |\n| --- |\n| 1.11 Confirm DEC review and approval of all documents Performance Measures\u003Cbr>1.11.1 DEC approval-Confirmation from DEC for approved documents. |\n| Tasks |\n\n1.12 Purchase and record conservation easement  \nPerformance Measures  \n1.12.1 Record deed-Confirmation of recorded deed containing notice of grant at County Clerk's office with survey attached. Purchase price approved by DEC.  \nContract Number: \\#   Page 2 of 5 , Attachment C-Work Plan Detail  \n","cbCailvP7SmGzer8","https://ap.wps.com/l/cbCailvP7SmGzer8","pdf",2643025,6,"English","# Attachment C-Work Plan Summary\n## Project Summary\n## Performance Measures/Outcomes\n# Attachment C-Work Plan Detail\n## Objective 1: Conservation Easement Acquisition\n### Tasks and Performance Measures\n## Objective 2: Fee Simple Acquisition\n### Tasks and Performance Measures","[{\"question\":\"What are the two main acquisition objectives covered in the attachment?\",\"answer\":\"The attachment covers Objective 1: Conservation Easement Acquisition and Objective 2: Fee Simple Acquisition.\"},{\"question\":\"Which documents are required for conservation easement acquisition?\",\"answer\":\"Key deliverables include landowner conservation easement agreement, appraisal reports, Phase I Environmental Assessment, title review with attorney approval, DEC-standard survey and baseline documentation report, Tier 3 AEM plan (if applicable), forest management plan (if applicable), public access documentation (if applicable), and recorded conservation easement with required notices.\"},{\"question\":\"What is required to complete fee simple acquisition under the plan?\",\"answer\":\"Fee simple acquisition includes obtaining appraisal reports, executing a purchase and sale contract, providing municipal notification to DEC (not-for-profits only), completing public access documentation (if applicable), conducting Phase I Environmental Assessment, performing title review and cure title defects as needed, obtaining DEC-standard survey, confirming DEC review and approval of documents, and acquiring and recording the deed.\"}]","C-Work Plan Summary - Attachment C-Work Plan Detail - Project Name | PDF",1789254843]