[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-1-en-105":3,"doc-detail-241536-en":53,"doc-seo-241536-105":76},{"code":4,"msg":5,"data":6},0,"success",[7,14,19,24,29,34,39,44,49],{"id":8,"doc_module":9,"doc_module_name":10,"category_name":11,"show_sort_weight":12,"slug":13},11,1,"Template","Presentations",90,"presentations",{"id":15,"doc_module":9,"doc_module_name":10,"category_name":16,"show_sort_weight":17,"slug":18},12,"Resumes",80,"resumes",{"id":20,"doc_module":9,"doc_module_name":10,"category_name":21,"show_sort_weight":22,"slug":23},14,"Invoices",70,"invoices",{"id":25,"doc_module":9,"doc_module_name":10,"category_name":26,"show_sort_weight":27,"slug":28},15,"Posters",60,"posters",{"id":30,"doc_module":9,"doc_module_name":10,"category_name":31,"show_sort_weight":32,"slug":33},16,"Social Media",50,"social-media",{"id":35,"doc_module":9,"doc_module_name":10,"category_name":36,"show_sort_weight":37,"slug":38},17,"Forms",40,"forms",{"id":40,"doc_module":9,"doc_module_name":10,"category_name":41,"show_sort_weight":42,"slug":43},18,"Letters",30,"letters",{"id":45,"doc_module":9,"doc_module_name":10,"category_name":46,"show_sort_weight":47,"slug":48},21,"Paper Templates",5,"papers-templates",{"id":50,"doc_module":9,"doc_module_name":10,"category_name":51,"show_sort_weight":4,"slug":52},158,"General","general-158",{"code":4,"msg":5,"data":54},{"doc_id":55,"user_id":56,"nickname":57,"user_avatar":58,"doc_module":9,"category_id":8,"category_name":11,"doc_title":59,"doc_description":60,"doc_content":61,"file_id":62,"file_url":63,"file_type":64,"file_size":65,"view_count":66,"is_deleted":4,"is_public":9,"is_downloadable":9,"audit_status":9,"page_count":67,"language":68,"language_code":69,"site_id":70,"html_lang":69,"table_of_contents":71,"faqs":72,"seo_title":73,"seo_description":60,"update_tm":74,"read_time":75},241536,2336464648322,"Aria","https://ap-avatar.wpscdn.com/avatar/2200025388227c56fec?_k=1778556882303663488","BIM Project Execution Planning Guide - Version 2.2 - eBook","BIM Project Execution Planning Guide - Version 2.2 provides a structured approach to planning building information modeling execution. It covers identifying project goals and BIM uses, designing the planning process, defining information exchanges, and specifying supporting infrastructure. The guide also explains implementation procedures, organizational execution planning, and concludes with recommendations. Supporting materials include worksheets for BIM goals and use descriptions, analysis worksheets, process map templates, information exchange sheets, an execution plan template, and a glossary, plus version history and citation resources.","BIM Project Execution Planning Guide-Version 2.2  \nBIM Project Execution Planning Guide-Version 2.2  \nJOHN MESSNER, CHIMAY ANUMBA, CRAIG DUBLER, SEAN GOODMAN, COLLEEN KASPRZAK, RALPH KREIDER, ROBERT LEICHT, CHITWAN SALUJA, AND NEVENA ZIKIC  \nCOMPUTER INTEGRATED CONSTRUCTION RESEARCH PROGRAM, PENN STATE  \nUNIVERSITY PARK, PA, USA  \nBIM Project Execution Planning Guide-Version 2.2 by Computer Integration Construction Research Program is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License, except where otherwise noted.  \nContents  \neBook Introduction ix  \nExecutive Summary 1  \nAuthors and Contributors 4  \nReader’s Guide 5  \nAcknowledgements 7  \nCitation 9  \n1. Overview of the BIM Execution Planning 11  \nProcedure for Building Information Modeling  \n2. Identify Project Goals and BIM Uses 24  \n3. Designing the BIM Project Execution Planning 33  \nProcess  \n4. Developing Information Exchanges 42  \n5. Define Supporting Infrastructure for BIM 48  \nImplementation  \n6. Implementing the BIM Project Execution Planning 61  \nProcedure  \n7.  BIM Project Execution Planning for Organizations 66  \n8. Conclusions and Recommendations 71  \nAppendix A: BIM Goals Worksheet 75  \nAppendix B: BIM Use Descriptions 76  \nAppendix B-1: BIM Use: Building (Preventative) 77  \nMaintenance Scheduling  \nAppendix B-2: BIM Use – Building Systems 79  \nAnalysis  \nAppendix B-3: BIM Use: Asset Management 81  \nAppendix B-4: BIM Use: Space Management and 84  \nTracking  \nAppendix B-5: BIM Use: Emergency Management 86  \nAppendix B-6: BIM Use: Record Modeling 88  \nAppendix B-7: BIM Use: Site Utilization Planning 91  \nAppendix B-8: BIM Use: Construction System 94  \nDesign  \nAppendix B-9: BIM Use: Digital Fabrication 96  \nAppendix B-10: BIM Use: 3D Control and Planning 98  \n(Digital Layout)  \nAppendix B-11: BIM Use: 3D Coordination 100  \nAppendix B-12: BIM Use: Design Authoring 102  \nAppendix B-13: BIM Use: Engineering Analysis 104  \nAppendix B-14: BIM Use: Energy Analysis 106  \nAppendix B-15: BIM Use: Structural Analysis 108  \nAppendix B-16: BIM Use: Lighting Analysis 111  \nAppendix B-17: BIM Use: Sustainability Analysis 112  \nAppendix B-18: BIM Use: Code Validation 114  \nAppendix B-19: BIM Use: Design Review 116  \nAppendix B-20: BIM Use: Programming 119  \nAppendix B-21: BIM Use: Site Analysis 121  \nAppendix B-22: BIM Use: Phase Planning (4D 123  \nModeling)  \nAppendix B-23: BIM Use: Cost Estimation 125  \n(Quantity Take-Off)  \nAppendix B-24: BIM Use: Existing Conditions 128  \nModeling  \nAppendix C: BIM Use Analysis Worksheet 131  \nAppendix D: Process Map Templates 132  \nAppendix E: Example Process Maps for Sample 141  \nLaboratory Project  \nAppendix F: Information Exchange Worksheet 145  \nAppendix G: BIM Project Execution Plan Template 148  \nAppendix H: BIM Execution Planning Category 150  \nComparison  \nAppendix I: Version History 151  \nAppendix J: Links to All Template Documents 153  \nAppendix K: Citations and Sources for Additional 154  \nInformation  \nAppendix L: Glossary 155  \neBook Introduction  \nThis online book is available at: [https://psu.pb.unizin.org/](https://psu.pb.unizin.org/)[ ](https://psu.pb.unizin.org/)[bimprojectexecutionplanningv2x2/](bimprojectexecutionplanningv2x2/)  \nYou may wish to bookmark this page in your browser.  \nWe like to keep everyone informed of revisions to our BIM Guide Series, along with other research and continuing education events related to BIM. If you have not already signed up for Guide updates prior to arriving at this page, please do so at the link below. We do not send many email messages, and never share our contact list with others.  \n Link to sign up for BIM Guide updates   \nYou will need to download the template documents from a browser application on your computer or mobile device.","cbCaivoS8eLHu3yZ","https://ap.wps.com/l/cbCaivoS8eLHu3yZ","pdf",11799826,10,168,"English","en",105,"# eBook Introduction\n# Executive Summary\n# Authors and Contributors\n# Reader’s Guide\n# Acknowledgements\n# Citation\n# 1. Overview of the BIM Execution Planning Procedure for Building Information Modeling\n# 2. Identify Project Goals and BIM Uses\n# 3. Designing the BIM Project Execution Planning Process\n# 4. Developing Information Exchanges\n# 5. Define Supporting Infrastructure for BIM Implementation\n# 6. Implementing the BIM Project Execution Planning Procedure\n# 7. BIM Project Execution Planning for Organizations\n# 8. Conclusions and Recommendations\n# Appendix A: BIM Goals Worksheet\n# Appendix B: BIM Use Descriptions\n# Appendix C: BIM Use Analysis Worksheet\n# Appendix D: Process Map Templates\n# Appendix E: Example Process Maps for Sample Laboratory Project\n# Appendix F: Information Exchange Worksheet\n# Appendix G: BIM Project Execution Plan Template\n# Appendix H: BIM Execution Planning Category Comparison\n# Appendix I: Version History\n# Appendix J: Links to All Template Documents\n# Appendix K: Citations and Sources for Additional Information\n# Appendix L: Glossary","[{\"question\":\"What does the guide cover for BIM project execution planning?\",\"answer\":\"It covers an end-to-end planning procedure: identifying project goals and BIM uses, designing the execution planning process, developing information exchanges, and defining supporting infrastructure, then implementing it and applying it to organizations.\"},{\"question\":\"How are information exchanges handled in the guide?\",\"answer\":\"The guide includes a dedicated section for developing information exchanges and provides worksheet templates to support exchange definitions and documentation needs.\"},{\"question\":\"Which templates and worksheets are provided as appendices?\",\"answer\":\"Appendices include a BIM goals worksheet, BIM use descriptions (with multiple use-specific items), a BIM use analysis worksheet, process map templates and examples, an information exchange worksheet, and a BIM project execution plan template, plus glossary and citations/resources.\"}]","BIM Project Execution Planning Guide - Version 2.2 - eBook | PDF",1789176986,59,{"code":4,"msg":77,"data":78},"ok",{"site_id":70,"language":69,"slug":79,"title":59,"keywords":80,"description":60,"schema_data":81,"social_meta":137,"head_meta":139,"extra_data":141,"updated_unix":142},"bim-project-execution-planning-guide-version-22-ebook","",{"@graph":82,"@context":136},[83,99,119],{"@type":84,"itemListElement":85},"BreadcrumbList",[86,90,93,96],{"item":87,"name":88,"@type":89,"position":9},"https://docshare.wps.com","Home","ListItem",{"item":91,"name":10,"@type":89,"position":92},"https://docshare.wps.com/template/",2,{"item":94,"name":11,"@type":89,"position":95},"https://docshare.wps.com/template/presentations/",3,{"item":97,"name":59,"@type":89,"position":98},"https://docshare.wps.com/template/bim-project-execution-planning-guide-version-22-ebook/241536/",4,{"url":97,"name":59,"@type":100,"image":101,"author":106,"headline":59,"publisher":108,"fileFormat":111,"inLanguage":69,"description":60,"dateModified":112,"datePublished":113,"encodingFormat":111,"isAccessibleForFree":114,"interactionStatistic":115},"DigitalDocument",{"url":102,"@type":103,"width":104,"height":105},"https://docshare.wps.com/thumbnails/bim-project-execution-planning-guide-version-22-ebook/241536.png","ImageObject",442,249,{"name":57,"@type":107},"Person",{"url":87,"name":109,"@type":110},"DocShare","Organization","application/pdf","2026-10-11","2026-09-12",true,{"@type":116,"interactionType":117,"userInteractionCount":92},"InteractionCounter",{"@type":118},"ViewAction",{"@type":120,"mainEntity":121},"FAQPage",[122,128,132],{"name":123,"@type":124,"acceptedAnswer":125},"What does the guide cover for BIM project execution planning?","Question",{"text":126,"@type":127},"It covers an end-to-end planning procedure: identifying project goals and BIM uses, designing the execution planning process, developing information exchanges, and defining supporting infrastructure, then implementing it and applying it to organizations.","Answer",{"name":129,"@type":124,"acceptedAnswer":130},"How are information exchanges handled in the guide?",{"text":131,"@type":127},"The guide includes a dedicated section for developing information exchanges and provides worksheet templates to support exchange definitions and documentation needs.",{"name":133,"@type":124,"acceptedAnswer":134},"Which templates and worksheets are provided as appendices?",{"text":135,"@type":127},"Appendices include a BIM goals worksheet, BIM use descriptions (with multiple use-specific items), a BIM use analysis worksheet, process map templates and examples, an information exchange worksheet, and a BIM project execution plan template, plus glossary and citations/resources.","https://schema.org",{"og:url":97,"og:type":138,"og:title":59,"og:site_name":109,"og:description":60},"article",{"robots":140,"canonical":97},"index,follow",{"doc_id":55,"site_id":70},1791741477]