[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-detail-166491-en":3,"doc-seo-166491-105":30,"detail-sidebar-cat-1-en-105":91},{"code":4,"msg":5,"data":6},0,"success",{"doc_id":7,"user_id":8,"nickname":9,"user_avatar":10,"doc_module":11,"category_id":12,"category_name":13,"doc_title":14,"doc_description":15,"doc_content":16,"file_id":17,"file_url":18,"file_type":19,"file_size":20,"view_count":4,"is_deleted":4,"is_public":11,"is_downloadable":11,"audit_status":11,"page_count":21,"language":22,"language_code":23,"site_id":24,"html_lang":23,"table_of_contents":25,"faqs":26,"seo_title":27,"seo_description":15,"update_tm":28,"read_time":29},166491,13056712833777,"Paura","https://ap-avatar.wpscdn.com/davatar_29158cc5080c5b710cf443261637dec0",1,11,"Presentations","BIM Project Execution Plan - Version 1.05 - template","BIM Project Execution Plan template (Version 1.05) supports development of a contract-required BIM execution plan. It is derived from the buildingSMART alliance™ Project “BIM Project Execution Planning” created by Penn State’s CIC Research Group and sponsored by leading construction industry organizations. The template can be replaced with a company cover sheet and guides completion by defining BIM uses, process design across the project lifecycle, project information and milestones, key contacts, goals and BIM uses, organizational roles, exchanges, data requirements, collaboration procedures, quality control, infrastructure needs, model structure, deliverables, delivery strategy, and attachments. It is licensed under Creative Commons BY-SA 3.0 US.","BIM PROJECT EXECUTION PLAN\nVersion 1.05\nFOR\n[PROJECT TITLE]\nDEVELOPED BY\n[AUTHOR COMPANY]\nThis template is a tool that is provided to assist in the development of a BIM project execution plan as required per contract. The template plan was created from the buildingSMART alliance™ (bSa) Project “BIM Project Execution Planning” as developed by The Computer Integrated Construction (CIC) Research Group of The Pennsylvania State University. The bSa project is sponsored by The Charles Pankow Foundation (\u0013 HYPERLINK \"http://www.pankowfoundation.org\" \u0014http://www.pankowfoundation.org\u0015), Construction Industry Institute (CII) (\u0013 HYPERLINK \"http://www.construction‐institute.org\" \u0014http://www.construction‐institute.org\u0015), Penn State Office of Physical Plant (OPP) (\u0013 HYPERLINK \"http://www.opp.psu.edu\" \u0014http://www.opp.psu.edu\u0015), and The Partnership for Achieving Construction Excellence (PACE) (\u0013 HYPERLINK \"http://www.engr.psu.edu/pace\" \u0014http://www.engr.psu.edu/pace\u0015). The BIM Project Execution Planning Guide can be downloaded at \u0013 HYPERLINK \"http://www.engr.psu.edu/BIM/PxP\" \u0014http://www.engr.psu.edu/BIM/PxP\u0015.\nThis coversheet can be replaced by a company specific coversheet that includes at a minimum document title, project title, project location, author company, and project number.\nThis work is licensed under the Creative Commons Attribution-Share Alike 3.0 United States License. To view a copy of this license, visit http://creativecommons.org/licenses/by-sa/3.0/us/ or send a letter to Creative Commons, 171 Second Street, Suite 300, San Francisco, California, 94105, USA.\nBIM PROJECT EXECUTION PLAN\nVersion 1.05\nFOR\n[PROJECT TITLE]\nDEVELOPED BY\n[AUTHOR COMPANY]\nTable of Contents\n\u0013 TOC \\o \"1-1\" \\h \\z \\u \u0014\u0013 HYPERLINK \\l \"_Toc254593271\" \u0014Section A: \tBIM Project Execution Plan Overview\t\u0013 PAGEREF _Toc254593271 \\h \u00141\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc254593272\" \u0014Section B: \tProject Information\t\u0013 PAGEREF _Toc254593272 \\h \u00142\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc254593273\" \u0014Section C: \tKey Project Contacts\t\u0013 PAGEREF _Toc254593273 \\h \u00143\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc254593274\" \u0014Section D: \tProject Goals / BIM Uses\t\u0013 PAGEREF _Toc254593274 \\h \u00144\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc254593275\" \u0014Section E: \tOrganizational Roles / Staffing\t\u0013 PAGEREF _Toc254593275 \\h \u00145\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc254593276\" \u0014Section F: \tBIM Process Design\t\u0013 PAGEREF _Toc254593276 \\h \u00146\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc254593277\" \u0014Section G: \tBIM Information Exchanges\t\u0013 PAGEREF _Toc254593277 \\h \u00147\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc254593278\" \u0014Section H: \tBIM and Facility Data Requirements\t\u0013 PAGEREF _Toc254593278 \\h \u00148\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc254593279\" \u0014Section I: \tCollaboration Procedures\t\u0013 PAGEREF _Toc254593279 \\h \u00149\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc254593280\" \u0014Section J: \tQuality Control\t\u0013 PAGEREF _Toc254593280 \\h \u001411\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc254593281\" \u0014Section K:\tTechnological Infrastructure Needs\t\u0013 PAGEREF _Toc254593281 \\h \u001412\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc254593282\" \u0014Section L: \tModel Structure\t\u0013 PAGEREF _Toc254593282 \\h \u001413\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc254593283\" \u0014Section M: \tProject Deliverables\t\u0013 PAGEREF _Toc254593283 \\h \u001414\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc254593284\" \u0014Section N: \tDelivery Strategy / Contract\t\u0013 PAGEREF _Toc254593284 \\h \u001415\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc254593285\" \u0014Section O: \tAttachments\t\u0013 PAGEREF _Toc254593285 \\h \u001416\u0015\u0015\n\u0015\nSection A: BIM Project Execution Plan Overview\nTo successfully implement Building Information Modeling (BIM) on a project, the project team has developed this detailed BIM Project Execution Plan. The BIM Project Execution Plan defines uses for BIM on the project (e.g. design authoring, cost estimating, and design coordination), along with a detailed design of the process for executing BIM throughout the project lifecycle.\n[INSERT ADDITIONAL INFORMATION HERE IF APPLICABLE. FOR EXAMPLE: BIM MISSION STATEMENT This is the location to provide additional BIM overview information. Additional detailed information can be included as an attachment to this document.\nPlease note: Instructions and examples to assist with the completion of this guide are currently in grey. ","cbCaitmeyFYqAOKn","https://ap.wps.com/l/cbCaitmeyFYqAOKn","docx",1247983,18,"English","en",105,"# Section A: BIM Project Execution Plan Overview\n# Section B: Project Information\n# Section C: Key Project Contacts\n# Section D: Project Goals / BIM Uses\n# Section E: Organizational Roles / Staffing\n# Section F: BIM Process Design\n# Section G: BIM Information Exchanges\n# Section H: BIM and Facility Data Requirements\n# Section I: Collaboration Procedures\n# Section J: Quality Control\n# Section K: Technological Infrastructure Needs\n# Section L: Model Structure\n# Section M: Project Deliverables\n# Section N: Delivery Strategy / Contract\n# Section O: Attachments","[{\"question\":\"What is the purpose of this BIM Project Execution Plan template?\",\"answer\":\"It assists in developing a contract-required BIM project execution plan by defining BIM uses and a detailed process to execute BIM across the project lifecycle.\"},{\"question\":\"Which sections are included in the template?\",\"answer\":\"The template includes sections covering project information, key contacts, BIM goals and uses, organizational roles, process design, information exchanges, data requirements, collaboration procedures, quality control, infrastructure needs, model structure, deliverables, delivery strategy/contract, and attachments.\"},{\"question\":\"How should additional project and BIM overview information be handled?\",\"answer\":\"The cover can be replaced with company-specific content, and the template includes placeholders for project title, location, author company, and additional BIM overview information that can be customized or added as attachments.\"}]","BIM Project Execution Plan - Version 1.05 - template | DOCX",1788193976,6,{"code":4,"msg":31,"data":32},"ok",{"site_id":24,"language":23,"slug":33,"title":14,"keywords":34,"description":15,"schema_data":35,"social_meta":86,"head_meta":88,"extra_data":90,"updated_unix":28},"bim-project-execution-plan-version-105-template","",{"@graph":36,"@context":85},[37,54,68],{"@type":38,"itemListElement":39},"BreadcrumbList",[40,44,48,51],{"item":41,"name":42,"@type":43,"position":11},"https://docshare.wps.com","Home","ListItem",{"item":45,"name":46,"@type":43,"position":47},"https://docshare.wps.com/template/","Template",2,{"item":49,"name":13,"@type":43,"position":50},"https://docshare.wps.com/template/presentations/",3,{"item":52,"name":14,"@type":43,"position":53},"https://docshare.wps.com/template/bim-project-execution-plan-version-105-template/166491/",4,{"url":52,"name":14,"@type":55,"author":56,"headline":14,"publisher":58,"fileFormat":61,"inLanguage":23,"description":15,"dateModified":62,"datePublished":62,"encodingFormat":61,"isAccessibleForFree":63,"interactionStatistic":64},"DigitalDocument",{"name":9,"@type":57},"Person",{"url":41,"name":59,"@type":60},"DocShare","Organization","application/vnd.openxmlformats-officedocument.wordprocessingml.document","2026-08-31",true,{"@type":65,"interactionType":66,"userInteractionCount":4},"InteractionCounter",{"@type":67},"ViewAction",{"@type":69,"mainEntity":70},"FAQPage",[71,77,81],{"name":72,"@type":73,"acceptedAnswer":74},"What is the purpose of this BIM Project Execution Plan template?","Question",{"text":75,"@type":76},"It assists in developing a contract-required BIM project execution plan by defining BIM uses and a detailed process to execute BIM across the project lifecycle.","Answer",{"name":78,"@type":73,"acceptedAnswer":79},"Which sections are included in the template?",{"text":80,"@type":76},"The template includes sections covering project information, key contacts, BIM goals and uses, organizational roles, process design, information exchanges, data requirements, collaboration procedures, quality control, infrastructure needs, model structure, deliverables, delivery strategy/contract, and attachments.",{"name":82,"@type":73,"acceptedAnswer":83},"How should additional project and BIM overview information be handled?",{"text":84,"@type":76},"The cover can be replaced with company-specific content, and the template includes placeholders for project title, location, author company, and additional BIM overview information that can be customized or added as attachments.","https://schema.org",{"og:url":52,"og:type":87,"og:title":14,"og:site_name":59,"og:description":15},"article",{"robots":89,"canonical":52},"index,follow",{"doc_id":7,"site_id":24},{"code":4,"msg":5,"data":92},[93,96,101,106,111,116,121,125,130],{"id":12,"doc_module":11,"doc_module_name":46,"category_name":13,"show_sort_weight":94,"slug":95},90,"presentations",{"id":97,"doc_module":11,"doc_module_name":46,"category_name":98,"show_sort_weight":99,"slug":100},12,"Resumes",80,"resumes",{"id":102,"doc_module":11,"doc_module_name":46,"category_name":103,"show_sort_weight":104,"slug":105},14,"Invoices",70,"invoices",{"id":107,"doc_module":11,"doc_module_name":46,"category_name":108,"show_sort_weight":109,"slug":110},15,"Posters",60,"posters",{"id":112,"doc_module":11,"doc_module_name":46,"category_name":113,"show_sort_weight":114,"slug":115},16,"Social Media",50,"social-media",{"id":117,"doc_module":11,"doc_module_name":46,"category_name":118,"show_sort_weight":119,"slug":120},17,"Forms",40,"forms",{"id":21,"doc_module":11,"doc_module_name":46,"category_name":122,"show_sort_weight":123,"slug":124},"Letters",30,"letters",{"id":126,"doc_module":11,"doc_module_name":46,"category_name":127,"show_sort_weight":128,"slug":129},21,"Paper Templates",5,"papers-templates",{"id":131,"doc_module":11,"doc_module_name":46,"category_name":132,"show_sort_weight":4,"slug":133},158,"General","general-158"]