[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-1-en-105":3,"doc-seo-244619-105":53,"doc-detail-244619-en":126},{"code":4,"msg":5,"data":6},0,"success",[7,14,19,24,29,34,39,44,49],{"id":8,"doc_module":9,"doc_module_name":10,"category_name":11,"show_sort_weight":12,"slug":13},11,1,"Template","Presentations",90,"presentations",{"id":15,"doc_module":9,"doc_module_name":10,"category_name":16,"show_sort_weight":17,"slug":18},12,"Resumes",80,"resumes",{"id":20,"doc_module":9,"doc_module_name":10,"category_name":21,"show_sort_weight":22,"slug":23},14,"Invoices",70,"invoices",{"id":25,"doc_module":9,"doc_module_name":10,"category_name":26,"show_sort_weight":27,"slug":28},15,"Posters",60,"posters",{"id":30,"doc_module":9,"doc_module_name":10,"category_name":31,"show_sort_weight":32,"slug":33},16,"Social Media",50,"social-media",{"id":35,"doc_module":9,"doc_module_name":10,"category_name":36,"show_sort_weight":37,"slug":38},17,"Forms",40,"forms",{"id":40,"doc_module":9,"doc_module_name":10,"category_name":41,"show_sort_weight":42,"slug":43},18,"Letters",30,"letters",{"id":45,"doc_module":9,"doc_module_name":10,"category_name":46,"show_sort_weight":47,"slug":48},21,"Paper Templates",5,"papers-templates",{"id":50,"doc_module":9,"doc_module_name":10,"category_name":51,"show_sort_weight":4,"slug":52},158,"General","general-158",{"code":4,"msg":54,"data":55},"ok",{"site_id":56,"language":57,"slug":58,"title":59,"keywords":60,"description":61,"schema_data":62,"social_meta":119,"head_meta":121,"extra_data":123,"updated_unix":125},105,"en","bim-project-execution-plan-guide-an-introduction-for-those-new-to-bim-version-100-november-2020-public-comment-draft","BIM Project Execution Plan Guide - An Introduction For Those New to BIM - Version 1.00 - November 2020 Public Comment Draft","","BIM Project Execution Plan Guide introduces BIM project Execution Plan concepts for teams on small to midsized projects, including members with no prior BIM experience. The guide positions BxP as an educational, informational resource and describes planning components and implementation approach. It outlines stakeholders, assumptions, background, and why BxP content matters in project delivery strategy, alongside BIM uses, goals, and expected benefits. Copyright and licensing terms are provided for educational use.",{"@graph":63,"@context":118},[64,80,101],{"@type":65,"itemListElement":66},"BreadcrumbList",[67,71,74,77],{"item":68,"name":69,"@type":70,"position":9},"https://docshare.wps.com","Home","ListItem",{"item":72,"name":10,"@type":70,"position":73},"https://docshare.wps.com/template/",2,{"item":75,"name":11,"@type":70,"position":76},"https://docshare.wps.com/template/presentations/",3,{"item":78,"name":59,"@type":70,"position":79},"https://docshare.wps.com/template/bim-project-execution-plan-guide-an-introduction-for-those-new-to-bim-version-100-november-2020-public-comment-draft/244619/",4,{"url":78,"name":59,"@type":81,"image":82,"author":87,"headline":59,"publisher":90,"fileFormat":93,"inLanguage":57,"description":61,"dateModified":94,"datePublished":95,"encodingFormat":93,"isAccessibleForFree":96,"interactionStatistic":97},"DigitalDocument",{"url":83,"@type":84,"width":85,"height":86},"https://docshare.wps.com/thumbnails/bim-project-execution-plan-guide-an-introduction-for-those-new-to-bim-version-100-november-2020-public-comment-draft/244619.png","ImageObject",442,249,{"name":88,"@type":89},"Seraphina","Person",{"url":68,"name":91,"@type":92},"DocShare","Organization","application/pdf","2026-10-21","2026-09-12",true,{"@type":98,"interactionType":99,"userInteractionCount":8},"InteractionCounter",{"@type":100},"ViewAction",{"@type":102,"mainEntity":103},"FAQPage",[104,110,114],{"name":105,"@type":106,"acceptedAnswer":107},"What is the purpose of the BIM Project Execution Plan Guide?","Question",{"text":108,"@type":109},"It introduces BIM project Execution Plan (BxP) concepts to teams on small to midsized projects, including people new to BIM.","Answer",{"name":111,"@type":106,"acceptedAnswer":112},"Who is the guide intended for?",{"text":113,"@type":109},"It is addressed to project teams and stakeholders, especially those who may have team members with no previous BIM experience.",{"name":115,"@type":106,"acceptedAnswer":116},"Why does having a BxP matter in a project delivery strategy?",{"text":117,"@type":109},"The guide explains that BxP content is important for achieving project goals and delivering BIM requirements effectively across stakeholders.","https://schema.org",{"og:url":78,"og:type":120,"og:title":59,"og:site_name":91,"og:description":61},"article",{"robots":122,"canonical":78},"index,follow",{"doc_id":124,"site_id":56},244619,1791428068,{"code":4,"msg":5,"data":127},{"doc_id":124,"user_id":128,"nickname":88,"user_avatar":129,"doc_module":9,"category_id":8,"category_name":11,"doc_title":59,"doc_description":61,"doc_content":130,"file_id":131,"file_url":132,"file_type":133,"file_size":134,"view_count":8,"is_deleted":4,"is_public":9,"is_downloadable":9,"audit_status":9,"page_count":135,"language":136,"language_code":57,"site_id":56,"html_lang":57,"table_of_contents":137,"faqs":138,"seo_title":139,"seo_description":61,"update_tm":140,"read_time":141},962075114101,"https://ap-avatar.wpscdn.com/avatar/e000253a75eb197efd?x-image-process=image/resize,m_fixed,w_180,h_180&k=1780044092746381165","20  \nBIM Project Execution Plan Guide  \nAn Introduction For Those New to BIM  \nWill Ikerd, P.E., CM-BIM, Principal Investigator  \nVersion 1.00 | November 2020 Public Comment Draft  \nThe purpose of this guide is to introduce BIM project Execution Plan concepts to teams on small to midsized projects that may have some team members who have never previously used BIM.  \nCopyright © 2020 BIMForum  \nCopyright  \nThe Building Information Modeling (BIM) Execution Planning Guide (BxP) 2020 is copyrighted by BIMForum and is a permitted derivative of a previous version.  \nThird Party Work has been included with permission and noted where appropriate by Ascend Building Knowledge Foundation and other groups. The original 2019 BxP Guide has been funded by The Pankow Foundation and other cited contributors. The previous versions are developed, published, and distributed under the Creative Commons Attribution-ShareAlike 4.0 International (CC BY-SA 4.0) jointly by:  \n\n| The BIMForum\u003Cbr>[Web: BIMforum.org/bxp](Web: BIMforum.org/bxp) | Charles Pankow Foundation\u003Cbr>1390 Chain Bridge Road, Suite 700\u003Cbr>McLean, Virginia 22101-3904\u003Cbr>e-mail inquiries: [info@pankowfoundation.org](info@pankowfoundation.org) |\n| --- | --- |\n\nNothing contained in this work shall be considered the rendering of legal advice. Readers are responsible for obtaining such advice from their own legal counsel. This work and any forms herein are intended solely for educational and informational purposes.  \nAll images are intended to illustrate building conditions in compliance with common building codes. However, the images do not take into account site specific conditions, regional building codes and other important information that may require a material change for specific projects. These illustrations do not make representation for fitness for a particular project nor for code or design compliance.  \nThis document is developed, published, and distributed under the Creative Commons AttributionShareAlike 4.0 International (CC BY-SA 4.0) by: BIMForum, Copyright © 2020. All rights reserved.  \nPublished in the United States of America  \nTable of Contents  \nCopyright ............................................................................................................................ 1  \nTable of Contents ............................................................................................................... 2  \nSponsors ............................................................................................................................. 4  \nExecutive Summary ........................................................................................................... 5  \nBIMForum BxP Taskforce ................................................................................................. 6  \nReview Board ..................................................................................................................... 9  \nTechnical Writers ............................................................................................................... 9  \nSponsors ........................................................................................................................... 10  \nIntroduction ...................................................................................................................... 11  \nWho this Document is Addressed To ........................................................................... 12  \nAssumptions of the Document ..................................................................................... 14  \nBackground on the Creation of The Guide................................................................... 15  \nFormat and Approach ................................................................................................... 16  \nStakeholders in the Process .......................................................................................... 17  \nWho Should Develop the BxP? ..........................","cbCaigbIkl8r7vMQ","https://ap.wps.com/l/cbCaigbIkl8r7vMQ","pdf",9524012,103,"English","# Sponsors\n## Executive Summary\n# BIMForum BxP Taskforce\n## Review Board\n# Introduction\n## Who this Document is Addressed To\n## Assumptions of the Document\n## Background on the Creation of The Guide\n## Format and Approach\n## Stakeholders in the Process\n## Who Should Develop the BxP?\n## Why BxP Content Matters\n## BxP Goals\n## Why Is Having A BxP In Your Project Delivery Strategy Important?\n## Lean Process and the BxP\n## BIM Uses\n## Project Needs\n## Benefits of a BxP to Stakeholders\n## BxP Components and Implementation\n### Introduction Section of BxP Content\n### Project Information Section\n### Milestone Section\n### Key Project Contacts Section\n### Project Coordinates, Origin & Levels","[{\"question\":\"What is the purpose of the BIM Project Execution Plan Guide?\",\"answer\":\"It introduces BIM project Execution Plan (BxP) concepts to teams on small to midsized projects, including people new to BIM.\"},{\"question\":\"Who is the guide intended for?\",\"answer\":\"It is addressed to project teams and stakeholders, especially those who may have team members with no previous BIM experience.\"},{\"question\":\"Why does having a BxP matter in a project delivery strategy?\",\"answer\":\"The guide explains that BxP content is important for achieving project goals and delivering BIM requirements effectively across stakeholders.\"}]","BIM Project Execution Plan Guide - An Introduction For Those New to BIM - Version 1.00 - November 2020 Public Comment Draft | PDF",1789219873,36]