[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-282959-105":3,"doc-detail-282959-en":81,"detail-sidebar-cat-1-en-105":96},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":74,"head_meta":76,"extra_data":78,"updated_unix":80},105,"en","better-energy-homes-installation-terms","Better Energy Homes - Installation Terms","","Installation Terms define the contractual conditions for a registered contractor to install qualifying home energy efficiency measures under the Better Energy Homes scheme. The document sets out the contractor’s obligations on scheduling, workmanship, use of qualified personnel, appropriateness of measures, site condition after works, scheme declarations, insurance, and restrictions on assignment or subcontracting. It also specifies the grantee’s duties for safe access and utilities, payment terms and timing, warranty and remedy process, warranty pass-through, indemnities, liability allocation, and termination rights.",{"@graph":14,"@context":73},[15,34,56],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/template/","Template",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/template/forms/","Forms",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/template/better-energy-homes-installation-terms/282959/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/better-energy-homes-installation-terms/282959.png","ImageObject",442,249,{"name":42,"@type":43},"Ava Thompson","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-10-23","2026-09-16",true,{"@type":52,"interactionType":53,"userInteractionCount":55},"InteractionCounter",{"@type":54},"ViewAction",10,{"@type":57,"mainEntity":58},"FAQPage",[59,65,69],{"name":60,"@type":61,"acceptedAnswer":62},"What are the contractor’s main installation obligations under the Terms?","Question",{"text":63,"@type":64},"The contractor must begin and complete the measure within agreed dates, install with due skill and care in line with legal and manufacturer requirements, use appropriately qualified personnel, choose measures suitable to the grantee’s needs, return the home to its prior condition, provide a signed “Declaration of Works,” maintain required insurance, and obtain consent before assignment or subcontracting.","Answer",{"name":66,"@type":61,"acceptedAnswer":67},"How does payment work for the grantee?",{"text":68,"@type":64},"The grantee pays the contractor in full (including VAT) for the fee and any agreed ancillary works. If payment is made in instalments, the schedule must align with scheme qualification requirements—works must be completed and full payment made or an agreed payment schedule in place no later than six months after grant approval.",{"name":70,"@type":61,"acceptedAnswer":71},"What happens if the contractor’s warranty is breached?",{"text":72,"@type":64},"If the measure or installation fails to meet required specifications within two years, the grantee may request repair or replacement at the contractor’s cost within fourteen days of notice. If not remedied in that period, the grantee may purchase replacement measures or organize remedial work, and the contractor refunds monies paid for replacement measures and services.","https://schema.org",{"og:url":32,"og:type":75,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":77,"canonical":32},"index,follow",{"doc_id":79,"site_id":7},282959,1789586018,{"code":4,"msg":82,"data":83},"success",{"doc_id":79,"user_id":84,"nickname":42,"user_avatar":85,"doc_module":22,"category_id":86,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":87,"file_id":88,"file_url":89,"file_type":90,"file_size":91,"view_count":55,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":26,"language":92,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":93,"faqs":94,"seo_title":95,"seo_description":12,"update_tm":80,"read_time":22},1649267921044,"https://us-avatar.wpscdn.com/avatar/1800007509477c92dfb?_k=1786009248482753345",17,"# Better Energy Homes scheme-Installation Terms\n\nThese Installation Terms(“\"Terms”)set out the terms under which a registered contractor (the\"Contractor')for the purposes of the Better Energy Homes scheme(the \"Scheme\")will install certainhome energy efficiency measures(\"Measure”)in the home of an individual(\"Grantee\")who hassuccessfully applied for a grant under the Scheme.By signing below,the Grantee and the Contractoragree to be bound by these Terms.  \n1.The Contractor shall:  \n# (a)begin installation of the Measure on        [insert date here]and ensure that suchinstallation is completed by_        [insert date here].These dates may only be variedby agreement of the parties;\n\n(b)install the Measure with all due skill,care and diligence,and in accordance with theseTerms and relevant law and regulation,including,without limitation,health and safety lawand regulation and in accordance with any applicable manufacturer's guidelines andinstructions;  \n(c)only use appropriately qualified,experienced,skilled and trained personnel,and who arealso either registered with SEAl as a registered contractor or as nominated personnel,insupervising and signing off on the satisfactory completion of the Measure;  \n(d)only installsuch Measure as is appropriate having regard to the Grantee's requirements andthe optimal energy efficiency of the Grantee's home;  \n(e)ensure that,after installation of the Measure has completed,the Grantee's home is in thesame state of repair,condition and cleanliness as it was before installation began;  \n(f)provide the Grantee with a signed and legible Scheme \"Declaration of Works\"oncompletion of the installation;  \n(g)maintain such adequate insurances as required under the terms of registration under theScheme to cover all loss or damage that may arise either in relation to installation of theMeasure or in connection with these Terms;  \n(h)not assign these Terms or subcontract installation of the Measure without the Grantee'sconsent.  \n2.The Grantee shall provide safe access to his /her home as is necessary to allow the Contractorinstall the Measure and will also provide all relevant electricity and other utilities necessary tofacilitate such installation.  \n3.Unless otherwise agreed between the parties,the Grantee shall pay in fullthe Contractore      (including VAT)for and on the provision and installation of the Measure(“Fee”)andany specified ancillary works which have been agreed between the parties.Where the Fee is tobe paid in instalments,it shall be paid as follows:  \n\n| Instalment(€,excl.VAT)   | Milestone date*   |\n| --- | --- |\n|  |  |\n|  |  |\n|  |  |\n\n*Note that for grant qualification /payment purposes under the Better Energy Homes scheme,all  \nworks must be completed and full payment made or an agreed payment schedule is in place,no morethan six(6)months after date of grant approval.  \n4.The Contractor warrants and represents to the Grantee and agrees that the Measure and itsinstallation corresponds in all respects with any appropriate technical documentation orspecifications(including the Scheme Standards and Guidelines Document available on the SEAIwebsite and any other prescribed specifications and standards guidance from SEAl pertainingto the Better Energy Homes scheme),is of merchantable quality,fit to effectively improve theenergy efficiency of the Grantee's home,free from defects and compliant with all relevantstatutory requirements and regulations relating to such Measure (the \"Contractor's Warranty\").In the event of a breach of the Contractor's Warranty or paragraphs 1(b)-(d)above within a  \nperiod of two (2)years from completion of installation of the Measure,then the Contractorshall,at the discretion of the Grantee but at the Contractor's cost and expense,repair or replacethe Measure or remedy its installation within a period of fourteen days from being notified bythe Grantee of the breach.If the Contractor does not repair or replace the Measure or remedyits installation within this fourtee","cbCaiaZ0cRv7xS9P","https://ap.wps.com/l/cbCaiaZ0cRv7xS9P","pdf",642011,"English","# Installation Terms\n## Parties’ Core Obligations\n## Payments, Warranty and Remedies\n## Indemnity, Liability Allocation and Termination","[{\"question\":\"What are the contractor’s main installation obligations under the Terms?\",\"answer\":\"The contractor must begin and complete the measure within agreed dates, install with due skill and care in line with legal and manufacturer requirements, use appropriately qualified personnel, choose measures suitable to the grantee’s needs, return the home to its prior condition, provide a signed “Declaration of Works,” maintain required insurance, and obtain consent before assignment or subcontracting.\"},{\"question\":\"How does payment work for the grantee?\",\"answer\":\"The grantee pays the contractor in full (including VAT) for the fee and any agreed ancillary works. If payment is made in instalments, the schedule must align with scheme qualification requirements—works must be completed and full payment made or an agreed payment schedule in place no later than six months after grant approval.\"},{\"question\":\"What happens if the contractor’s warranty is breached?\",\"answer\":\"If the measure or installation fails to meet required specifications within two years, the grantee may request repair or replacement at the contractor’s cost within fourteen days of notice. If not remedied in that period, the grantee may purchase replacement measures or organize remedial work, and the contractor refunds monies paid for replacement measures and services.\"}]","Better Energy Homes - Installation Terms | PDF",{"code":4,"msg":82,"data":97},[98,103,108,113,118,123,126,131,136],{"id":99,"doc_module":22,"doc_module_name":25,"category_name":100,"show_sort_weight":101,"slug":102},11,"Presentations",90,"presentations",{"id":104,"doc_module":22,"doc_module_name":25,"category_name":105,"show_sort_weight":106,"slug":107},12,"Resumes",80,"resumes",{"id":109,"doc_module":22,"doc_module_name":25,"category_name":110,"show_sort_weight":111,"slug":112},14,"Invoices",70,"invoices",{"id":114,"doc_module":22,"doc_module_name":25,"category_name":115,"show_sort_weight":116,"slug":117},15,"Posters",60,"posters",{"id":119,"doc_module":22,"doc_module_name":25,"category_name":120,"show_sort_weight":121,"slug":122},16,"Social Media",50,"social-media",{"id":86,"doc_module":22,"doc_module_name":25,"category_name":29,"show_sort_weight":124,"slug":125},40,"forms",{"id":127,"doc_module":22,"doc_module_name":25,"category_name":128,"show_sort_weight":129,"slug":130},18,"Letters",30,"letters",{"id":132,"doc_module":22,"doc_module_name":25,"category_name":133,"show_sort_weight":134,"slug":135},21,"Paper Templates",5,"papers-templates",{"id":137,"doc_module":22,"doc_module_name":25,"category_name":138,"show_sort_weight":4,"slug":139},158,"General","general-158"]