[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-1-en-105":3,"doc-seo-175950-105":53,"doc-detail-175950-en":126},{"code":4,"msg":5,"data":6},0,"success",[7,14,19,24,29,34,39,44,49],{"id":8,"doc_module":9,"doc_module_name":10,"category_name":11,"show_sort_weight":12,"slug":13},11,1,"Template","Presentations",90,"presentations",{"id":15,"doc_module":9,"doc_module_name":10,"category_name":16,"show_sort_weight":17,"slug":18},12,"Resumes",80,"resumes",{"id":20,"doc_module":9,"doc_module_name":10,"category_name":21,"show_sort_weight":22,"slug":23},14,"Invoices",70,"invoices",{"id":25,"doc_module":9,"doc_module_name":10,"category_name":26,"show_sort_weight":27,"slug":28},15,"Posters",60,"posters",{"id":30,"doc_module":9,"doc_module_name":10,"category_name":31,"show_sort_weight":32,"slug":33},16,"Social Media",50,"social-media",{"id":35,"doc_module":9,"doc_module_name":10,"category_name":36,"show_sort_weight":37,"slug":38},17,"Forms",40,"forms",{"id":40,"doc_module":9,"doc_module_name":10,"category_name":41,"show_sort_weight":42,"slug":43},18,"Letters",30,"letters",{"id":45,"doc_module":9,"doc_module_name":10,"category_name":46,"show_sort_weight":47,"slug":48},21,"Paper Templates",5,"papers-templates",{"id":50,"doc_module":9,"doc_module_name":10,"category_name":51,"show_sort_weight":4,"slug":52},158,"General","general-158",{"code":4,"msg":54,"data":55},"ok",{"site_id":56,"language":57,"slug":58,"title":59,"keywords":60,"description":61,"schema_data":62,"social_meta":119,"head_meta":121,"extra_data":123,"updated_unix":125},105,"en","baseline-change-control-plan-version-10-template","Baseline Change Control Plan - Version 1.0 - Template","","Baseline change control plan (BCCP) template for governing project changes from inception through delivery. Defines purpose and intended audience, explains an orderly change control process for tracking submission, coordination, review, evaluation, categorization, and baseline release approval. Includes placeholders for change control thresholds, specifies change request process flow requirements, and lists required data elements for the change request form and change management log. Provides guidance for evaluating and authorizing change requests based on priority and type, plus supporting appendices.",{"@graph":63,"@context":118},[64,80,101],{"@type":65,"itemListElement":66},"BreadcrumbList",[67,71,74,77],{"item":68,"name":69,"@type":70,"position":9},"https://docshare.wps.com","Home","ListItem",{"item":72,"name":10,"@type":70,"position":73},"https://docshare.wps.com/template/",2,{"item":75,"name":11,"@type":70,"position":76},"https://docshare.wps.com/template/presentations/",3,{"item":78,"name":59,"@type":70,"position":79},"https://docshare.wps.com/template/baseline-change-control-plan-version-10-template/175950/",4,{"url":78,"name":59,"@type":81,"image":82,"author":87,"headline":59,"publisher":90,"fileFormat":93,"inLanguage":57,"description":61,"dateModified":94,"datePublished":95,"encodingFormat":93,"isAccessibleForFree":96,"interactionStatistic":97},"DigitalDocument",{"url":83,"@type":84,"width":85,"height":86},"https://docshare.wps.com/thumbnails/baseline-change-control-plan-version-10-template/175950.png","ImageObject",442,249,{"name":88,"@type":89},"Skyler","Person",{"url":68,"name":91,"@type":92},"DocShare","Organization","application/vnd.openxmlformats-officedocument.wordprocessingml.document","2026-10-24","2026-09-02",true,{"@type":98,"interactionType":99,"userInteractionCount":30},"InteractionCounter",{"@type":100},"ViewAction",{"@type":102,"mainEntity":103},"FAQPage",[104,110,114],{"name":105,"@type":106,"acceptedAnswer":107},"What is the purpose of the Baseline Change Control Plan (BCCP)?","Question",{"text":108,"@type":109},"The BCCP documents and tracks the information needed to manage project change effectively from project inception to delivery.","Answer",{"name":111,"@type":106,"acceptedAnswer":112},"Who is the intended audience for this BCCP template?",{"text":113,"@type":109},"The plan is intended for the project manager, project team, project sponsor, and any senior leaders whose support is needed to carry out the plan.",{"name":115,"@type":106,"acceptedAnswer":116},"How does the change control process support managing project baselines?",{"text":117,"@type":109},"It provides an orderly procedure for tracking submission, coordination, review, evaluation, categorization, and approval for release of changes to the project’s baselines.","https://schema.org",{"og:url":78,"og:type":120,"og:title":59,"og:site_name":91,"og:description":61},"article",{"robots":122,"canonical":78},"index,follow",{"doc_id":124,"site_id":56},175950,1791164572,{"code":4,"msg":5,"data":127},{"doc_id":124,"user_id":128,"nickname":88,"user_avatar":129,"doc_module":9,"category_id":8,"category_name":11,"doc_title":59,"doc_description":61,"doc_content":130,"file_id":131,"file_url":132,"file_type":133,"file_size":134,"view_count":30,"is_deleted":4,"is_public":9,"is_downloadable":9,"audit_status":9,"page_count":15,"language":135,"language_code":57,"site_id":56,"html_lang":57,"table_of_contents":136,"faqs":137,"seo_title":138,"seo_description":61,"update_tm":139,"read_time":79},2336464648746,"https://ap-avatar.wpscdn.com/davatar_276721f389ce27ea32af1340a28f341c","\u0013 SUBJECT  \\* MERGEFORMAT \u0014\u003CProject Name>\u0015\nBaseline change control plan\nVersion \u003C1.0>\n\u003Cmm/dd/yyyy>\nVERSION HISTORY\n[Provide information on how the development and distribution of the BASELINE CHANGE CONTROL PLAN (BCCP), up to the final point of approval, was controlled and tracked.  Use the table below to provide the version number, the author implementing the version, the date of the version, the name of the person approving the version, the date that particular version was approved, and a brief description of the reason for creating the revised version.]\nTemplate Version: 01/10/2023\n\u000fNote to the Author\n[This document is a template of a BCCP document for a project. The template includes instructions to the author, boilerplate text, and fields that should be replaced with the values specific to the project.\nBlue italicized text enclosed in square brackets ([text]) provides instructions to the document author, or describes the intent, assumptions and context for content included in this document.\nBlue italicized text enclosed in angle brackets (\u003Ctext>) indicates a field that should be replaced with information specific to a particular project.\nText and tables in black are provided as boilerplate examples of wording and formats that may be used or modified as appropriate to a specific project.  These are offered only as suggestions to assist in developing project documents; they are not mandatory formats.\nWhen using this template for your project document, it is recommended that you follow these steps:\nReplace all text enclosed in angle brackets (i.e., \u003CProject Name>) with the correct field values. These angle brackets appear in both the body of the document and in headers and footers.  To customize fields in Microsoft Word (which display a gray background when selected):\nSelect File>Properties>Summary and fill in the Title field with the Document Name and the Subject field with the Project Name.\nSelect File>Properties>Custom and fill in the Last Modified, Status, and Version fields with the appropriate information for this document.\nAfter you click OK to close the dialog box, update the fields throughout the document with these values by selecting Edit>Select All (or Ctrl-A) and pressing F9.  Or you can update an individual field by clicking on it and pressing F9. This must be done separately for Headers and Footers.\nModify boilerplate text as appropriate to the specific project.\nTo add any new sections to the document, ensure that the appropriate header and body text styles are maintained.  Styles used for the Section Headings are Heading 1, Heading 2 and Heading 3.  Style used for boilerplate text is Body Text.\nTo update the Table of Contents, right-click and select “Update field” and choose the option- “Update entire table”\nBefore submission of the first draft of this document, delete this “Notes to the Author” page and all instructions to the author, which appear throughout the document as blue italicized text enclosed in square brackets.]\n\u000fTABLE OF CONTENTS\n\u0013 TOC \\o \"2-3\" \\h \\z \\t \"Heading 1,1,PageTitle,5,Appendix,4\" \u0014\u0013 HYPERLINK \\l \"_Toc133654187\" \u00141\tIntroduction\t\u0013 PAGEREF _Toc133654187 \\h \u00145\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc133654188\" \u00141.1\tPurpose of The Change Management Plan\t\u0013 PAGEREF _Toc133654188 \\h \u00145\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc133654189\" \u00142\tChange management Process\t\u0013 PAGEREF _Toc133654189 \\h \u00145\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc133654190\" \u00142.1\tChange Request Process Flow Requirements\t\u0013 PAGEREF _Toc133654190 \\h \u00145\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc133654191\" \u00142.2\tChange Request Form and Change Management Log\t\u0013 PAGEREF _Toc133654191 \\h \u00146\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc133654192\" \u00142.3\tEvaluating and Authorizing Change Requests\t\u0013 PAGEREF _Toc133654192 \\h \u00146\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc133654193\" \u00142.3.1\tChange Control Board\t\u0013 PAGEREF _Toc133654193 \\h \u00147\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc133654194\" \u00143\tResponsibilities\t\u0013 PAGEREF _Toc133654194 \\h \u00147\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc133654195\" \u0014Appendix A: Change Management Plan Approval\t\u0013 PAGEREF _Toc133654195 \\h \u00148\u0015\u0015\n\u0013 HYPERLINK \\l \"_Toc133654196","cbCaitb0HglUasok","https://ap.wps.com/l/cbCaitb0HglUasok","docx",121042,"English","# Introduction\n## Purpose of The Change Management Plan\n## Change management Process\n### Change Request Process Flow Requirements\n### Change Request Form and Change Management Log\n### Evaluating and Authorizing Change Requests\n#### Change Control Board\n## Responsibilities\n## Appendix A: Change Management Plan Approval\n## Appendix B: References\n## Appendix C: Key Terms\n## Appendix D: Change Request Form Example\n## Appendix E: Change Management Log Template","[{\"question\":\"What is the purpose of the Baseline Change Control Plan (BCCP)?\",\"answer\":\"The BCCP documents and tracks the information needed to manage project change effectively from project inception to delivery.\"},{\"question\":\"Who is the intended audience for this BCCP template?\",\"answer\":\"The plan is intended for the project manager, project team, project sponsor, and any senior leaders whose support is needed to carry out the plan.\"},{\"question\":\"How does the change control process support managing project baselines?\",\"answer\":\"It provides an orderly procedure for tracking submission, coordination, review, evaluation, categorization, and approval for release of changes to the project’s baselines.\"}]","Baseline Change Control Plan - Version 1.0 - Template | DOCX",1788322378]