[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-1-en-105":3,"doc-seo-307599-105":53,"doc-detail-307599-en":127},{"code":4,"msg":5,"data":6},0,"success",[7,14,19,24,29,34,39,44,49],{"id":8,"doc_module":9,"doc_module_name":10,"category_name":11,"show_sort_weight":12,"slug":13},11,1,"Template","Presentations",90,"presentations",{"id":15,"doc_module":9,"doc_module_name":10,"category_name":16,"show_sort_weight":17,"slug":18},12,"Resumes",80,"resumes",{"id":20,"doc_module":9,"doc_module_name":10,"category_name":21,"show_sort_weight":22,"slug":23},14,"Invoices",70,"invoices",{"id":25,"doc_module":9,"doc_module_name":10,"category_name":26,"show_sort_weight":27,"slug":28},15,"Posters",60,"posters",{"id":30,"doc_module":9,"doc_module_name":10,"category_name":31,"show_sort_weight":32,"slug":33},16,"Social Media",50,"social-media",{"id":35,"doc_module":9,"doc_module_name":10,"category_name":36,"show_sort_weight":37,"slug":38},17,"Forms",40,"forms",{"id":40,"doc_module":9,"doc_module_name":10,"category_name":41,"show_sort_weight":42,"slug":43},18,"Letters",30,"letters",{"id":45,"doc_module":9,"doc_module_name":10,"category_name":46,"show_sort_weight":47,"slug":48},21,"Paper Templates",5,"papers-templates",{"id":50,"doc_module":9,"doc_module_name":10,"category_name":51,"show_sort_weight":4,"slug":52},158,"General","general-158",{"code":4,"msg":54,"data":55},"ok",{"site_id":56,"language":57,"slug":58,"title":59,"keywords":60,"description":61,"schema_data":62,"social_meta":120,"head_meta":122,"extra_data":124,"updated_unix":126},105,"en","arlington-county-request-for-information-form-traffic-signal-construction-and-maintenance","Arlington County - Request for Information Form - Traffic Signal Construction and Maintenance","","This document provides a formal Request for Information (RFI) template specifically designed for the Arlington County Traffic Signal Construction and Maintenance contract. It enables contractors to systematically document project issues, propose solutions, and seek clarifications from project officers or consultants. The template includes structured fields for project details, RFI numbering, detailed explanations of issues, potential sketches or photo references, and recommended solutions. It also incorporates a formal routing section for architects and engineers to provide responses, classify the request as a potential contract change or simple clarification, and indicate if additional information or coordination is required for processing. This standardized approach ensures clear communication and documentation across all project stakeholders, maintaining adherence to contract specifications and timelines.",{"@graph":63,"@context":119},[64,80,102],{"@type":65,"itemListElement":66},"BreadcrumbList",[67,71,74,77],{"item":68,"name":69,"@type":70,"position":9},"https://docshare.wps.com","Home","ListItem",{"item":72,"name":10,"@type":70,"position":73},"https://docshare.wps.com/template/",2,{"item":75,"name":36,"@type":70,"position":76},"https://docshare.wps.com/template/forms/",3,{"item":78,"name":59,"@type":70,"position":79},"https://docshare.wps.com/template/arlington-county-request-for-information-form-traffic-signal-construction-and-maintenance/307599/",4,{"url":78,"name":59,"@type":81,"image":82,"author":87,"headline":59,"publisher":90,"fileFormat":93,"inLanguage":57,"description":61,"dateModified":94,"datePublished":95,"encodingFormat":93,"isAccessibleForFree":96,"interactionStatistic":97},"DigitalDocument",{"url":83,"@type":84,"width":85,"height":86},"https://docshare.wps.com/thumbnails/arlington-county-request-for-information-form-traffic-signal-construction-and-maintenance/307599.png","ImageObject",442,249,{"name":88,"@type":89},"Bintang","Person",{"url":68,"name":91,"@type":92},"DocShare","Organization","application/pdf","2026-10-23","2026-09-19",true,{"@type":98,"interactionType":99,"userInteractionCount":101},"InteractionCounter",{"@type":100},"ViewAction",9,{"@type":103,"mainEntity":104},"FAQPage",[105,111,115],{"name":106,"@type":107,"acceptedAnswer":108},"What is the purpose of this document?","Question",{"text":109,"@type":110},"This document is a formal template used by contractors to request information, seek clarification, or propose solutions for issues encountered during the On-call Traffic Signal Construction and Maintenance project in Arlington County.","Answer",{"name":112,"@type":107,"acceptedAnswer":113},"How can a contractor indicate the urgency of an RFI?",{"text":114,"@type":110},"The template includes a 'Response Priority' section where the contractor can select between 'Earliest Convenience' or 'Rush (Work in Progress)' to signify the urgency of the request.",{"name":116,"@type":107,"acceptedAnswer":117},"What actions can an Architect or Engineer take when responding to an RFI?",{"text":118,"@type":110},"They can classify the RFI as a formal contract change, confirm that the request is consistent with existing contract documents, or return the RFI without response if it is incomplete, lacks coordination drawings, or constitutes a substitution request.","https://schema.org",{"og:url":78,"og:type":121,"og:title":59,"og:site_name":91,"og:description":61},"article",{"robots":123,"canonical":78},"index,follow",{"doc_id":125,"site_id":56},307599,1791210274,{"code":4,"msg":5,"data":128},{"doc_id":125,"user_id":129,"nickname":88,"user_avatar":130,"doc_module":9,"category_id":35,"category_name":36,"doc_title":59,"doc_description":61,"doc_content":131,"file_id":132,"file_url":133,"file_type":134,"file_size":135,"view_count":101,"is_deleted":4,"is_public":9,"is_downloadable":9,"audit_status":9,"page_count":73,"language":136,"language_code":57,"site_id":56,"html_lang":57,"table_of_contents":137,"faqs":138,"seo_title":139,"seo_description":61,"update_tm":140,"read_time":9},962085564381,"https://ap-avatar.wpscdn.com/davatar_6f874abed73319feea01a86fa6f0fab8","ARLINGTON COUNTY, VA REQUEST FOR INFORMATION FORM  \nPROJECT: On-call – Traffic Signal Construction & Maintenance Contract  \nRFI NUMBER:  \nPROJECT NO.: On-call  \nFOR CONTRACTOR ROUTING:  \nContractor:   Transmittal No.:    \nWork Category: Date:  \nTO  (County Project Officer)  (Consultant)  \n (Other)  \n Action  \n Action  \n Action  \n Faxed to    Emailed  \n Faxed to    Emailed  \n Faxed to    Emailed  \n Mailed Pages  \n Mailed Pages Pages  \n___  \n___  \n___  \nREGARDING:   SPEC. SECTION:   DWG. NO.:    \nEXPLANATION OF ISSUE: (Provide complete description of request with sketches or photos if necessary, and present status of work)  \nRECOMMENDATION / SUGGESTED SOLUTION:  \nRESPONSE PRIORITY:  EARLIEST CONVENIENCE  RUSH (WORK IN PROGRESS)  \nREASON FOR REQUEST:  Existing Condition  Non-conformance  Clarification / Interpretation  Agency Generated  Other  \nCONTRACTOR  \n:    \nBY:   DATE:   Dist:    \nARCHITECT'S/ENGINEER'S ROUTING: (for A/E use only)  \nTo:   Date:   Return to:   Date    \nTO:  (contractor)   Faxed to ____________  Emailed  Mailed  Hand delivered  \nRESPONSE:  \n The above is considered a change. The following document will be used for processing:    \n The above is consistent with the intent of and reasonably inferable from Contract Documents, or makes minor changes in the Work without change in Contract Sum or Contract Time. If Contractor does not agree, submit written notice within twenty (20) days substantiating claim in accordance with Contract Documents for approval.  \n This RFI is returned without response for the following reason:  Incomplete or lack of detailed information.  Related to \"means & methods\" .  \n Lack of adequate Coordination Drawings.  Is a \"Substitution Request\" .  \n Response required by others.  \nFROM:  \n   DATE:   Dist:     File","cbCaickecYDBEAFC","https://ap.wps.com/l/cbCaickecYDBEAFC","pdf",108670,"English","# RFI Header Information\n## Routing Details\n# Issue Description and Recommendation\n## RFI Classification and Priority\n# Architect and Engineer Response Section\n## Response Determination and Processing","[{\"question\":\"What is the purpose of this document?\",\"answer\":\"This document is a formal template used by contractors to request information, seek clarification, or propose solutions for issues encountered during the On-call Traffic Signal Construction and Maintenance project in Arlington County.\"},{\"question\":\"How can a contractor indicate the urgency of an RFI?\",\"answer\":\"The template includes a 'Response Priority' section where the contractor can select between 'Earliest Convenience' or 'Rush (Work in Progress)' to signify the urgency of the request.\"},{\"question\":\"What actions can an Architect or Engineer take when responding to an RFI?\",\"answer\":\"They can classify the RFI as a formal contract change, confirm that the request is consistent with existing contract documents, or return the RFI without response if it is incomplete, lacks coordination drawings, or constitutes a substitution request.\"}]","Arlington County - Request for Information Form - Traffic Signal Construction and Maintenance | PDF",1789851503]