[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-1-en-105":3,"doc-seo-241834-105":53,"doc-detail-241834-en":126},{"code":4,"msg":5,"data":6},0,"success",[7,14,19,24,29,34,39,44,49],{"id":8,"doc_module":9,"doc_module_name":10,"category_name":11,"show_sort_weight":12,"slug":13},11,1,"Template","Presentations",90,"presentations",{"id":15,"doc_module":9,"doc_module_name":10,"category_name":16,"show_sort_weight":17,"slug":18},12,"Resumes",80,"resumes",{"id":20,"doc_module":9,"doc_module_name":10,"category_name":21,"show_sort_weight":22,"slug":23},14,"Invoices",70,"invoices",{"id":25,"doc_module":9,"doc_module_name":10,"category_name":26,"show_sort_weight":27,"slug":28},15,"Posters",60,"posters",{"id":30,"doc_module":9,"doc_module_name":10,"category_name":31,"show_sort_weight":32,"slug":33},16,"Social Media",50,"social-media",{"id":35,"doc_module":9,"doc_module_name":10,"category_name":36,"show_sort_weight":37,"slug":38},17,"Forms",40,"forms",{"id":40,"doc_module":9,"doc_module_name":10,"category_name":41,"show_sort_weight":42,"slug":43},18,"Letters",30,"letters",{"id":45,"doc_module":9,"doc_module_name":10,"category_name":46,"show_sort_weight":47,"slug":48},21,"Paper Templates",5,"papers-templates",{"id":50,"doc_module":9,"doc_module_name":10,"category_name":51,"show_sort_weight":4,"slug":52},158,"General","general-158",{"code":4,"msg":54,"data":55},"ok",{"site_id":56,"language":57,"slug":58,"title":59,"keywords":60,"description":61,"schema_data":62,"social_meta":119,"head_meta":121,"extra_data":123,"updated_unix":125},105,"en","arkansas-bead-program-preliminary-selectee-requirements-t2","Arkansas BEAD Program – Preliminary Selectee Requirements – T2","","This document outlines the preliminary selectee requirements for the Arkansas BEAD Program for Tranche 2, impacting projects progressing to the next stage of the grant application process, with a specific focus on the submission of essential documentation within a 30-day window following the \"Preliminary Selectee Notification Letter.\" Key submissions include a Commitment Letter from a qualified financial institution or a performance bond issuer, alongside a comprehensive Project Plan. The Project Plan itself is multifaceted, necessitating an Engineering Design Package (provided as an attachment), a Total Project Cost Document detailing expenditures across Engineering and Design, Labor, and Materials and Equipment, with a mandatory minimum 25 percent match, and a Project Implementation Plan that may include a Gantt chart to visually represent the build-out timeline and key milestones for project activities. Furthermore, a Capital Investment Schedule is required, presenting a high-level financial plan for network deployment, confirming that the entire build-out and service initiation will be completed within four years of the grant agreement's execution, maintaining a clear investment timeline to ensure adherence to the proposed Project Implementation Plan. These requirements are excerpted from the Arkansas BEAD Initial Proposal Volume II and the BEAD NOFO, Page 74. ARConnect may approve the combination of preliminary selections within the same Tranche into a larger grouping.",{"@graph":63,"@context":118},[64,80,101],{"@type":65,"itemListElement":66},"BreadcrumbList",[67,71,74,77],{"item":68,"name":69,"@type":70,"position":9},"https://docshare.wps.com","Home","ListItem",{"item":72,"name":10,"@type":70,"position":73},"https://docshare.wps.com/template/",2,{"item":75,"name":36,"@type":70,"position":76},"https://docshare.wps.com/template/forms/",3,{"item":78,"name":59,"@type":70,"position":79},"https://docshare.wps.com/template/arkansas-bead-program-preliminary-selectee-requirements-t2/241834/",4,{"url":78,"name":59,"@type":81,"image":82,"author":87,"headline":59,"publisher":90,"fileFormat":93,"inLanguage":57,"description":61,"dateModified":94,"datePublished":95,"encodingFormat":93,"isAccessibleForFree":96,"interactionStatistic":97},"DigitalDocument",{"url":83,"@type":84,"width":85,"height":86},"https://docshare.wps.com/thumbnails/arkansas-bead-program-preliminary-selectee-requirements-t2/241834.png","ImageObject",442,249,{"name":88,"@type":89},"Stanley","Person",{"url":68,"name":91,"@type":92},"DocShare","Organization","application/pdf","2026-09-29","2026-09-12",true,{"@type":98,"interactionType":99,"userInteractionCount":73},"InteractionCounter",{"@type":100},"ViewAction",{"@type":102,"mainEntity":103},"FAQPage",[104,110,114],{"name":105,"@type":106,"acceptedAnswer":107},"What documentation is required from preliminary selectees for the Arkansas BEAD Program?","Question",{"text":108,"@type":109},"Preliminary selectees must provide a Commitment Letter from a qualified financial institution or performance bond issuer, and a comprehensive Project Plan. The Project Plan includes an Engineering Design Package, Total Project Cost Document, Project Implementation Plan, and Capital Investment Schedule.","Answer",{"name":111,"@type":106,"acceptedAnswer":112},"What is the deadline for submitting the preliminary selectee requirements?",{"text":113,"@type":109},"All required items must be submitted within 30 days of receiving the “Preliminary Selectee Notification Letter.”",{"name":115,"@type":106,"acceptedAnswer":116},"What are the key components of the Project Plan for the Arkansas BEAD Program?",{"text":117,"@type":109},"The Project Plan comprises four main components: the Engineering Design Package, the Total Project Cost Document (including a minimum 25 percent match), the Project Implementation Plan (detailing build-out timeline and milestones), and the Capital Investment Schedule (outlining fund allocation for network deployment over four years).","https://schema.org",{"og:url":78,"og:type":120,"og:title":59,"og:site_name":91,"og:description":61},"article",{"robots":122,"canonical":78},"index,follow",{"doc_id":124,"site_id":56},241834,1790718657,{"code":4,"msg":5,"data":127},{"doc_id":124,"user_id":128,"nickname":88,"user_avatar":129,"doc_module":9,"category_id":35,"category_name":36,"doc_title":59,"doc_description":61,"doc_content":130,"file_id":131,"file_url":132,"file_type":133,"file_size":134,"view_count":47,"is_deleted":4,"is_public":9,"is_downloadable":9,"audit_status":9,"page_count":9,"language":135,"language_code":57,"site_id":56,"html_lang":57,"table_of_contents":136,"faqs":137,"seo_title":138,"seo_description":61,"update_tm":139,"read_time":4},2336477405376,"https://ap-avatar.wpscdn.com/davatar_29158cc5080c5b710cf443261637dec0","Arkansas BEAD Program – Preliminary Selectee Requirements  \nEach preliminary selectee must provide the following items within 30 days of receipt of the “Preliminary Selectee Notification Letter.” A single Commitment Letter is needed accounting for all preliminary selections within the Tranche; however, the components of the “Project Plan” must be provided per project1. Submission will take place online within the Arkansas Broadband Grantor Portal, and include the following:  \n1. A Commitment Letter from a qualified financial institution or performance bond issuer (template available, if needed) .  \n2. A Project Plan. The components of the Project Plan include:  \na. Engineering Design Package (see Attachment A)– Upload PDF  \nb. Total Project Cost Document (including the minimum 25 percent match)– Break out costs related to, at a minimum, the following categories: Engineering and Design, Labor, and Materials and Equipment (template available, if needed) .  \nc. Project Implementation Plan (Gantt chart optional)– Build-out timeline with milestones for key project activities (template available, if needed) .  \nd. Capital Investment Schedule – A high-level financial plan outlining the allocation of funds for  \nnetwork deployment, demonstrating that the full build-out and initiation of service will be completed within four years from the date the grant agreement is executed. The schedule should provide a clear timeline of investments, ensuring project milestones are met in accordance with the proposed Project Implementation Plan (template available, if needed) .  \nThe requirements listed above are taken from the Arkansas BEAD Initial Proposal Volume II and the BEAD NOFO, Page 74.  \n1 Preliminary selections within the same Tranche may be combined into a larger grouping with the approval of ARConnect.","cbCaigsdf91JfPRd","https://ap.wps.com/l/cbCaigsdf91JfPRd","pdf",145236,"English","# Preliminary Selectee Requirements\n# Project Plan\n## Engineering Design Package\n## Total Project Cost Document\n## Project Implementation Plan\n## Capital Investment Schedule","[{\"question\":\"What documentation is required from preliminary selectees for the Arkansas BEAD Program?\",\"answer\":\"Preliminary selectees must provide a Commitment Letter from a qualified financial institution or performance bond issuer, and a comprehensive Project Plan. The Project Plan includes an Engineering Design Package, Total Project Cost Document, Project Implementation Plan, and Capital Investment Schedule.\"},{\"question\":\"What is the deadline for submitting the preliminary selectee requirements?\",\"answer\":\"All required items must be submitted within 30 days of receiving the “Preliminary Selectee Notification Letter.”\"},{\"question\":\"What are the key components of the Project Plan for the Arkansas BEAD Program?\",\"answer\":\"The Project Plan comprises four main components: the Engineering Design Package, the Total Project Cost Document (including a minimum 25 percent match), the Project Implementation Plan (detailing build-out timeline and milestones), and the Capital Investment Schedule (outlining fund allocation for network deployment over four years).\"}]","Arkansas BEAD Program – Preliminary Selectee Requirements – T2 | PDF",1789181802]