[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-1-en-105":3,"doc-seo-241671-105":53,"doc-detail-241671-en":127},{"code":4,"msg":5,"data":6},0,"success",[7,14,19,24,29,34,39,44,49],{"id":8,"doc_module":9,"doc_module_name":10,"category_name":11,"show_sort_weight":12,"slug":13},11,1,"Template","Presentations",90,"presentations",{"id":15,"doc_module":9,"doc_module_name":10,"category_name":16,"show_sort_weight":17,"slug":18},12,"Resumes",80,"resumes",{"id":20,"doc_module":9,"doc_module_name":10,"category_name":21,"show_sort_weight":22,"slug":23},14,"Invoices",70,"invoices",{"id":25,"doc_module":9,"doc_module_name":10,"category_name":26,"show_sort_weight":27,"slug":28},15,"Posters",60,"posters",{"id":30,"doc_module":9,"doc_module_name":10,"category_name":31,"show_sort_weight":32,"slug":33},16,"Social Media",50,"social-media",{"id":35,"doc_module":9,"doc_module_name":10,"category_name":36,"show_sort_weight":37,"slug":38},17,"Forms",40,"forms",{"id":40,"doc_module":9,"doc_module_name":10,"category_name":41,"show_sort_weight":42,"slug":43},18,"Letters",30,"letters",{"id":45,"doc_module":9,"doc_module_name":10,"category_name":46,"show_sort_weight":47,"slug":48},21,"Paper Templates",5,"papers-templates",{"id":50,"doc_module":9,"doc_module_name":10,"category_name":51,"show_sort_weight":4,"slug":52},158,"General","general-158",{"code":4,"msg":54,"data":55},"ok",{"site_id":56,"language":57,"slug":58,"title":59,"keywords":60,"description":61,"schema_data":62,"social_meta":120,"head_meta":122,"extra_data":124,"updated_unix":126},105,"en","application-form-for-taking-in-charge-public-lighting-cork-county-council","Application Form for Taking in Charge Public Lighting - Cork County Council","","Application form for developers seeking Cork County Council takeover of public lighting associated with housing estates and public road schemes. Collects developer details, planning references, housing estate/road information, and MPRN data including number of lights and lantern specifications. Requires submission of certification, public lighting design reports, reality and layout drawings, as-built drawings, energy bill evidence, warranty details, and circuit and fuse information. Includes council minimum data requirements per light aligned to a standard inventory template.",{"@graph":63,"@context":119},[64,80,102],{"@type":65,"itemListElement":66},"BreadcrumbList",[67,71,74,77],{"item":68,"name":69,"@type":70,"position":9},"https://docshare.wps.com","Home","ListItem",{"item":72,"name":10,"@type":70,"position":73},"https://docshare.wps.com/template/",2,{"item":75,"name":36,"@type":70,"position":76},"https://docshare.wps.com/template/forms/",3,{"item":78,"name":59,"@type":70,"position":79},"https://docshare.wps.com/template/application-form-for-taking-in-charge-public-lighting-cork-county-council/241671/",4,{"url":78,"name":59,"@type":81,"image":82,"author":87,"headline":59,"publisher":90,"fileFormat":93,"inLanguage":57,"description":61,"dateModified":94,"datePublished":95,"encodingFormat":93,"isAccessibleForFree":96,"interactionStatistic":97},"DigitalDocument",{"url":83,"@type":84,"width":85,"height":86},"https://docshare.wps.com/thumbnails/application-form-for-taking-in-charge-public-lighting-cork-county-council/241671.png","ImageObject",442,249,{"name":88,"@type":89},"wps_ap_test_251126_0180","Person",{"url":68,"name":91,"@type":92},"DocShare","Organization","application/pdf","2026-10-12","2026-09-12",true,{"@type":98,"interactionType":99,"userInteractionCount":101},"InteractionCounter",{"@type":100},"ViewAction",6,{"@type":103,"mainEntity":104},"FAQPage",[105,111,115],{"name":106,"@type":107,"acceptedAnswer":108},"What information must be provided in the general section of the application form?","Question",{"text":109,"@type":110},"The form requests the developer’s name and address, telephone and email, planning reference number, housing estate/road name and address, number of housing units, energy supplier, and A/C name and number.","Answer",{"name":112,"@type":107,"acceptedAnswer":113},"What MPRN-related details are required for public lighting takeover?",{"text":114,"@type":110},"Applicants must provide MPRN information, including the (T)MPRN number, number of lights, and lantern type and wattage. Additional MPRNs should be provided where applicable on a separate sheet.",{"name":116,"@type":107,"acceptedAnswer":117},"Which documents must be submitted with the application?",{"text":118,"@type":110},"Required submissions include RECI certification for the lights (paper and electronic), public lighting design reports and lighting reality/layout drawings, as-built drawings with column and connection details, recent energy bill evidence, warranty information with expiry dates, circuit drawings and fuse details, and light details using the attached standard inventory template.","https://schema.org",{"og:url":78,"og:type":121,"og:title":59,"og:site_name":91,"og:description":61},"article",{"robots":123,"canonical":78},"index,follow",{"doc_id":125,"site_id":56},241671,1790467844,{"code":4,"msg":5,"data":128},{"doc_id":125,"user_id":129,"nickname":88,"user_avatar":130,"doc_module":9,"category_id":35,"category_name":36,"doc_title":59,"doc_description":61,"doc_content":131,"file_id":132,"file_url":133,"file_type":134,"file_size":135,"view_count":101,"is_deleted":4,"is_public":9,"is_downloadable":9,"audit_status":9,"page_count":79,"language":136,"language_code":57,"site_id":56,"html_lang":57,"table_of_contents":137,"faqs":138,"seo_title":139,"seo_description":61,"update_tm":140,"read_time":73},8796095027276,"https://avatar.qwps.com/avatar/d3BzX2FwX3Rlc3RfMjUxMTI2XzAxODA=","COMHAIRLE CONTAE CHORCAI  CORK COUNTY COUNCIL  \nApplication Form for taking in charge Public Lighting  \nGeneral Information  \n1. Developer’s Name:    \n2. Developer’s Address:    \n3. Telephone No.  4. Email Address:    \n5. Planning Ref. No.    \n7. Name of Housing Estate/Road:   \n8. Address:     \n9. No. of Housing Units:    \n10. Energy Supplier:   11. A/C Name & No.    \nMPRN Information (1st MPRN)  \n12. (T)MPRN No.    \n13. No. of Lights:  14. Lantern Type & Wattage:    \n2nd and subsequent MPRN information should be provided where applicable on a separate sheet  \nThe following documents are required to be submitted with the application:  \n• RECI cert for the lights to be taken in charge, in paper and electronic format.  \n• Public Lighting Design Report (Lighting Reality) and Public Lighting Layout Drawings, associated with the development.  \n• As –built drawings of the Housing Estate/Development showing the position of columns (incl. Col. Nos.), micro pillars, ducting Layout, power supply location and circuits from each power source indicating which lights are connected to which supply point.  \n• Copies of recent energy bill, including evidence that indicates that payments are up to date.  \n• Details of any warranties (inclusive of expiry dates) associated with component parts.  \n• Details of each Light in accordance with SEAI/CCMA Standardised Public Lighting Inventory Template excel spreadsheet attached in as much detail as possible.  \n• General date of installation of Public Lighting (year)  \n• Circuit drawings and fuse details  \nNote: Cork County Council will only take over street lights in occupied sections of a housing estates and provided that the lights in question do not constitute part of an MPRN. (i.e. if an MPRN contains some lights within occupied section and some lights in unoccupied section, Cork County Council will not take over any of the lights associated with that MPRN until all of those lights are within a section that is occupied).  \nApplicants acknowledge that any lights requested for taking-in-charge will be inspected by the Council’s Public Lighting maintenance Contractor in advance and only schemes which are up to standard will be taken in charge. Otherwise the process will revert back until the lights are deemed to have been brought up to standard, by the Applicant.  \nSigned:  Date:   \nDeveloper  \nCompleted Application Forms for Housing Estates should be returned to:  \n• Estates Section, Planning Department, Co. Hall, Cork -for North & South Cork Divisions and Estates Section,  \n• Planning Department, Norton House, Skibbereen –for Western Division.  \nCompleted application forms for new lights/schemes on public roads shall be returned to the Public Lighting Engineer, Cork County Council, Annabella, Mallow, Co. Cork.  \nCork County Council minimum data requirements per light  \n\n| Data item (extracted from SEAI Attributes, Nov 2015) | Data inserted by Applicant | Explanation |\n| --- | --- | --- |\n| 1) Street name/address |  | Name of Housing estate / Street name and address |\n| 2) Road No. if on public Rd. |  | e.g. L 1234 |\n| 4) Village, Town or District |  | e.g. Mallow |\n| 6) Unit Owner |  | Name of payer of Energy Bills |\n| 7) TII Lighting Unit |  | Yes/No. (Yes if on a national Route |\n| 10) Unit Number |  | Tag Number on light |\n| 11) Unit Type |  | This is the type of structure used to mount the luminaire, e.g. column / wall mounted |\n| 12) Unit Co-ordinate northing |  | ITM (Irish Transverse Mercator) format |\n| 12) Unit Co-ordinate easting |  | ITM (Irish Transverse Mercator) format |\n| 16) Column Cross-Section |  | Style and shape of the column. Generally octagonal tapered. |\n| 17) Col Height |  | ground level, generally 5m, 6m, 8m, 10m or 12m. |\n| 18) Column Material type |  | e.g. steel/aluminium/cast iron/wood. |\n| 18) Column base type |  | e.g. Rooted or flanged |\n| 21) Column installation date |  | To the nearest year |\n| 23) Bracket Material |  | e.g. steel, aluminium, cast iron |\n| 24) Brack","cbCaihBZyNdKKAwW","https://ap.wps.com/l/cbCaihBZyNdKKAwW","pdf",282834,"English","# General Information\n## MPRN Information\n## Required Supporting Documents\n## Council Conditions for Taking Over Street Lights\n## Inspection Acknowledgement and Sign-Off\n# Developer Return Addresses\n# Cork County Council Minimum Data Requirements per Light","[{\"question\":\"What information must be provided in the general section of the application form?\",\"answer\":\"The form requests the developer’s name and address, telephone and email, planning reference number, housing estate/road name and address, number of housing units, energy supplier, and A/C name and number.\"},{\"question\":\"What MPRN-related details are required for public lighting takeover?\",\"answer\":\"Applicants must provide MPRN information, including the (T)MPRN number, number of lights, and lantern type and wattage. Additional MPRNs should be provided where applicable on a separate sheet.\"},{\"question\":\"Which documents must be submitted with the application?\",\"answer\":\"Required submissions include RECI certification for the lights (paper and electronic), public lighting design reports and lighting reality/layout drawings, as-built drawings with column and connection details, recent energy bill evidence, warranty information with expiry dates, circuit drawings and fuse details, and light details using the attached standard inventory template.\"}]","Application Form for Taking in Charge Public Lighting - Cork County Council | PDF",1789178822]