[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-detail-187718-en":3,"doc-seo-187718-105":30,"detail-sidebar-cat-1-en-105":92},{"code":4,"msg":5,"data":6},0,"success",{"doc_id":7,"user_id":8,"nickname":9,"user_avatar":10,"doc_module":11,"category_id":12,"category_name":13,"doc_title":14,"doc_description":15,"doc_content":16,"file_id":17,"file_url":18,"file_type":19,"file_size":20,"view_count":4,"is_deleted":4,"is_public":11,"is_downloadable":11,"audit_status":11,"page_count":21,"language":22,"language_code":23,"site_id":24,"html_lang":23,"table_of_contents":25,"faqs":26,"seo_title":27,"seo_description":15,"update_tm":28,"read_time":29},187718,1374391974468,"Eden","https://ap-avatar.wpscdn.com/davatar_29158cc5080c5b710cf443261637dec0",1,11,"Presentations","Application Bespoke - Aldbrough site report EPR CP3225SW A001 - 01.07.25","This document sets out the objectives and desk study approach for assessing land pollution risk at the Aldbrough site under PPC permitting requirements. It describes the report’s environmental setting review, including installation location, installation details, and sources of desk study research such as environmental databases, public records, authorisations, waste management licenses, and historical map sheets. It evaluates site layout, pollution potential, and provides a conceptual site model supported by geological and hydrogeological information.","| DRAFT | NAME\u003Cbr>DJ Rowley | NAME\u003Cbr>G Harker | NAME\u003Cbr>ISC Hughes |\n| --- | --- | --- | --- |\n| DATE\u003Cbr>April 2006 | SIGNATURE | SIGNATURE | SIGNATURE |\n\n\n| DRAFT | NAME | NAME | NAME |\n| --- | --- | --- | --- |\n| DATE | SIGNATURE | SIGNATURE | SIGNATURE |\n\n\n| REVISION | NAME | NAME | NAME |\n| --- | --- | --- | --- |\n| DATE | SIGNATURE | SIGNATURE | SIGNATURE |\n\n\n| REVISION | NAME | NAME | NAME |\n| --- | --- | --- | --- |\n| DATE | SIGNATURE | SIGNATURE | SIGNATURE |\n\n|  | Contents |  |  |\n| --- | --- | --- | --- |\n|  | 1 | Introduction | 1-1 |\n|  | 1.1 | Site Location | 1-1 |\n|  | 1.2 | Details of the Installation | 1-2 |\n|  | 2 | Objectives | 2-1 |\n|  | 3 | Site Setting and Sources of Desk Study Research Information | 3-1 |\n|  | 3.1 | Introduction | 3-1 |\n|  | 3.2 | Review of Environmental Database | 3-1 |\n|  | 3.3 | Geological and Hydrogeological Data | 3-2 |\n|  | 3.4 | Site Operational Records | 3-2 |\n|  | 3.5 | Existing Site Investigation and Assessment Reports | 3-3 |\n|  | 3.6 | Other Information | 3-3 |\n|  | 4 | Site Layout | 4-1 |\n|  | 4.1 | Storage Tanks and Associated Pipework | 4-1 |\n|  | 4.2 | Concrete Hardstanding and Bunds | 4-4 |\n|  | 4.3 | Vegetation | 4-4 |\n|  | 4.4 | Surface Water Features | 4-4 |\n|  | 4.5 | Nature of the Storage and Handling of Materials | 4-5 |\n|  | 4.6 | Surface Water and Foul Drainage | 4-5 |\n|  | 4.7 | Other Observations | 4-5 |\n|  | 5 | Assessment of Land Pollution Potential | 5-1 |\n|  | 5.1 | Polluting Substances and Relevant Activities | 5-1 |\n|  | 5.2 | Historical Sources of Pollution | 5-1 |\n|  | 5.3 | Preventative Measures | 5-3 |\n|  | 5.4 | Assessment of the Likelihood of Land Pollution | 5-3 |\n|  | 6 | Conceptual Site Model | 6-1 |\n|  | 6.1 | Regional Geology | 6-1 |\n\n| 2 | Objectives |\n| --- | --- |\n|  | The objectives of this report are to satisfy the requirements of the PPC Regulations at the time of permitting by:\u003Cbr>• Identifying the environmental setting and land pollution history of the site;\u003Cbr>• Identifying activities that will be conducted at the installation that may lead to land pollution;\u003Cbr>• Identifying and assessing the pollution prevention measures that are in place to protect the land and:\u003Cbr>• Assessing whether there is:\u003Cbr>- little likelihood that land pollution or leaks to land will occur during the future life of the installation;\u003Cbr>or, there is\u003Cbr>- a reasonable possibility that there is potential for current or future land pollution of the land from the installation.\u003Cbr>The following sections of the report present the data that has been obtained for the installation and the surrounding area. |\n\n| 3 | Site Setting and Sources of Desk Study Research Information |\n| --- | --- |\n|  | 3.1 Introduction |\n|  | The following sections detail the sources of desk study information reviewed in order |\n|  | to describe the condition of the installation and, in particular, to determine the |\n|  | potential for substances to be present in, on or under the land associated with |\n|  | present and past uses of the site and its surrounding areas. |\n|  | 3.2 Review of Environmental Database |\n|  | Landmark Information Group was commissioned to provide an Envirocheck report |\n|  | for the site and surrounds. The Envirocheck report details publicly available records |\n|  | of Discharge Consents, Waste Management Licences, Abstraction Licences, IPC |\n|  | Authorisations, PPC Permits, Land Drainage Consents and Trade Effluent |\n|  | Consents. Landmark also provided a series of historical map sheets dating from |\n|  | 1855 to 1999. |\n|  | A check was also made of the Environment Agency “What’s In My Backyard?” |\n|  | (WIMBY) website ([www.environment-agency.gov.uk/maps](www.environment-agency.gov.uk/maps)) for information on IPC |\n|  | Authorisations, waste management licences and flood risk in the vicinity of the |\n|  | installation. |\n|  | A copy of the Envirocheck report is included in Appendix B1 . |\n|  | Details of site history are presented in Section 5.2 below, and detail","cbCainxCx9XSOrn6","https://ap.wps.com/l/cbCainxCx9XSOrn6","pdf",429164,38,"English","en",105,"# 1 Introduction\n## 1.1 Site Location\n## 1.2 Details of the Installation\n# 2 Objectives\n# 3 Site Setting and Sources of Desk Study Research Information\n## 3.1 Introduction\n## 3.2 Review of Environmental Database\n## 3.3 Geological and Hydrogeological Data\n## 3.4 Site Operational Records\n## 3.5 Existing Site Investigation and Assessment Reports\n## 3.6 Other Information\n# 4 Site Layout\n## 4.1 Storage Tanks and Associated Pipework\n## 4.2 Concrete Hardstanding and Bunds\n## 4.3 Vegetation\n## 4.4 Surface Water Features\n## 4.5 Nature of the Storage and Handling of Materials\n## 4.6 Surface Water and Foul Drainage\n## 4.7 Other Observations\n# 5 Assessment of Land Pollution Potential\n## 5.1 Polluting Substances and Relevant Activities\n## 5.2 Historical Sources of Pollution\n## 5.3 Preventative Measures\n## 5.4 Assessment of the Likelihood of Land Pollution\n# 6 Conceptual Site Model\n## 6.1 Regional Geology","[{\"question\":\"What are the objectives of the report for the Aldbrough site?\",\"answer\":\"The report aims to meet PPC permitting requirements by identifying the site’s environmental setting and land pollution history, the activities that could lead to land pollution, and the pollution prevention measures in place. It also assesses the likelihood of future land pollution or leakage during the installation’s future life.\"},{\"question\":\"What sources of desk study information were reviewed?\",\"answer\":\"The report reviews publicly available records and databases such as Envirocheck information on discharge consents, waste management licences, abstraction licences, authorisations, and other relevant consents. It also includes historical map sheets and checks for information from the Environment Agency’s “What’s In My Backyard?” site.\"},{\"question\":\"How does the document assess land pollution potential?\",\"answer\":\"It analyses polluting substances and relevant activities, reviews historical pollution sources, and considers preventative measures. It then assesses the likelihood of land pollution by combining these elements into an overall risk view.\"}]","Application Bespoke - Aldbrough site report EPR CP3225SW A001 - 01.07.25 | PDF",1788384963,13,{"code":4,"msg":31,"data":32},"ok",{"site_id":24,"language":23,"slug":33,"title":14,"keywords":34,"description":15,"schema_data":35,"social_meta":87,"head_meta":89,"extra_data":91,"updated_unix":28},"application-bespoke-aldbrough-site-report-epr-cp3225sw-a001-010725","",{"@graph":36,"@context":86},[37,54,69],{"@type":38,"itemListElement":39},"BreadcrumbList",[40,44,48,51],{"item":41,"name":42,"@type":43,"position":11},"https://docshare.wps.com","Home","ListItem",{"item":45,"name":46,"@type":43,"position":47},"https://docshare.wps.com/template/","Template",2,{"item":49,"name":13,"@type":43,"position":50},"https://docshare.wps.com/template/presentations/",3,{"item":52,"name":14,"@type":43,"position":53},"https://docshare.wps.com/template/application-bespoke-aldbrough-site-report-epr-cp3225sw-a001-010725/187718/",4,{"url":52,"name":14,"@type":55,"author":56,"headline":14,"publisher":58,"fileFormat":61,"inLanguage":23,"description":15,"dateModified":62,"datePublished":63,"encodingFormat":61,"isAccessibleForFree":64,"interactionStatistic":65},"DigitalDocument",{"name":9,"@type":57},"Person",{"url":41,"name":59,"@type":60},"DocShare","Organization","application/pdf","2026-09-03","2026-09-02",true,{"@type":66,"interactionType":67,"userInteractionCount":11},"InteractionCounter",{"@type":68},"ViewAction",{"@type":70,"mainEntity":71},"FAQPage",[72,78,82],{"name":73,"@type":74,"acceptedAnswer":75},"What are the objectives of the report for the Aldbrough site?","Question",{"text":76,"@type":77},"The report aims to meet PPC permitting requirements by identifying the site’s environmental setting and land pollution history, the activities that could lead to land pollution, and the pollution prevention measures in place. It also assesses the likelihood of future land pollution or leakage during the installation’s future life.","Answer",{"name":79,"@type":74,"acceptedAnswer":80},"What sources of desk study information were reviewed?",{"text":81,"@type":77},"The report reviews publicly available records and databases such as Envirocheck information on discharge consents, waste management licences, abstraction licences, authorisations, and other relevant consents. It also includes historical map sheets and checks for information from the Environment Agency’s “What’s In My Backyard?” site.",{"name":83,"@type":74,"acceptedAnswer":84},"How does the document assess land pollution potential?",{"text":85,"@type":77},"It analyses polluting substances and relevant activities, reviews historical pollution sources, and considers preventative measures. It then assesses the likelihood of land pollution by combining these elements into an overall risk view.","https://schema.org",{"og:url":52,"og:type":88,"og:title":14,"og:site_name":59,"og:description":15},"article",{"robots":90,"canonical":52},"index,follow",{"doc_id":7,"site_id":24},{"code":4,"msg":5,"data":93},[94,97,102,107,112,117,122,127,132],{"id":12,"doc_module":11,"doc_module_name":46,"category_name":13,"show_sort_weight":95,"slug":96},90,"presentations",{"id":98,"doc_module":11,"doc_module_name":46,"category_name":99,"show_sort_weight":100,"slug":101},12,"Resumes",80,"resumes",{"id":103,"doc_module":11,"doc_module_name":46,"category_name":104,"show_sort_weight":105,"slug":106},14,"Invoices",70,"invoices",{"id":108,"doc_module":11,"doc_module_name":46,"category_name":109,"show_sort_weight":110,"slug":111},15,"Posters",60,"posters",{"id":113,"doc_module":11,"doc_module_name":46,"category_name":114,"show_sort_weight":115,"slug":116},16,"Social Media",50,"social-media",{"id":118,"doc_module":11,"doc_module_name":46,"category_name":119,"show_sort_weight":120,"slug":121},17,"Forms",40,"forms",{"id":123,"doc_module":11,"doc_module_name":46,"category_name":124,"show_sort_weight":125,"slug":126},18,"Letters",30,"letters",{"id":128,"doc_module":11,"doc_module_name":46,"category_name":129,"show_sort_weight":130,"slug":131},21,"Paper Templates",5,"papers-templates",{"id":133,"doc_module":11,"doc_module_name":46,"category_name":134,"show_sort_weight":4,"slug":135},158,"General","general-158"]