[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-1-en-105":3,"doc-seo-240270-105":53,"doc-detail-240270-en":127},{"code":4,"msg":5,"data":6},0,"success",[7,14,19,24,29,34,39,44,49],{"id":8,"doc_module":9,"doc_module_name":10,"category_name":11,"show_sort_weight":12,"slug":13},11,1,"Template","Presentations",90,"presentations",{"id":15,"doc_module":9,"doc_module_name":10,"category_name":16,"show_sort_weight":17,"slug":18},12,"Resumes",80,"resumes",{"id":20,"doc_module":9,"doc_module_name":10,"category_name":21,"show_sort_weight":22,"slug":23},14,"Invoices",70,"invoices",{"id":25,"doc_module":9,"doc_module_name":10,"category_name":26,"show_sort_weight":27,"slug":28},15,"Posters",60,"posters",{"id":30,"doc_module":9,"doc_module_name":10,"category_name":31,"show_sort_weight":32,"slug":33},16,"Social Media",50,"social-media",{"id":35,"doc_module":9,"doc_module_name":10,"category_name":36,"show_sort_weight":37,"slug":38},17,"Forms",40,"forms",{"id":40,"doc_module":9,"doc_module_name":10,"category_name":41,"show_sort_weight":42,"slug":43},18,"Letters",30,"letters",{"id":45,"doc_module":9,"doc_module_name":10,"category_name":46,"show_sort_weight":47,"slug":48},21,"Paper Templates",5,"papers-templates",{"id":50,"doc_module":9,"doc_module_name":10,"category_name":51,"show_sort_weight":4,"slug":52},158,"General","general-158",{"code":4,"msg":54,"data":55},"ok",{"site_id":56,"language":57,"slug":58,"title":59,"keywords":60,"description":61,"schema_data":62,"social_meta":120,"head_meta":122,"extra_data":124,"updated_unix":126},105,"en","appendix-e-template-work-plan-alternative-fire-debris-removal-program-standard-work-plan-template","APPENDIX E - Template Work Plan - Alternative Fire Debris Removal Program Standard Work Plan Template","","Appendix E provides a standard work plan template for the Alternative Fire Debris Removal Program after the River Fire, outlining safe procedures for removing structural ash and debris. Property owners can participate through the Cal OES Program or submit an Alternative Program Application and Work Plan to Placer County Environmental Health. The template specifies eligibility conditions, submission timing for Phase II requirements, required notifications and permits, site assessment and testing plans, foundation handling options, and required documentation for contractors and soil consultants.",{"@graph":63,"@context":119},[64,80,102],{"@type":65,"itemListElement":66},"BreadcrumbList",[67,71,74,77],{"item":68,"name":69,"@type":70,"position":9},"https://docshare.wps.com","Home","ListItem",{"item":72,"name":10,"@type":70,"position":73},"https://docshare.wps.com/template/",2,{"item":75,"name":46,"@type":70,"position":76},"https://docshare.wps.com/template/paper-templates/",3,{"item":78,"name":59,"@type":70,"position":79},"https://docshare.wps.com/template/appendix-e-template-work-plan-alternative-fire-debris-removal-program-standard-work-plan-template/240270/",4,{"url":78,"name":59,"@type":81,"image":82,"author":87,"headline":59,"publisher":90,"fileFormat":93,"inLanguage":57,"description":61,"dateModified":94,"datePublished":95,"encodingFormat":93,"isAccessibleForFree":96,"interactionStatistic":97},"DigitalDocument",{"url":83,"@type":84,"width":85,"height":86},"https://docshare.wps.com/thumbnails/appendix-e-template-work-plan-alternative-fire-debris-removal-program-standard-work-plan-template/240270.png","ImageObject",442,249,{"name":88,"@type":89},"Melati","Person",{"url":68,"name":91,"@type":92},"DocShare","Organization","application/pdf","2026-10-14","2026-09-11",true,{"@type":98,"interactionType":99,"userInteractionCount":101},"InteractionCounter",{"@type":100},"ViewAction",8,{"@type":103,"mainEntity":104},"FAQPage",[105,111,115],{"name":106,"@type":107,"acceptedAnswer":108},"What options do property owners have to manage post-River Fire ash and debris?","Question",{"text":109,"@type":110},"Property owners can either participate in the Cal OES Program or submit an Alternative Fire Debris Removal Program Application and Work Plan to Placer County Environmental Health.","Answer",{"name":112,"@type":107,"acceptedAnswer":113},"When must the Alternative Program Work Plan be submitted to comply with Phase II requirements?",{"text":114,"@type":110},"The Alternative Program Work Plan must be submitted within 60 days of the submission of the Alternative Program Application.",{"name":116,"@type":107,"acceptedAnswer":117},"Who performs site testing and what is tested under the site assessment section?",{"text":118,"@type":110},"A certified asbestos consultant and a soil consultant are hired, and the testing covers asbestos and soil so the site can be authorized for proper disposal of remaining ash and debris.","https://schema.org",{"og:url":78,"og:type":121,"og:title":59,"og:site_name":91,"og:description":61},"article",{"robots":123,"canonical":78},"index,follow",{"doc_id":125,"site_id":56},240270,1790560511,{"code":4,"msg":5,"data":128},{"doc_id":125,"user_id":129,"nickname":88,"user_avatar":130,"doc_module":9,"category_id":45,"category_name":46,"doc_title":59,"doc_description":61,"doc_content":131,"file_id":132,"file_url":133,"file_type":134,"file_size":135,"view_count":101,"is_deleted":4,"is_public":9,"is_downloadable":9,"audit_status":9,"page_count":136,"language":137,"language_code":57,"site_id":56,"html_lang":57,"table_of_contents":138,"faqs":139,"seo_title":140,"seo_description":61,"update_tm":141,"read_time":79},962085570644,"https://ap-avatar.wpscdn.com/davatar_994ba38a5ba835b3df7d355c54d3ed8d","APPENDIX E  \nTemplate Work Plan  \nAlternative Fire Debris Removal Program Standard Work Plan Template  \nTo ensure safety to workers, the public and the environment, property owners, contractors and consultants must follow proper protocol when removing structural ash and debris left from the River Fire. The County is offering two ways for property owners to manage the fire debris and ash from the wildfire disaster: 1) participate in the Cal OES Program or 2) submit the Alternative Fire Debris Removal Program Application (Alternative Program Application) and Work Plan to Placer County Environmental Health.  \nProperty owners who choose not to participate in the Cal OES Program (or who have qualifying structureson the property but are not eligible for the Cal OES Program will need to submit the Alternative Program Application and Work Plan application to Placer County Environmental Health. Property owners/contractors may begin debris removal once Environmental Health has approved the application and work plan.  \nIf a property did not include a qualifying structure (120 square feet or more), the property owner is not required to complete the Alternative Program Application. These property owners should contact Placer County Environmental Health to obtain a certificate to bring ash and debris to Western Regional Landfill.  \nProperty owners/contractors must complete debris removal and cleanup to the Cal OES Program standard, as required by the urgency ordinances approved by local government. These standards are established to ensure protection of public health and the environment. This document is a standard work plan template for the Alternative Fire Debris Removal Program work plan.  \nComplete and submit both this standard work plan and the Alternative Program Application to Placer County Environmental Health located 3091 County Enter Dr., Auburn, CA, 95603 or email it to [environmentalhealth@placer.ca.gov](environmentalhealth@placer.ca.gov. The Alternative)[. The Alternative](environmentalhealth@placer.ca.gov. The Alternative) Program Work Plan must be submitted within 60 days of the submission of the Alternative Program Application to comply with Phase II Debris Removal requirements. The Work Plan shall be provided to the contractor performing debris removal and consultant performing soil testing so they can perform the work in a safe, complete and accurate manner. The approved Work Plan must be on-site and followed by all contractors, sub-contractors and soil consultants.  \n1.0 Project Overview  \n\n| 1.1 Property Information and Property Owners |\n| --- |\n| Property Owner Name: |\n| Property Address: City: Zip: |\n| Assessor’s Parcel Number (APN): |\n| Phone(s): Email: |\n| Mailing Address: City: Zip: |\n\n\n| 1.2 List of Contractor(s) and Consultants |  |\n| --- | --- |\n| Name:\u003Cbr>Phone: | License No.:\u003Cbr>Email: |\n| Name: | License No.: |\n| Phone: | Email: |\n| Name: | License No.: |\n| Phone: | Email: |\n\n\n| 1.3 Scope of Work: |\n| --- |\n| Provide a brief description of property and proposed activities (Footprint, description of structures and/or debris). Attach Photos/Sketches of ash footprint. |\n\n\n| Identify/discuss proposed equipment material staging areas: |\n| --- |\n| Identify/discuss Site Health and Safety Protocols and Traffic Control: |\n| If applicable, damaged water wells and/or water lines on property will be addressed in the following manner: |\n| If applicable, damaged septic systems and/or sewer lines on property will be addressed in the following manner: |\n\nAttach Photos and Diagrams of ash footprint, other property specific hazards (swimming pools, large vehicles), water and electrical lines, if available.  \n\n| 1.4 REQUIRED Notifications / Permits |\n| --- |\n| The following notifications will be made and permits obtained: |\n| Underground Service Alert (USA)– Call 811 Dig Alert prior to digging. |\n| Obtain approval of your Alternative Program Application from:\u003Cbr>Placer County Environmental Health\u003Cbr>3091 County Enter Dr., Auburn","cbCaib3iwoBoqCkk","https://ap.wps.com/l/cbCaib3iwoBoqCkk","pdf",195581,10,"English","# 1.0 Project Overview\n## 1.1 Property Information and Property Owners\n## 1.2 List of Contractor(s) and Consultants\n## 1.3 Scope of Work\n## 1.4 REQUIRED Notifications / Permits\n# 2.0 Site Assessment\n## 2.1 Site Testing and Analysis Plan (Asbestos and Soil)\n## 2.2 Foundation Analysis and Plan\n## 3.1 Hazardous Waste and Asbestos Removal","[{\"question\":\"What options do property owners have to manage post-River Fire ash and debris?\",\"answer\":\"Property owners can either participate in the Cal OES Program or submit an Alternative Fire Debris Removal Program Application and Work Plan to Placer County Environmental Health.\"},{\"question\":\"When must the Alternative Program Work Plan be submitted to comply with Phase II requirements?\",\"answer\":\"The Alternative Program Work Plan must be submitted within 60 days of the submission of the Alternative Program Application.\"},{\"question\":\"Who performs site testing and what is tested under the site assessment section?\",\"answer\":\"A certified asbestos consultant and a soil consultant are hired, and the testing covers asbestos and soil so the site can be authorized for proper disposal of remaining ash and debris.\"}]","APPENDIX E - Template Work Plan - Alternative Fire Debris Removal Program Standard Work Plan Template | PDF",1789159205]