[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-166785-105":3,"detail-sidebar-cat-1-en-105":80,"doc-detail-166785-en":126},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":73,"head_meta":75,"extra_data":77,"updated_unix":79},105,"en","annex-c-technical-proposal-forms-form-templates-for-technical-bids","ANNEX C - TECHNICAL PROPOSAL FORMS - Form templates for technical bids","","ANNEX C presents a set of required templates for a UNICEF technical proposal submission. It specifies that annexes and supporting information must be provided in the sample format, including a completed and signed proposal form, declaration section, and representative details such as name, title, signature, and validity period. The annex also lists structured forms covering bidder general information, contact details, staff qualification and experience with signed CV requirements, machine and equipment inventories, financial adequacy documents, records of similar completed services, works in hand, litigation disclosures, and a detailed project implementation plan with schedules, risk analysis, and mitigation measures.",{"@graph":14,"@context":72},[15,34,55],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/template/","Template",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/template/forms/","Forms",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/template/annex-c-technical-proposal-forms-form-templates-for-technical-bids/166785/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/annex-c-technical-proposal-forms-form-templates-for-technical-bids/166785.png","ImageObject",442,249,{"name":42,"@type":43},"Mason","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/vnd.openxmlformats-officedocument.wordprocessingml.document","2026-09-23","2026-08-31",true,{"@type":52,"interactionType":53,"userInteractionCount":33},"InteractionCounter",{"@type":54},"ViewAction",{"@type":56,"mainEntity":57},"FAQPage",[58,64,68],{"name":59,"@type":60,"acceptedAnswer":61},"What does Form 1 require for a UNICEF technical proposal submission?","Question",{"text":62,"@type":63},"Form 1 must be completed, signed, and returned to UNICEF according to the sample format, including the information and declaration sections and representative and supplier details.","Answer",{"name":65,"@type":60,"acceptedAnswer":66},"What submission requirements apply to Form 5 (staff qualification and experience)?",{"text":67,"@type":63},"Form 5 requires qualifications and experience of key personnel, with signed CVs limited to max two pages each, and notes that staff substitutions during implementation require UNICEF approval.",{"name":69,"@type":60,"acceptedAnswer":70},"What elements must be included in the Proposed Project Implementation Plan (Form 11)?",{"text":71,"@type":63},"Form 11 must include implementation methods, workforce numbers, a quality control strategy, a detailed activity schedule (bar chart) with personnel and deliverables alignment, risk analysis with mitigation, and approaches to mitigate negative social and environmental impacts plus labor rights and health and safety.","https://schema.org",{"og:url":32,"og:type":74,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":76,"canonical":32},"index,follow",{"doc_id":78,"site_id":7},166785,1788200828,{"code":4,"msg":81,"data":82},"success",[83,88,93,98,103,108,112,117,122],{"id":84,"doc_module":22,"doc_module_name":25,"category_name":85,"show_sort_weight":86,"slug":87},11,"Presentations",90,"presentations",{"id":89,"doc_module":22,"doc_module_name":25,"category_name":90,"show_sort_weight":91,"slug":92},12,"Resumes",80,"resumes",{"id":94,"doc_module":22,"doc_module_name":25,"category_name":95,"show_sort_weight":96,"slug":97},14,"Invoices",70,"invoices",{"id":99,"doc_module":22,"doc_module_name":25,"category_name":100,"show_sort_weight":101,"slug":102},15,"Posters",60,"posters",{"id":104,"doc_module":22,"doc_module_name":25,"category_name":105,"show_sort_weight":106,"slug":107},16,"Social Media",50,"social-media",{"id":109,"doc_module":22,"doc_module_name":25,"category_name":29,"show_sort_weight":110,"slug":111},17,40,"forms",{"id":113,"doc_module":22,"doc_module_name":25,"category_name":114,"show_sort_weight":115,"slug":116},18,"Letters",30,"letters",{"id":118,"doc_module":22,"doc_module_name":25,"category_name":119,"show_sort_weight":120,"slug":121},21,"Paper Templates",5,"papers-templates",{"id":123,"doc_module":22,"doc_module_name":25,"category_name":124,"show_sort_weight":4,"slug":125},158,"General","general-158",{"code":4,"msg":81,"data":127},{"doc_id":78,"user_id":128,"nickname":42,"user_avatar":129,"doc_module":22,"category_id":109,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":130,"file_id":131,"file_url":132,"file_type":133,"file_size":134,"view_count":33,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":135,"language":136,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":137,"faqs":138,"seo_title":139,"seo_description":12,"update_tm":79,"read_time":140},5909887256941,"https://ap-avatar.wpscdn.com/davatar_9964176cb1d06d4a9deccf72a44ae3dc","ANNEX C: TECHNICAL PROPOSAL FORMS\nThe following Annexes and information there within are considered an integral part of this submission and must be provided for the Proposal to be considered. The information should be provided according to the sample format.\nForm 1: Technical Proposal Submission\nThis PROPOSAL FORM must be completed, signed and returned to UNICEF. Proposal must be made in accordance with the instructions contained in this Request for Proposal.\nINFORMATION\nAny request for information concerning this invitation must be forwarded in writing by email or by fax, to the person who prepared this document, with specific reference to the RFP number.\nDECLARATION\nThe undersigned, having read the Terms of Reference, the UNICEF Contract for Construction Works, the UNICEF General Terms and Conditions, and RFP# [….] set out in the attached document, hereby offers to supply the services specified in Terms of Reference at the price or prices quoted in the Schedule of Prices, in accordance with the specifications stated and subject to the Terms and Conditions set out or specified in the RFP# […….]\nName of authorized representative:\t\t_______________________________________\nTitle:\t\t\t\t\t_______________________________________\nSignature:\t\t\t\t_______________________________________\nDate:\t\t\t\t\t_______________________________________\nSupplier Name:\t\t\t\t_______________________________________\nPostal Address:\t\t\t\t_______________________________________\nTelephone No.:\t\t\t\t_______________________________________\nFax No.:\t\t\t\t\t_______________________________________\nEmail Address:\t\t\t\t_______________________________________\nValidity of Offer (not less than 90 days):\t_______________________________________\nCurrency of Offer:\t\t\t\t_______________________________________\n\u000fForm 2: Technical Proposal Letter\nDate: ___________\nTo: \tUNICEF Moldova, 131, 31 August 1989, MD-2012, Chisinau, Moldova\nDear Madam/Sir,\nWe, the undersigned, offer to provide reconstruction of Cahul Barnahus (integrated Centre for child victims/ witnesses of crimes) as specified in Terms of Reference in accordance with your Request for Proposal (RFP#_) dated [August 2024] and our Proposal dated [---------------]. We are hereby submitting our Proposal, which includes this Technical Proposal and a Financial Proposal sealed under separate envelopes.\nIf negotiations are held during the period of validity of the Proposal, we undertake to negotiate based on the proposed staff. Our Proposal is binding upon us and subject to the modifications resulting from Contract negotiations.\nWe understand that you are not bound to accept any Proposal you receive.\nYours sincerely,\nAuthorized Signature:\nName and Title of Signatory:\nName of Construction Company\nAddress:\u000f\nForm 3: Potential Bidder General Information\nForm 4: Potential Bidder’s Contact Details,\n\u000f\nForm 5: Staff Qualification and Experience\nQualifications and experience of key management and technical personnel proposed for this Project. Signed CVs (Max. two (2) pages) of all proposed key staff must accompany the submission, and it should be noted that substitution of staff during Project implementation shall be subject to the approval of UNICEF. (Key Personnel of all sub-Contractors must also be listed along with the name of the sub-Contracting Companies). A detailed organization chart of the company, including the location and staffing of existing offices must also be attached to the offer.\nForm 6: List of Machine and Equipment\nBidders are required to submit a detailed list of all equipment that will be used for the execution of the works. The list should clearly distinguish between equipment specifically allocated for this project and equipment that is part of the bidder's general inventory.\nForm 7: Potential Bidder’s Financial Information/ Adequacy of Working Capital\nIMPORTANT: Please provide attached copies of Financial Reports for the last two (2) years.\nForm 8: List of Completed Similar Services Undertaken the Last 3 Years\nPlease provide c","cbCaiuxTFtPYIliR","https://ap.wps.com/l/cbCaiuxTFtPYIliR","docx",470775,73,"English","# Form 1: Technical Proposal Submission\n## Information\n## Declaration\n# Form 2: Technical Proposal Letter\n# Form 3: Potential Bidder General Information\n# Form 4: Potential Bidder’s Contact Details\n# Form 5: Staff Qualification and Experience\n# Form 6: List of Machine and Equipment\n# Form 7: Potential Bidder’s Financial Information / Adequacy of Working Capital\n# Form 8: List of Completed Similar Services Undertaken the Last 3 Years\n# Form 9: Works in hand & their Financial Value\n# Form 10: Litigations\n# Form 11: Proposed Project Implementation Plan","[{\"question\":\"What does Form 1 require for a UNICEF technical proposal submission?\",\"answer\":\"Form 1 must be completed, signed, and returned to UNICEF according to the sample format, including the information and declaration sections and representative and supplier details.\"},{\"question\":\"What submission requirements apply to Form 5 (staff qualification and experience)?\",\"answer\":\"Form 5 requires qualifications and experience of key personnel, with signed CVs limited to max two pages each, and notes that staff substitutions during implementation require UNICEF approval.\"},{\"question\":\"What elements must be included in the Proposed Project Implementation Plan (Form 11)?\",\"answer\":\"Form 11 must include implementation methods, workforce numbers, a quality control strategy, a detailed activity schedule (bar chart) with personnel and deliverables alignment, risk analysis with mitigation, and approaches to mitigate negative social and environmental impacts plus labor rights and health and safety.\"}]","ANNEX C - TECHNICAL PROPOSAL FORMS - Form templates for technical bids | DOCX",26]