[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-254909-105":3,"doc-detail-254909-en":81,"detail-sidebar-cat-1-en-105":96},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":74,"head_meta":76,"extra_data":78,"updated_unix":80},105,"en","alaska-gasline-development-corporation-air-quality-construction-permit-application-project-identification-form-revision","Alaska Gasline Development Corporation - Air Quality Construction Permit Application - Project Identification Form (Revision)","","Air Quality Construction Permit Application submission for the Alaska LNG Gas Treatment Plant (GTP) at Prudhoe Bay, Alaska, requesting an 18-month extension of the permit start date to complete pre-construction activities, including final design. The re-application updates the Best Available Control Technology (BACT) analysis and revises applicable requirements to reflect post-2020 regulatory changes, while incorporating prior application materials by reference. It provides required project, stationary source, and owner/operator identification details for ADEC review and approval.",{"@graph":14,"@context":73},[15,34,56],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/template/","Template",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/template/forms/","Forms",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/template/alaska-gasline-development-corporation-air-quality-construction-permit-application-project-identification-form-revision/254909/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/alaska-gasline-development-corporation-air-quality-construction-permit-application-project-identification-form-revision/254909.png","ImageObject",442,249,{"name":42,"@type":43},"Aran","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-10-23","2026-09-13",true,{"@type":52,"interactionType":53,"userInteractionCount":55},"InteractionCounter",{"@type":54},"ViewAction",12,{"@type":57,"mainEntity":58},"FAQPage",[59,65,69],{"name":60,"@type":61,"acceptedAnswer":62},"What permit extension is being requested and why?","Question",{"text":63,"@type":64},"AGDC requests an 18-month extension of the permit start date to allow additional time for completing required pre-construction project activities, including final design.","Answer",{"name":66,"@type":61,"acceptedAnswer":67},"What parts of the application were updated compared with the original submission?",{"text":68,"@type":64},"The application includes an updated BACT analysis and an updated applicable requirements table reflecting regulatory changes since 2020, while other elements remain unchanged.",{"name":70,"@type":61,"acceptedAnswer":71},"Which facility and address information are included in the form?",{"text":72,"@type":64},"The form identifies the Gas Treatment Plant (GTP) for Alaska LNG, lists the stationary source location in Prudhoe Bay, and provides contact, mailing, and operator/owner details for review by ADEC.","https://schema.org",{"og:url":32,"og:type":75,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":77,"canonical":32},"index,follow",{"doc_id":79,"site_id":7},254909,1789283157,{"code":4,"msg":82,"data":83},"success",{"doc_id":79,"user_id":84,"nickname":42,"user_avatar":85,"doc_module":22,"category_id":86,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":87,"file_id":88,"file_url":89,"file_type":90,"file_size":91,"view_count":55,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":33,"language":92,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":93,"faqs":94,"seo_title":95,"seo_description":12,"update_tm":80,"read_time":26},137455076865,"https://ap-avatar.wpscdn.com/davatar_29158cc5080c5b710cf443261637dec0",17,"February 10, 2025  \nState of Alaska Dept. of Environmental Conservation Division of Air Quality Attn: James Plosay  \n410 Willoughby Avenue, Suite 603 Juneau, Alaska 99811-1800  \nRE: Air Quality Construction Permit No. AQ1524CPT01 – Alaska LNG Gas Treatment Plant Permit Extension Request and Updated Application  \nDear Mr. Plosay:  \nThe Alaska Gasline Development Corporation (AGDC) was issued the subject Air Quality Construction Permit for the Gas Treatment Plant (GTP) located in Prudhoe Bay, Alaska on August 13, 2020. We requested and received a second permit extension from ADEC on July 14, 2023 to allow time for completion of the necessary pre-construction project activities including Front-End Engineering Design (FEED) . As stipulated in ADEC’s July 2023 extension letter, we understood that a request for 3rd extension would require submittal of an updated application. Further AGDC and ADEC staff met on April 2, 2024 to outline requirements of the re-application package. Accordingly, and as specified in Condition No. 2 of the permit, AGDC is requesting an 18-month extension of the permit start date to allow additional time for completion of the necessary pre-construction project activities including final design, and provides the enclosed construction permit application for ADEC review and approval.  \nThe enclosed application includes an updated Best Available Control Technology (BACT) analysis. Outside engineering input was contracted to complete the BACT assessment, including updates to the cost and other technical data. The enclosed application also includes an updated applicable requirements table that reflects changes in regulatory requirements that have occurred since 2020.  \nAll other elements of the prior application remain unchanged. This application incorporates by reference the prior application and supporting information for the construction permit issued for this facility. A copy of the prior permit and Technical Assistance Report (TAR) are included as Attachment 4 in this submittal.  \nPlease contact Lisa Haas (907-947-9353, [lhaas@agdc.us](lhaas@agdc.us)) if have you have any questions on our extension request.  \nSincerely,  \nFrank T. Richards President  \ncc:  \nDave Jones, ADEC Lisa Haas, AGDC  \nAlaska Department of Environmental Conservation AIR QUALITY CONSTRUCTION PERMIT APPLICATION Project Information Form  \nSection 1 Stationary Source Information  \n\n| Stationary Source Name: Gas Treatment Plant (GTP) |  |  | SIC: 1311 |\n| --- | --- | --- | --- |\n| Project Name (if different): Alaska LNG | Stationary Source Frank T Richards |  |  |\n| Source Physical Address: Prudhoe Bay, Alaska | City: Anchorage | State: AK | Zip: 99503 |\n|  | Telephone: 907-330-6352\u003Cbr>E-Mail Address: [Frichards@agdc.us](Frichards@agdc.us) |  |  |\n| UTM Coordinates (m) or Latitude/Longitude: | Northing:\u003Cbr>Latitude: 70.3199 | Easting: Zone:\u003Cbr>Longitude: 148.5573 |  |\n\nSection 2 Legal Owner Section 3 Operator (if different from owner)  \n\n| Name: Alaska Gasline Development Corporation |  |  | Name: Same as Owner |  |  |\n| --- | --- | --- | --- | --- | --- |\n| Mailing Address: 3201 C Street, Suite 505 |  |  | Mailing Address: |  |  |\n| City: Anchorage | State: AK | Zip: 99503 | City: | State: | Zip: |\n| Telephone: 907-330-6300 |  |  | Telephone: |  |  |\n| E-Mail Address: [Frichards@agdc.us](Frichards@agdc.us) |  |  | E-Mail Address: |  |  |\n\nSection 4 Designated Agent (for service of process) Section 5 Billing Contact Person (if different from owner)  \n\n| Name: N/A |  |  |  |  | Name: Olena Brusuelas |  |  |\n| --- | --- | --- | --- | --- | --- | --- | --- |\n| Mailing Address: |  |  |  |  | Mailing Address: 3201 C Street, Suite 200 |  |  |\n| City: |  | State: |  | Zip: | City: Anchorage | State: AK | Zip: 99503 |\n| Physical Address: |  |  |  |  | Telephone: 907-330-6362 |  |  |\n| City: | State: |  | Zip: |  | E-Mail Address: [accounting@agdc.us](accounting@agdc.us) |  |  |\n| Telephone : |  |  |  |  |  |  |  |\n| E-Mail Address: |  |  |  |  |  | ","cbCaigKU6dHh3gJl","https://ap.wps.com/l/cbCaigKU6dHh3gJl","pdf",900952,"English","# Project Information Form\n## Section 1 Stationary Source Information\n## Section 2 Legal Owner\n## Section 3 Operator\n## Section 4 Designated Agent\n## Section 5 Billing Contact Person\n## Section 6 Application Contact\n## Section 7 Major Permit Classification(s)\n## Section 8 Minor Permit Classification(s)\n## Section 9 Project Description","[{\"question\":\"What permit extension is being requested and why?\",\"answer\":\"AGDC requests an 18-month extension of the permit start date to allow additional time for completing required pre-construction project activities, including final design.\"},{\"question\":\"What parts of the application were updated compared with the original submission?\",\"answer\":\"The application includes an updated BACT analysis and an updated applicable requirements table reflecting regulatory changes since 2020, while other elements remain unchanged.\"},{\"question\":\"Which facility and address information are included in the form?\",\"answer\":\"The form identifies the Gas Treatment Plant (GTP) for Alaska LNG, lists the stationary source location in Prudhoe Bay, and provides contact, mailing, and operator/owner details for review by ADEC.\"}]","Alaska Gasline Development Corporation - Air Quality Construction Permit Application - Project Identification Form (Revision) | PDF",{"code":4,"msg":82,"data":97},[98,103,107,112,117,122,125,130,135],{"id":99,"doc_module":22,"doc_module_name":25,"category_name":100,"show_sort_weight":101,"slug":102},11,"Presentations",90,"presentations",{"id":55,"doc_module":22,"doc_module_name":25,"category_name":104,"show_sort_weight":105,"slug":106},"Resumes",80,"resumes",{"id":108,"doc_module":22,"doc_module_name":25,"category_name":109,"show_sort_weight":110,"slug":111},14,"Invoices",70,"invoices",{"id":113,"doc_module":22,"doc_module_name":25,"category_name":114,"show_sort_weight":115,"slug":116},15,"Posters",60,"posters",{"id":118,"doc_module":22,"doc_module_name":25,"category_name":119,"show_sort_weight":120,"slug":121},16,"Social Media",50,"social-media",{"id":86,"doc_module":22,"doc_module_name":25,"category_name":29,"show_sort_weight":123,"slug":124},40,"forms",{"id":126,"doc_module":22,"doc_module_name":25,"category_name":127,"show_sort_weight":128,"slug":129},18,"Letters",30,"letters",{"id":131,"doc_module":22,"doc_module_name":25,"category_name":132,"show_sort_weight":133,"slug":134},21,"Paper Templates",5,"papers-templates",{"id":136,"doc_module":22,"doc_module_name":25,"category_name":137,"show_sort_weight":4,"slug":138},158,"General","general-158"]