[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-242458-105":3,"detail-sidebar-cat-1-en-105":81,"doc-detail-242458-en":127},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":74,"head_meta":76,"extra_data":78,"updated_unix":80},105,"en","agency-specific-development-timeline-for-central-wave-interfaces-task-tech105","Agency-Specific Development Timeline for Central Wave Interfaces - Task TECH105","","Task TECH105 defines how select Florida agencies (AHCA, APD, Citrus, DACS, DBPR, DCF, DEM, DEO, DEP, DFS, DJJ, DLA, DOE, DOH, DOR, FCOR, FDC, FDOT, FLHSMV, FWC, JAC, FRS, iFLAIR, MFMP, PF, STMS, LASPBS) must create an agency-specific development timeline for Central Wave interfaces. The timeline must cover design, build, and unit testing for each interface and its business systems, including effort level, committed resources, and start/end dates. It must align with TECH85, SPON45 section two, and the provided template, and be submitted by March 12, 2021 to FloridaPALM@myfloridacfo.com.",{"@graph":14,"@context":73},[15,34,56],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/template/","Template",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/template/presentations/","Presentations",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/template/agency-specific-development-timeline-for-central-wave-interfaces-task-tech105/242458/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/agency-specific-development-timeline-for-central-wave-interfaces-task-tech105/242458.png","ImageObject",442,249,{"name":42,"@type":43},"Caleb Sterling","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-10-15","2026-09-12",true,{"@type":52,"interactionType":53,"userInteractionCount":55},"InteractionCounter",{"@type":54},"ViewAction",13,{"@type":57,"mainEntity":58},"FAQPage",[59,65,69],{"name":60,"@type":61,"acceptedAnswer":62},"What is the purpose of Task TECH105 for Central Wave interfaces?","Question",{"text":63,"@type":64},"To create an agency-specific development timeline for Central Wave interfaces so Florida PALM can support agencies as they design, build, and unit test prior to Central Interface Testing starting in August 2021.","Answer",{"name":66,"@type":61,"acceptedAnswer":67},"What must be included in each interface’s timeline?",{"text":68,"@type":64},"For every interface and associated business system, document the design, build, and unit testing effort level, whether resources are committed, and the start and end dates using the provided template.",{"name":70,"@type":61,"acceptedAnswer":71},"Which existing documents and sections must the timeline align with?",{"text":72,"@type":64},"The timeline must align with Agency Status Report Section Two (SPON45), the Interface Connection Inventory (TECH85), and the Agency-Specific Development Timeline requirements.","https://schema.org",{"og:url":32,"og:type":75,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":77,"canonical":32},"index,follow",{"doc_id":79,"site_id":7},242458,1791739881,{"code":4,"msg":82,"data":83},"success",[84,88,93,98,103,108,113,118,123],{"id":85,"doc_module":22,"doc_module_name":25,"category_name":29,"show_sort_weight":86,"slug":87},11,90,"presentations",{"id":89,"doc_module":22,"doc_module_name":25,"category_name":90,"show_sort_weight":91,"slug":92},12,"Resumes",80,"resumes",{"id":94,"doc_module":22,"doc_module_name":25,"category_name":95,"show_sort_weight":96,"slug":97},14,"Invoices",70,"invoices",{"id":99,"doc_module":22,"doc_module_name":25,"category_name":100,"show_sort_weight":101,"slug":102},15,"Posters",60,"posters",{"id":104,"doc_module":22,"doc_module_name":25,"category_name":105,"show_sort_weight":106,"slug":107},16,"Social Media",50,"social-media",{"id":109,"doc_module":22,"doc_module_name":25,"category_name":110,"show_sort_weight":111,"slug":112},17,"Forms",40,"forms",{"id":114,"doc_module":22,"doc_module_name":25,"category_name":115,"show_sort_weight":116,"slug":117},18,"Letters",30,"letters",{"id":119,"doc_module":22,"doc_module_name":25,"category_name":120,"show_sort_weight":121,"slug":122},21,"Paper Templates",5,"papers-templates",{"id":124,"doc_module":22,"doc_module_name":25,"category_name":125,"show_sort_weight":4,"slug":126},158,"General","general-158",{"code":4,"msg":82,"data":128},{"doc_id":79,"user_id":129,"nickname":42,"user_avatar":130,"doc_module":22,"category_id":85,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":131,"file_id":132,"file_url":133,"file_type":134,"file_size":135,"view_count":55,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":22,"language":136,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":137,"faqs":138,"seo_title":139,"seo_description":12,"update_tm":140,"read_time":4},962084925290,"https://ap-avatar.wpscdn.com/davatar_085a072bc5b1113ac321206ff7593b45","Task Instructions  \nTask ID: TECH105  \nWave: Central Wave  \nAudience: Select Agencies – AHCA, APD, Citrus, DACS, DBPR, DCF, DEM, DEO, DEP, DFS, DJJ, DLA, DOE, DOH, DOR, FCOR, FDC, FDOT, FLHSMV, FWC, JAC, FRS, iFLAIR, MFMP, PF, STMS,  \nLASPBS  \nTask Name: Create Agency-Specific Development Timeline for Central Wave Interfaces  \nTask Type: Interfaces  \nTask Due Date: March 12, 2021  \nTask Overview  \nYou previously identified the interfaces your team plans to use for the Central Wave and which of your agency business systems will use each interface (TECH85) .  \nFor each interface you identified in your Interface Connection Inventory, share your agency’s timeline, including level of effort and if resources are committed, for designing, building, and unit testing (TECH95) . This task is in preparation for Central Wave Interface Testing with the Florida PALM Project planned to begin in August 2021.  \nProvide your agency’s internal timeline using the template provided. The interface information provided should align with Section Two of your monthly Agency Status Report (SPON45) .  \nWhat will the Florida PALM Team do with this information?  \nThe Florida PALM Team will use this information to support your agency as you continue the design, build, and unit test prior to Central Interface Testing beginning in August 2021.  \nTask Instructions  \nPlease work with your agency’s Change Champion Network (CCN) and team familiar with Central Wavefunctions to coordinate who will be completing each of the items involved with this task.  \n\n| Instructions |\n| --- |\n| 1) Review the current and expected progress of internal design, build, and unit test activities asa part of MRW Task TECH95. |\n| 2) Using the provided template, document your agency’s timeline, including level of effort and the resources committed, for each interface and associated business system’s design, build, and unit test including start and end dates. |\n| 3) Confirm alignment with the current Agency Status Report Section Two (SPON45), your Interface Connection Inventory (TECH85), and the Agency-Specific Development Timeline. |\n| 4) Submit the completed Agency-Specific Development Timeline using the provided template to FloridaPALM@myfloridacfo.com by March 12, 2021. |\n\nSupporting Materials & Resources:  \n• Agency-Specific Development Timeline Template  \n• Agency Status Reports  \n• Interface Connection Inventory","cbCaipZK9UvPTzXz","https://ap.wps.com/l/cbCaipZK9UvPTzXz","pdf",128710,"English","# Task Instructions\n## Task Overview\n## Florida PALM Team Use\n## Coordination Requirements\n## Step-by-Step Instructions\n## Supporting Materials & Resources","[{\"question\":\"What is the purpose of Task TECH105 for Central Wave interfaces?\",\"answer\":\"To create an agency-specific development timeline for Central Wave interfaces so Florida PALM can support agencies as they design, build, and unit test prior to Central Interface Testing starting in August 2021.\"},{\"question\":\"What must be included in each interface’s timeline?\",\"answer\":\"For every interface and associated business system, document the design, build, and unit testing effort level, whether resources are committed, and the start and end dates using the provided template.\"},{\"question\":\"Which existing documents and sections must the timeline align with?\",\"answer\":\"The timeline must align with Agency Status Report Section Two (SPON45), the Interface Connection Inventory (TECH85), and the Agency-Specific Development Timeline requirements.\"}]","Agency-Specific Development Timeline for Central Wave Interfaces - Task TECH105 | PDF",1789190818]