[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-241460-105":3,"detail-sidebar-cat-1-en-105":72,"doc-detail-241460-en":118},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":65,"head_meta":67,"extra_data":69,"updated_unix":71},105,"en","aei-submission-clarification-sheet-sf330-and-rfq-overlap","AEI Submission Clarification Sheet - SF330 and RFQ Overlap","","Submission clarification instructions detail how SF330 information maps to RFQ evaluation factors for GSA submission. It specifies which SF330 sections satisfy RFQ Factors A, B, C, D, and E and which additional RFQ items are not contained in SF330 but must be provided separately under the correct evaluation-factor tabs. The sheet also lists required attachments for contract-specific qualifications, including architect-engineer point of contact, proposed team roster, organizational chart, resumes, example projects, and past performance items.",{"@graph":14,"@context":64},[15,34,55],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/template/","Template",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/template/forms/","Forms",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/template/aei-submission-clarification-sheet-sf330-and-rfq-overlap/241460/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/aei-submission-clarification-sheet-sf330-and-rfq-overlap/241460.png","ImageObject",442,249,{"name":42,"@type":43},"Sophia Brooks","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-10-10","2026-09-12",true,{"@type":52,"interactionType":53,"userInteractionCount":22},"InteractionCounter",{"@type":54},"ViewAction",{"@type":56,"mainEntity":57},"FAQPage",[58],{"name":59,"@type":60,"acceptedAnswer":61},"What limits apply to submitted projects and related management/quality control plans?","Question",{"text":62,"@type":63},"Project submissions are limited to no more than five projects. Narrative/graphic content is limited to no more than two 8.5\" x 11\" pages per project, and past-project management and quality control plans are limited per project as described (including total page implications when multiple projects are submitted).","Answer","https://schema.org",{"og:url":32,"og:type":66,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":68,"canonical":32},"index,follow",{"doc_id":70,"site_id":7},241460,1791607113,{"code":4,"msg":73,"data":74},"success",[75,80,85,90,95,100,104,109,114],{"id":76,"doc_module":22,"doc_module_name":25,"category_name":77,"show_sort_weight":78,"slug":79},11,"Presentations",90,"presentations",{"id":81,"doc_module":22,"doc_module_name":25,"category_name":82,"show_sort_weight":83,"slug":84},12,"Resumes",80,"resumes",{"id":86,"doc_module":22,"doc_module_name":25,"category_name":87,"show_sort_weight":88,"slug":89},14,"Invoices",70,"invoices",{"id":91,"doc_module":22,"doc_module_name":25,"category_name":92,"show_sort_weight":93,"slug":94},15,"Posters",60,"posters",{"id":96,"doc_module":22,"doc_module_name":25,"category_name":97,"show_sort_weight":98,"slug":99},16,"Social Media",50,"social-media",{"id":101,"doc_module":22,"doc_module_name":25,"category_name":29,"show_sort_weight":102,"slug":103},17,40,"forms",{"id":105,"doc_module":22,"doc_module_name":25,"category_name":106,"show_sort_weight":107,"slug":108},18,"Letters",30,"letters",{"id":110,"doc_module":22,"doc_module_name":25,"category_name":111,"show_sort_weight":112,"slug":113},21,"Paper Templates",5,"papers-templates",{"id":115,"doc_module":22,"doc_module_name":25,"category_name":116,"show_sort_weight":4,"slug":117},158,"General","general-158",{"code":4,"msg":73,"data":119},{"doc_id":70,"user_id":120,"nickname":42,"user_avatar":121,"doc_module":22,"category_id":101,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":122,"file_id":123,"file_url":124,"file_type":125,"file_size":126,"view_count":112,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":26,"language":127,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":128,"faqs":129,"seo_title":130,"seo_description":12,"update_tm":131,"read_time":22},962084925636,"https://ap-avatar.wpscdn.com/davatar_994ba38a5ba835b3df7d355c54d3ed8d","REQUIRED INFORMATION  \nSF330 SF330 and RFQ Overlap RFQ  \nAll information on the SF330 is required and must be completed and submitted to GSA.  \nSF330 and RFQ Overlap:  \nThe below information, from the SF330, satisfies some of the RFQ Evaluation requirements (Factors A,B, C, D and E)  \nThe below information is NOT included in the SF330 but must still be submitted to GSA, included under the tab for the appropriate Evaluation Factor  \nSF330 Information  \nPART I -CONTRACT-SPECIFIC QUALIFICATIONS  \nA. Contract Information Required to be filled out and submitted to GSA  \nB. Architect-Engineer POC Required to be filled out and submitted to GSA  \nC. Proposed Team-six names Required to be filled out and submitted to GSA  \nD. Orgainizational Chart of Proposed Team Attach per form instructions  \nE. Resumes of Key Personnel Proposed for this Contract  \nand Relevant Projects Required to be filled out and submitted to GSA  \nF. Example Projects Which Best Illustrate Proposed Team's  \nQualifications For This Contract Required to be filled out and submitted to GSA  \nG. Key Personnel Participation in Example Projects Required to be filled out and submitted to GSA  \nH. Additional Information: Required to be filled out and submitted to GSA  \nRequired to be filled out and submitted to GSA. The Management Plan requiered on the SF330 is specific to this solicitation, not past projects, and will also be used for future task orders that will result from this  \nH1-Management Plan-template for future task orders contract award.  \nRequired to be filled out and submitted to GSA. The Quality Control plan in the SF330 is specific to this solicitation, not past projects, and will also be used for  \nH2-Quality Control Plan-template for future task orders future task orders that will result from contract award.  \nFactor B: Professional Qualifications, is fulfilled by Section C of the SF330 . Submit this information on SF330 only.  \nFactor B: Professional Qualifications, is fulfilled by Section C of the SF330 . Submit this information on SF330 only.  \nFactor A: Specialized Experience and Technical Competence, is fulfilled by Section F of the SF330 . Submit this information on SF330 only.  \nProject Limits: No more than five projects should be submitted.  \nPage Limits: No more than two 8. 5\" x 11\" pages containing narrative and/or graphic material per project.  \nN/A  \nN/A  \nN/A  \nREQUIRED INFORMATION  \nH3-Past Performance  \nH4-Lead Designer's Philosophy  \nPART II -GENERAL QUALIFICATIONS  \nSTAGE 1- EVALUATION CRITERIA (RFQ)  \nFactor D-Management and Quality Control Plans (past projects)  \nFactor E-Location  \n\n|  | SF330 | SF330 and RFQ Overlap | RFQ |\n| --- | --- | --- | --- |\n|  | All information on the SF330 is required and must be completed and submitted to GSA. | SF330 and RFQ Overlap:\u003Cbr>The below information, from the SF330, satisfies some of the RFQ Evaluation requirements (Factors A,B, C, D and E) | The below information is NOT included in the SF330 but must still be submitted to GSA, included under the tab for the appropriate Evaluation Factor |\n|  | Required to be filled out and submitted to GSA | Factor C: Past Performance-self provided performance recognition, is fulfilled by Section H3 of the SF330 . This does not pertain to the PPQ requirement. | Attachment 2, Past Performance Questionaire fulfills this requirement.\u003Cbr>Additional self provided recognition may be submited in Section H3 of the SF330 . |\n|  | Required to be filled out and submitted to GSA | The SF 330, section H4, fulfls this requirment for Factor B-Professional Qualifications-Lead Designer's philosophy |  |\n|  |  |  |  |\n|  | SF330 Part II is required for each proposed subconsultant/subcontractor listed in Section C of SF330 |  |  |\n|  |  |  |  |\n|  |  |  |  |\n\n|  |  | Factor D: Management and Quality Control Plans-provide no more than 3 Management Plans and 3 Quality Control Plans per past projects . Each submitted plan has a 3 page maximum, therefore if 3 projects are submitted then ","cbCaipQ0ZH3MMquS","https://ap.wps.com/l/cbCaipQ0ZH3MMquS","pdf",80898,"English","# Required Information\n## SF330 Information vs RFQ Overlap\n## Contract-Specific Qualifications (Part I)\n## General Qualifications (Part II)\n## Evaluation Criteria and Limits","[{\"question\":\"What limits apply to submitted projects and related management/quality control plans?\",\"answer\":\"Project submissions are limited to no more than five projects. Narrative/graphic content is limited to no more than two 8.5\\\" x 11\\\" pages per project, and past-project management and quality control plans are limited per project as described (including total page implications when multiple projects are submitted).\"}]","AEI Submission Clarification Sheet - SF330 and RFQ Overlap | PDF",1789175650]