[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-1-en-105":3,"doc-seo-307337-105":53,"doc-detail-307337-en":126},{"code":4,"msg":5,"data":6},0,"success",[7,14,19,24,29,34,39,44,49],{"id":8,"doc_module":9,"doc_module_name":10,"category_name":11,"show_sort_weight":12,"slug":13},11,1,"Template","Presentations",90,"presentations",{"id":15,"doc_module":9,"doc_module_name":10,"category_name":16,"show_sort_weight":17,"slug":18},12,"Resumes",80,"resumes",{"id":20,"doc_module":9,"doc_module_name":10,"category_name":21,"show_sort_weight":22,"slug":23},14,"Invoices",70,"invoices",{"id":25,"doc_module":9,"doc_module_name":10,"category_name":26,"show_sort_weight":27,"slug":28},15,"Posters",60,"posters",{"id":30,"doc_module":9,"doc_module_name":10,"category_name":31,"show_sort_weight":32,"slug":33},16,"Social Media",50,"social-media",{"id":35,"doc_module":9,"doc_module_name":10,"category_name":36,"show_sort_weight":37,"slug":38},17,"Forms",40,"forms",{"id":40,"doc_module":9,"doc_module_name":10,"category_name":41,"show_sort_weight":42,"slug":43},18,"Letters",30,"letters",{"id":45,"doc_module":9,"doc_module_name":10,"category_name":46,"show_sort_weight":47,"slug":48},21,"Paper Templates",5,"papers-templates",{"id":50,"doc_module":9,"doc_module_name":10,"category_name":51,"show_sort_weight":4,"slug":52},158,"General","general-158",{"code":4,"msg":54,"data":55},"ok",{"site_id":56,"language":57,"slug":58,"title":59,"keywords":60,"description":61,"schema_data":62,"social_meta":119,"head_meta":121,"extra_data":123,"updated_unix":125},105,"en","addendum-no-3-to-project-bidding-documents-for-rfq-ccc-055","ADDENDUM NO. 3 - To Project Bidding Documents for RFQ CCC-055","","Addendum No. 3 dated September 23, 2019 updates the contract documents for RFQ CCC-055 for Instructional Building #2 at Compton Community College District. The addendum requires prospective bidders to acknowledge receipt to avoid disqualification, and details added bid costs for geotechnical requirements and hazardous waste abatement for 22 fire doors. It provides general responses to bidding RFCs and revises, replaces, or removes multiple numbered sections covering scope of work logistics, demolition, finishes, masonry, insulation, roofing, door assemblies, entrances, curtain walls, plastering, partitions, and HVAC system piping.",{"@graph":63,"@context":118},[64,80,101],{"@type":65,"itemListElement":66},"BreadcrumbList",[67,71,74,77],{"item":68,"name":69,"@type":70,"position":9},"https://docshare.wps.com","Home","ListItem",{"item":72,"name":10,"@type":70,"position":73},"https://docshare.wps.com/template/",2,{"item":75,"name":41,"@type":70,"position":76},"https://docshare.wps.com/template/letters/",3,{"item":78,"name":59,"@type":70,"position":79},"https://docshare.wps.com/template/addendum-no-3-to-project-bidding-documents-for-rfq-ccc-055/307337/",4,{"url":78,"name":59,"@type":81,"image":82,"author":87,"headline":59,"publisher":90,"fileFormat":93,"inLanguage":57,"description":61,"dateModified":94,"datePublished":95,"encodingFormat":93,"isAccessibleForFree":96,"interactionStatistic":97},"DigitalDocument",{"url":83,"@type":84,"width":85,"height":86},"https://docshare.wps.com/thumbnails/addendum-no-3-to-project-bidding-documents-for-rfq-ccc-055/307337.png","ImageObject",442,249,{"name":88,"@type":89},"\tWilliam","Person",{"url":68,"name":91,"@type":92},"DocShare","Organization","application/pdf","2026-10-12","2026-09-19",true,{"@type":98,"interactionType":99,"userInteractionCount":8},"InteractionCounter",{"@type":100},"ViewAction",{"@type":102,"mainEntity":103},"FAQPage",[104,110,114],{"name":105,"@type":106,"acceptedAnswer":107},"What must prospective bidders do to comply with Addendum No. 3?","Question",{"text":108,"@type":109},"Acknowledge receipt of the addendum in the space provided on the Bid Form. Failure to acknowledge may subject the bidder to disqualification.","Answer",{"name":111,"@type":106,"acceptedAnswer":112},"What added bid costs does the addendum require in the contractor’s bid?",{"text":113,"@type":109},"The contractor must include costs related to the supplemental geotechnical report dated September 4, 2019, and abatement and hazardous waste disposal for 22 fire doors in Building D – West per the attached abatement addendum.",{"name":115,"@type":106,"acceptedAnswer":116},"Which types of specification sections are affected by Addendum No. 3?",{"text":117,"@type":109},"The addendum changes the table of contents, revises scope-of-work logistics, and adds or replaces entire numbered specification sections across multiple divisions, while also removing some sections from the contract documents.","https://schema.org",{"og:url":78,"og:type":120,"og:title":59,"og:site_name":91,"og:description":61},"article",{"robots":122,"canonical":78},"index,follow",{"doc_id":124,"site_id":56},307337,1790118107,{"code":4,"msg":5,"data":127},{"doc_id":124,"user_id":128,"nickname":88,"user_avatar":129,"doc_module":9,"category_id":40,"category_name":41,"doc_title":59,"doc_description":61,"doc_content":130,"file_id":131,"file_url":132,"file_type":133,"file_size":134,"view_count":8,"is_deleted":4,"is_public":9,"is_downloadable":9,"audit_status":9,"page_count":135,"language":136,"language_code":57,"site_id":56,"html_lang":57,"table_of_contents":137,"faqs":138,"seo_title":139,"seo_description":61,"update_tm":140,"read_time":141},5909887254083,"https://ap-avatar.wpscdn.com/davatar_276721f389ce27ea32af1340a28f341c","Date: September 23 , 2019  \nADDENDUM NO. 3  \nTo Project Bidding Documents for:  \nRFQ CCC-055  \nA\\#03-119458  \nInstructional Building \\#2  \nCompton Community College District  \ntBP Project. No. 20998.00  \ntBP/ARCHITECTURE 4611 Teller Avenue Newport Beach, CA 92660 949/673-0300  \nTO: PROSPECTIVE BIDDERS  \nThis Addendum forms a part of the Contract Documents and modifies the original approved Bidding Drawings. Acknowledge receipt of this Addendum in space provided on the Bid Form. Failure to acknowledge may subject Bidder to disqualification.  \nGENERAL INFORMATION.  \n1. The contractor shall include in their bid the costs associated with the requirements shown on the supplemental geotechnical report dated September  \n4, 2019. Attached to this Addendum  \n2. The contractor will add abatement and hazardous waste disposal of twenty-two  \n(22) fire doors in Building D – West per the attached Abatement addendum from Bainbridge Environmental Consultants. Attached to this Addendum.  \n3. Responses to Bidding RFCs are attached to this addendum  \nCHANGES TO THE SPECIFICATIONS.  \n1. SECTION 000110-TABLE OF CONTENTS-Replace existing table of Content by new spec section included in this addendum. See attachments  \n2. SECTION 010100-SCOPE OF WORK  \na. Replace previously issued page 17 of Section 010100 Scope of Work (Contractor Laydown Area and Access plan) with the attached Section  \n010100 Scope of Work Logistics Plan showing revised laydown area, revised fencing and contractor entrance to the site. See attachments  \nb. Delete 010100.1.2.A.a.A Phase 2 \\#4 “Re-establishment of the site in the contractor laydown area indicated on the Laydown Site Map also attached at the end of this section 01 01 00”.  \nc. Add the following sentences to the end of 010100.1.2.A.a. B.2“Construction fencing shall be configured to provide access for deliveries to both the Cafeteria and Bookstore in Building Q & R. Access to the site will be allowed from the west side of the site in Parking Lot G. Contractor Laydown area has been moved to an area near Parking Lot H and the MLB Ball fields. Access to the ball fields must not be blocked.”  \nd. Add the following sentence to the end of 010100.1.2.A.a. B.6 “ALL deliveries of material and equipment on large/long bed trucks must be done by 7:00AM or on Friday or Saturday”.  \n3. SECTION 024113-SELECTIVE SITE DEMOLITION – Add the entire new section to Division 02. Included in this addendum. See attachments.  \n4. SECTION 033543-POLISHED CONCRETE FINISHING. Add the entire new section to division 03. Included in this addendum. See attachments.  \n5. SECTION 042100-CLAY UNIT MASONRY. Add the entire new section to division 04. Included in this addendum. See attachments.  \n6. SECTION 042113.13-BRICK VENEER MASONRY. Replace existing spec, in division 04 , by new spec included in this addendum. See attachments.  \n7. SECTION 072100-THERMAL INSULATION. Replace existing spec, in division  \n07 , by new spec included in this addendum. See attachments.  \n8. SECTION 075419-POLYVINYL CHLORIDE PVC ROOFING Replace existing spec, in division 07 , by new spec included in this addendum. See attachments.  \n9. SECTION 083473.13-METAL SOUND CONTROL DOOR ASSEMBLIES. Replace existing spec, in division 08 by the new spec included in this addendum. See attachments.  \n10. SECTION 083473.16-WOOD SOUND CONTROL DOOR ASSEMBLIES. Replace existing spec, in division 08 , by the new spec included in this addendum. See attachments.  \n11. SECTION 084113-ALUMINUM FRAMED ENTRANCES AND STOREFRONTS. Replace existing spec, in division 08. by the new spec included in this addendum. See attachments.  \n12. SECTION 084413-GLAZED ALUMINUM CURTAIN WALLS. Add the new entire section to division 08. Included in this addendum. See attachments.  \n13. SECTION 092400-CEMENT PLASTERING. Replace existing section, in division 09 , by the new spec included in this addendum. See attachments.  \n14. SECTION 097200-WALL COVERING. Remove this section from Contract Documents.  \n15. SECTION 10","cbCaiiWtSBtx1WjH","https://ap.wps.com/l/cbCaiiWtSBtx1WjH","pdf",18788071,355,"English","# GENERAL INFORMATION\n## CHANGES TO THE SPECIFICATIONS","[{\"question\":\"What must prospective bidders do to comply with Addendum No. 3?\",\"answer\":\"Acknowledge receipt of the addendum in the space provided on the Bid Form. Failure to acknowledge may subject the bidder to disqualification.\"},{\"question\":\"What added bid costs does the addendum require in the contractor’s bid?\",\"answer\":\"The contractor must include costs related to the supplemental geotechnical report dated September 4, 2019, and abatement and hazardous waste disposal for 22 fire doors in Building D – West per the attached abatement addendum.\"},{\"question\":\"Which types of specification sections are affected by Addendum No. 3?\",\"answer\":\"The addendum changes the table of contents, revises scope-of-work logistics, and adds or replaces entire numbered specification sections across multiple divisions, while also removing some sections from the contract documents.\"}]","ADDENDUM NO. 3 - To Project Bidding Documents for RFQ CCC-055 | PDF",1789848124,124]