[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-195423-105":3,"detail-sidebar-cat-1-en-105":81,"doc-detail-195423-en":127},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":74,"head_meta":76,"extra_data":78,"updated_unix":80},105,"en","accelerated-repair-program","Accelerated Repair Program","","The Massachusetts School Building Authority (MSBA) has launched the Accelerated Repair Program (ARP), building upon lessons learned from the Open Repair Program. This program aims to address critical facility needs in school districts across the state. The ARP primarily focuses on the repair and replacement of roofs, windows, doors, and boilers, with the potential to include additional systems as determined by the MSBA. By leveraging available funding and capacity within the capital pipeline, the program champions the preservation of existing assets, enhancing energy efficiency, and extending building lifespans. This initiative will result in direct operational savings for school districts, thereby maximizing the impact of their investments. Districts are prioritized for pre-selected projects, requiring them to submit timely funding applications to expedite project completion. The program emphasizes cost-effective and energy-efficient delivery, ensuring that the district's educational program is complemented by well-maintained facilities. Since its inception, numerous districts have actively participated in the ARP, contributing to significant infrastructure improvements. The document outlines key deliverables and deadlines for projects within the program.",{"@graph":14,"@context":73},[15,34,56],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/template/","Template",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/template/general/","General",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/template/accelerated-repair-program/195423/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/accelerated-repair-program/195423.png","ImageObject",442,249,{"name":42,"@type":43},"Emma Mercer","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-09-27","2026-09-03",true,{"@type":52,"interactionType":53,"userInteractionCount":55},"InteractionCounter",{"@type":54},"ViewAction",6,{"@type":57,"mainEntity":58},"FAQPage",[59,65,69],{"name":60,"@type":61,"acceptedAnswer":62},"What is the primary goal of the Accelerated Repair Program (ARP)?","Question",{"text":63,"@type":64},"The primary goal of the ARP is to address urgent repair and replacement needs for roofs, windows, doors, and boilers in school districts, aiming to preserve existing assets and improve energy efficiency.","Answer",{"name":66,"@type":61,"acceptedAnswer":67},"What are the key submission deadlines for projects within the ARP?",{"text":68,"@type":64},"Key deadlines include January 24, 2023, for the Warrant Articles, motions, orders, and votes, February 23, 2023, for certified funding vote submission and Initial Compliance Certification, and various dates in April, June, August, and October 2023 for Schematic Design Package Submissions.",{"name":70,"@type":61,"acceptedAnswer":71},"What type of funding vote is required for the Schematic Design phase of an Accelerated Repair project?",{"text":72,"@type":64},"MSBA requires an original, certified copy of the vote/letter identifying the appropriated funds for the Schematic Design of Accelerated Repair project(s). Additionally, districts must submit the Certified funding vote for Schematic Design by January 24, 2023.","https://schema.org",{"og:url":32,"og:type":75,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":77,"canonical":32},"index,follow",{"doc_id":79,"site_id":7},195423,1788448363,{"code":4,"msg":82,"data":83},"success",[84,89,94,99,104,109,114,119,124],{"id":85,"doc_module":22,"doc_module_name":25,"category_name":86,"show_sort_weight":87,"slug":88},11,"Presentations",90,"presentations",{"id":90,"doc_module":22,"doc_module_name":25,"category_name":91,"show_sort_weight":92,"slug":93},12,"Resumes",80,"resumes",{"id":95,"doc_module":22,"doc_module_name":25,"category_name":96,"show_sort_weight":97,"slug":98},14,"Invoices",70,"invoices",{"id":100,"doc_module":22,"doc_module_name":25,"category_name":101,"show_sort_weight":102,"slug":103},15,"Posters",60,"posters",{"id":105,"doc_module":22,"doc_module_name":25,"category_name":106,"show_sort_weight":107,"slug":108},16,"Social Media",50,"social-media",{"id":110,"doc_module":22,"doc_module_name":25,"category_name":111,"show_sort_weight":112,"slug":113},17,"Forms",40,"forms",{"id":115,"doc_module":22,"doc_module_name":25,"category_name":116,"show_sort_weight":117,"slug":118},18,"Letters",30,"letters",{"id":120,"doc_module":22,"doc_module_name":25,"category_name":121,"show_sort_weight":122,"slug":123},21,"Paper Templates",5,"papers-templates",{"id":125,"doc_module":22,"doc_module_name":25,"category_name":29,"show_sort_weight":4,"slug":126},158,"general-158",{"code":4,"msg":82,"data":128},{"doc_id":79,"user_id":129,"nickname":42,"user_avatar":130,"doc_module":22,"category_id":125,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":131,"file_id":132,"file_url":133,"file_type":134,"file_size":135,"view_count":55,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":136,"language":137,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":138,"faqs":139,"seo_title":140,"seo_description":12,"update_tm":80,"read_time":141},962084925502,"https://ap-avatar.wpscdn.com/davatar_6f874abed73319feea01a86fa6f0fab8","| Deliverable | Deadline |\n| --- | --- |\n| Certified funding vote for Schematic Design |  |\n| • MSBA has issued Vote Bulletins to inform cities, towns, and regional school |  |\n| districts of the requirements for warrant articles, motions, orders, and votes related to any potential projects that may be eligible for MSBA funding (“Schematic Design Vote Language” link on ARP webpage) | January 24, 2023 |\n| • “Cost Data” link on ARP webpage provides previous project budgets for |  |\n| reference |  |\n| Certified funding vote submission\u003Cbr>• MSBA requires an original, certified copy of the vote/letter identifying the appropriated funds for the Schematic Design of Accelerated Repair project(s) | February 23, 2023 |\n| Initial Compliance Certification (“ICC”) submission\u003Cbr>• Includes Exhibit A-Accelerated Repair Program Terms and Conditions | February 23, 2023 |\n| Current routine and capital maintenance plan (“MCP”) submission |  |\n| • Not required if submitted within previous 36 months (See Board Action Letter if required)\u003Cbr>• If required, MCP access form must be submitted first (“Guidelines & Forms”) | February 23, 2023 |\n\n| Schematic Design Package Submission Deadline (By 5:00 PM) | MSBA Board of Directors Meeting |\n| --- | --- |\n| April 27, 2023 | June 21, 2023 |\n| June 27, 2023 | August 30, 2023 |\n| August 31, 2023 | October 25, 2023 |\n| October 26, 2023 | December 13, 2023 |","cbCaipAmkdgfkkBY","https://ap.wps.com/l/cbCaipAmkdgfkkBY","pdf",1217609,23,"English","# Accelerated Repair Program\n## Deliverables and Deadlines\n### Certified funding vote for Schematic Design\n### Certified funding vote submission\n### Initial Compliance Certification (“ICC”) submission\n### Current routine and capital maintenance plan (“MCP”) submission\n## Schematic Design Package Submission Deadlines and MSBA Board of Directors Meetings","[{\"question\":\"What is the primary goal of the Accelerated Repair Program (ARP)?\",\"answer\":\"The primary goal of the ARP is to address urgent repair and replacement needs for roofs, windows, doors, and boilers in school districts, aiming to preserve existing assets and improve energy efficiency.\"},{\"question\":\"What are the key submission deadlines for projects within the ARP?\",\"answer\":\"Key deadlines include January 24, 2023, for the Warrant Articles, motions, orders, and votes, February 23, 2023, for certified funding vote submission and Initial Compliance Certification, and various dates in April, June, August, and October 2023 for Schematic Design Package Submissions.\"},{\"question\":\"What type of funding vote is required for the Schematic Design phase of an Accelerated Repair project?\",\"answer\":\"MSBA requires an original, certified copy of the vote/letter identifying the appropriated funds for the Schematic Design of Accelerated Repair project(s). Additionally, districts must submit the Certified funding vote for Schematic Design by January 24, 2023.\"}]","Accelerated Repair Program | PDF",8]