[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-245807-105":3,"detail-sidebar-cat-1-en-105":81,"doc-detail-245807-en":127},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":74,"head_meta":76,"extra_data":78,"updated_unix":80},105,"en","ac-pre-start-meeting-agenda-and-minutes-template-final-fillable","AC Pre-Start Meeting Agenda and Minutes Template - FINAL Fillable","","Unitywater connection pre-start meeting agenda and minutes template for capturing site readiness and regulatory compliance items. It records attendee information, construction plan amendment status, approved drawings and applicable standards, and verifies that approved sewer and water main pipes, embedment materials, maintenance holes, converter slabs, access chambers, maintenance shafts, and live connection locate levels meet requirements. It also documents conflict-of-interest identification and construction certifier inspection audit schedule expectations with photographic evidence and rectification follow-up.",{"@graph":14,"@context":73},[15,34,56],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/template/","Template",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/template/presentations/","Presentations",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/template/ac-pre-start-meeting-agenda-and-minutes-template-final-fillable/245807/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/ac-pre-start-meeting-agenda-and-minutes-template-final-fillable/245807.png","ImageObject",442,249,{"name":42,"@type":43},"Theodora","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-10-19","2026-09-12",true,{"@type":52,"interactionType":53,"userInteractionCount":55},"InteractionCounter",{"@type":54},"ViewAction",13,{"@type":57,"mainEntity":58},"FAQPage",[59,65,69],{"name":60,"@type":61,"acceptedAnswer":62},"What information is recorded about the meeting participants and approvals?","Question",{"text":63,"@type":64},"The template includes attendee details and records key approval and certification information such as accredited entity, major certifier, construction certifier, and contracting firm details. It also requires identification and recording of all actual, perceived, and potential conflicts of interest.","Answer",{"name":66,"@type":61,"acceptedAnswer":67},"Which standards and drawings must be documented for the pre-start meeting?",{"text":68,"@type":64},"It captures whether construction plans include amendments and lists approved drawings. It also specifies applicable approval standards, including Unitywater technical specifications, SEQ design and construction code, and WSAA national codes, and checks compliance of design plans with the SEQ code standards.",{"name":70,"@type":61,"acceptedAnswer":71},"What are the inspection and recordkeeping expectations for the construction certifier?",{"text":72,"@type":64},"The template requires inspection audit schedule and records, including enough photographic evidence to confirm code compliance. It defines increased inspection frequency during the first two weeks for sewer and the first two weeks for water supply when new contractor relationships exist, and it requires follow-up inspection records after rectification instructions are issued.","https://schema.org",{"og:url":32,"og:type":75,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":77,"canonical":32},"index,follow",{"doc_id":79,"site_id":7},245807,1791725054,{"code":4,"msg":82,"data":83},"success",[84,88,93,98,103,108,113,118,123],{"id":85,"doc_module":22,"doc_module_name":25,"category_name":29,"show_sort_weight":86,"slug":87},11,90,"presentations",{"id":89,"doc_module":22,"doc_module_name":25,"category_name":90,"show_sort_weight":91,"slug":92},12,"Resumes",80,"resumes",{"id":94,"doc_module":22,"doc_module_name":25,"category_name":95,"show_sort_weight":96,"slug":97},14,"Invoices",70,"invoices",{"id":99,"doc_module":22,"doc_module_name":25,"category_name":100,"show_sort_weight":101,"slug":102},15,"Posters",60,"posters",{"id":104,"doc_module":22,"doc_module_name":25,"category_name":105,"show_sort_weight":106,"slug":107},16,"Social Media",50,"social-media",{"id":109,"doc_module":22,"doc_module_name":25,"category_name":110,"show_sort_weight":111,"slug":112},17,"Forms",40,"forms",{"id":114,"doc_module":22,"doc_module_name":25,"category_name":115,"show_sort_weight":116,"slug":117},18,"Letters",30,"letters",{"id":119,"doc_module":22,"doc_module_name":25,"category_name":120,"show_sort_weight":121,"slug":122},21,"Paper Templates",5,"papers-templates",{"id":124,"doc_module":22,"doc_module_name":25,"category_name":125,"show_sort_weight":4,"slug":126},158,"General","general-158",{"code":4,"msg":82,"data":128},{"doc_id":79,"user_id":129,"nickname":42,"user_avatar":130,"doc_module":22,"category_id":85,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":131,"file_id":132,"file_url":133,"file_type":134,"file_size":135,"view_count":55,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":99,"language":136,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":137,"faqs":138,"seo_title":139,"seo_description":12,"update_tm":140,"read_time":121},687197207919,"https://ap-avatar.wpscdn.com/avatar/a000253d6f5f7c60be?x-image-process=image/resize,m_fixed,w_180,h_180&k=1779446848396160552","| Date:   Unitywater Connection Approval No.  \u003Cbr>Development Estate Name:   Stage No.   of   Street Address:  \u003Cbr>Has W&S Construction Commenced:  Yes  No\u003Cbr>Expected Construction Commencement Date:  \u003Cbr>Accredited Entity Name:   Accredited Entity No.   Major Certifier Name:   Major Certifier No.  \u003Cbr>Construction Certifier Name:   Construction Certifier No.  \u003Cbr>Contracting Firm:   Representative:   Phone No.   Conflict of Interest: All actual, perceived and potential conflicts of interest are identified and recorded   |  |  |  |  |\n| --- | --- | --- | --- | --- |\n|  | Name | Company | Phone No | Signature |\n| Attendees |  |  |  |  |\n|  |  |  |  |  |\n|  |  |  |  |  |\n|  |  |  |  |  |\n|  |  |  |  |  |\n|  |  |  |  |  |\n|  |  |  |  |  |\n|  |  |  |  |  |\n\n\n| 1 | Construction Plans with amendments (if applicable) as per conditions of the Unitywater Approval:  Yes  No (Reschedule Prestart Meeting)\u003Cbr>List Approved Drawings:\u003Cbr>Approval Standards Applicable:\u003Cbr> Unitywater technical specifications  SEQ design and construction code  WSAA national codes\u003Cbr>Yes No\u003Cbr>Do the approved design plans comply with the SEQ code Standards.   (Arrange Amendments) |\n| --- | --- |\n| 2 | Sewer Pipes to be used: (Under no circumstances are Core Filled or Solid Core Sandwich pipes and fittings to be used).\u003Cbr>Reticulation  UPVC SN8 (Solid Wall Only)  UPVC Class 12  PE100 SDR21 White Wall Deeper than 3.0m  UPVC Class 12  PE100 SDR21 White Wall\u003Cbr>Pressure  PE100 SDR11 Cream Stripe\u003Cbr>Other Approved:\u003Cbr>Accredited pipe layer: (name and accreditation number)\u003Cbr>At Least one person on site must have completed a pipe laying training course approved by the supplier. The contractor will provide documented evidence of such qualification prior to commencement of the works.  Century Plus DI Pipe Installation (Mandatory for Water Main Construction)  \u003Cbr> PVC “Pipelines Installation Course”    Polyethylene “Electrofusion/Butt Welding of Polyethylene Pipe”    Rehau (letter of competency)    Smartstream Smartpit (letter of competency)    Iplex Ezipit (letter of competency)    Other Approved –   |\n\n\n| 3 | Sewer Pipe embedment material:\u003Cbr> 5/7mm washed screenings nominal single sized aggregate (as per WSA PS-351) .\u003Cbr> Other Approved-   |\n| --- | --- |\n| 4 | Sewer Maintenance Holes (MH) to be used:\u003Cbr> Concrete Pre-Cast (Humes)  Conc. Pre-Cast (Civilmart)  PE Smartstream SmartPit (DN1050)  PP Rehau AWASHFT (DN1000)  PP Iplex Ezipit (DN1000)  Insitu\u003Cbr> Other Approved-   |\n| 5 | Concrete Converter Top Slab to be used:\u003Cbr> Civilmart  Everhard  Insitu  Other IPAM Approved-   |\n| 6 | Concrete Sewer Access Chamber BASE to be used:\u003Cbr> Humes  Civilmart  Insitu \u003Cbr>Other Approved-   |\n| 7 | Maintenance Shafts (MS) to be used:\u003Cbr> Smartstream Poo-Pit (DN600)  PE Smartstream Mini Pit  Iplex Ezipit  SMS  Rehau  Other Approved-   |\n| 8 | Water Main Pipe to be used:\u003Cbr> DICL PN35  PVC-O PN16 SN10 MR S 450  PE100 PN16 SDR11\u003Cbr> Water Main Road Crossings (Min. PN20) -………………………………………………………………\u003Cbr> Other Approved-…………………………………………………………………………………………… |\n| 9 | Water Main Pipe embedment:\u003Cbr> Sand (as per Table G3 of AS/NZS 2566.2) DI pipes only.\u003Cbr> 5/7mm washed screenings nominal single sized aggregate (as per WSA PS-351) .\u003Cbr> Other Approved-   |\n| 10 | Live Connection-Locate Levels of Existing Water and Sewerage Infrastructure:\u003Cbr>Levels of existing water/sewer services and connection points to be verified prior to commencement of construction |\n| 11 |  A Construction Certifier must not also be the construction supervisor for the contractor on the construction site for which he is the appointed Construction Certifier.\u003Cbr>Construction Certifiers Inspections Audit Schedule & Records: \u003Cbr>All records should include enough photographic evidence to support the confirmation of code compliance of works inspected.\u003Cbr>1. First two weeks of Sewer construction works (for new contractor relationships):\u003Cbr>• Daily or twice daily inspection of contractor works, record evidence of works inspected,","cbCaiqzgmedqYsxB","https://ap.wps.com/l/cbCaiqzgmedqYsxB","pdf",1570264,"English","# Pre-Start Meeting Details\n## Attendees and Conflict of Interest\n## Construction Plans and Approved Standards\n# Technical Requirements and Materials\n## Sewer Pipes, Embedment, and Maintenance Structures\n## Water Main Pipes and Embedment\n## Live Connection Locate Levels\n# Construction Certification and Inspection Audit Schedule\n## Inspection Records, Photographic Evidence, and Rectification Follow-Up","[{\"question\":\"What information is recorded about the meeting participants and approvals?\",\"answer\":\"The template includes attendee details and records key approval and certification information such as accredited entity, major certifier, construction certifier, and contracting firm details. It also requires identification and recording of all actual, perceived, and potential conflicts of interest.\"},{\"question\":\"Which standards and drawings must be documented for the pre-start meeting?\",\"answer\":\"It captures whether construction plans include amendments and lists approved drawings. It also specifies applicable approval standards, including Unitywater technical specifications, SEQ design and construction code, and WSAA national codes, and checks compliance of design plans with the SEQ code standards.\"},{\"question\":\"What are the inspection and recordkeeping expectations for the construction certifier?\",\"answer\":\"The template requires inspection audit schedule and records, including enough photographic evidence to confirm code compliance. It defines increased inspection frequency during the first two weeks for sewer and the first two weeks for water supply when new contractor relationships exist, and it requires follow-up inspection records after rectification instructions are issued.\"}]","AC Pre-Start Meeting Agenda and Minutes Template - FINAL Fillable | PDF",1789231244]