[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-1-en-105":3,"doc-seo-240812-105":53,"doc-detail-240812-en":126},{"code":4,"msg":5,"data":6},0,"success",[7,14,19,24,29,34,39,44,49],{"id":8,"doc_module":9,"doc_module_name":10,"category_name":11,"show_sort_weight":12,"slug":13},11,1,"Template","Presentations",90,"presentations",{"id":15,"doc_module":9,"doc_module_name":10,"category_name":16,"show_sort_weight":17,"slug":18},12,"Resumes",80,"resumes",{"id":20,"doc_module":9,"doc_module_name":10,"category_name":21,"show_sort_weight":22,"slug":23},14,"Invoices",70,"invoices",{"id":25,"doc_module":9,"doc_module_name":10,"category_name":26,"show_sort_weight":27,"slug":28},15,"Posters",60,"posters",{"id":30,"doc_module":9,"doc_module_name":10,"category_name":31,"show_sort_weight":32,"slug":33},16,"Social Media",50,"social-media",{"id":35,"doc_module":9,"doc_module_name":10,"category_name":36,"show_sort_weight":37,"slug":38},17,"Forms",40,"forms",{"id":40,"doc_module":9,"doc_module_name":10,"category_name":41,"show_sort_weight":42,"slug":43},18,"Letters",30,"letters",{"id":45,"doc_module":9,"doc_module_name":10,"category_name":46,"show_sort_weight":47,"slug":48},21,"Paper Templates",5,"papers-templates",{"id":50,"doc_module":9,"doc_module_name":10,"category_name":51,"show_sort_weight":4,"slug":52},158,"General","general-158",{"code":4,"msg":54,"data":55},"ok",{"site_id":56,"language":57,"slug":58,"title":59,"keywords":60,"description":61,"schema_data":62,"social_meta":119,"head_meta":121,"extra_data":123,"updated_unix":125},105,"en","abbeyquarter-coach-car-park-construction-management-plan","Abbeyquarter Coach & Car Park Construction Management Plan","","Construction Management Plan template for a temporary coach and car park at Abbeyquarter, Kilkenny (former Smithwicks Brewery site). Defines scope for providing parking for 7 coaches and 132 cars, access arrangements from St Francis Bridge and the Central Access Scheme, and required boundary modifications for 45m sightlines. Covers works on the existing concrete slab, drainage and discharge to the River Breagagh without new outfalls, flood protection, lighting measures limiting light spillage, and provisional timelines and responsible parties, with ecology considerations tied to nearby SAC/SPA designations.",{"@graph":63,"@context":118},[64,80,101],{"@type":65,"itemListElement":66},"BreadcrumbList",[67,71,74,77],{"item":68,"name":69,"@type":70,"position":9},"https://docshare.wps.com","Home","ListItem",{"item":72,"name":10,"@type":70,"position":73},"https://docshare.wps.com/template/",2,{"item":75,"name":11,"@type":70,"position":76},"https://docshare.wps.com/template/presentations/",3,{"item":78,"name":59,"@type":70,"position":79},"https://docshare.wps.com/template/abbeyquarter-coach-car-park-construction-management-plan/240812/",4,{"url":78,"name":59,"@type":81,"image":82,"author":87,"headline":59,"publisher":90,"fileFormat":93,"inLanguage":57,"description":61,"dateModified":94,"datePublished":95,"encodingFormat":93,"isAccessibleForFree":96,"interactionStatistic":97},"DigitalDocument",{"url":83,"@type":84,"width":85,"height":86},"https://docshare.wps.com/thumbnails/abbeyquarter-coach-car-park-construction-management-plan/240812.png","ImageObject",442,249,{"name":88,"@type":89},"Jake","Person",{"url":68,"name":91,"@type":92},"DocShare","Organization","application/pdf","2026-10-19","2026-09-11",true,{"@type":98,"interactionType":99,"userInteractionCount":25},"InteractionCounter",{"@type":100},"ViewAction",{"@type":102,"mainEntity":103},"FAQPage",[104,110,114],{"name":105,"@type":106,"acceptedAnswer":107},"What parking capacity does the Abbeyquarter plan provide?","Question",{"text":108,"@type":109},"The proposed development provides parking for 7 coaches and 132 car parking spaces.","Answer",{"name":111,"@type":106,"acceptedAnswer":112},"How will vehicles access the temporary car and coach park?",{"text":113,"@type":109},"Access will be from St Francis Bridge and the Central Access Scheme, with a right turning lane provided from the Central Access Scheme into the car park.",{"name":115,"@type":106,"acceptedAnswer":116},"How is surface water runoff and lighting impact managed?",{"text":117,"@type":109},"Surface water runoff will discharge to the River Breagagh using existing outfalls with petrol interceptors, with no new outfalls intended. Lighting changes will limit light spillage onto the River Breagagh to less than 1.0 Lux.","https://schema.org",{"og:url":78,"og:type":120,"og:title":59,"og:site_name":91,"og:description":61},"article",{"robots":122,"canonical":78},"index,follow",{"doc_id":124,"site_id":56},240812,1791716990,{"code":4,"msg":5,"data":127},{"doc_id":124,"user_id":128,"nickname":88,"user_avatar":129,"doc_module":9,"category_id":8,"category_name":11,"doc_title":59,"doc_description":61,"doc_content":130,"file_id":131,"file_url":132,"file_type":133,"file_size":134,"view_count":25,"is_deleted":4,"is_public":9,"is_downloadable":9,"audit_status":9,"page_count":15,"language":135,"language_code":57,"site_id":56,"html_lang":57,"table_of_contents":136,"faqs":137,"seo_title":138,"seo_description":61,"update_tm":139,"read_time":79},962084928904,"https://ap-avatar.wpscdn.com/davatar_155a257f0dc6eb9ab79c44ca47cae57d","Draft Construction Management Plan  \nTemplate  \nProposal to Construct a Temporary Coach & Car Park at Abbeyquarter, Kilkenny  \n| Rev. | Date | Version Details | Author | Reviewed by | Approved by |\n| --- | --- | --- | --- | --- | --- |\n| 0 | 14/05/18 | CMP | Ger O’Donohoe | Tony Lauhoff |  |\n|  |  |  |  |  |  |\n|  |  |  |  |  |  |\n|  |  |  |  |  |  |\n|  |  |  |  |  |  |\n|  |  |  |  |  |  |\n|  |  |  |  |  |  |\n\nTITLE:  \nAbbeyquarter Coach & Car Park  \nConstruction Management Plan  \nLOCATION:  \nThe proposed development is for the construction of a temporary car and coach park in the Abbey Quarter, Kilkenny City (former Smithwicks Brewery site). The site of the proposed development is bounded to the north by St Francis Bridge and to the south by the River Breagagh. The project refers to a civil works project which involves the development of a temporary coach and car park at Abbeyquarter, Kilkenny, see Figure 1.  \nSt Francis Bridge  \nRiver Breagagh  \nFigure 1. Location of the proposed development at Abbeyquarter, Kilkenny.  \nDESCRIPTION OF WORKS  \nThe proposed development will provide parking for 7 no. coaches and 132 car parking spaces.  \nThe car/coach park will be accessed from St Francis Bridge and the Central Access Scheme. A right turning lane will be provided from the Central Access Scheme into the car park.  \nThe existing roadside boundary either side of the proposed entrance will be modified to provide sightlines of 45m in each direction.  \nThe proposed car and coach park will be constructed on top of the existing concrete slab, with the slab to be overlaid with a bituminous layer to provide a level surface.  \nThe north west corner of the site, which is currently lower than the surrounding concrete slab will be raised by approx. 500mm to match the level of the concrete slab. The raised area will be stopped approx. 3 m away from the upstanding wall of the Bull Inn.  \nThe proposed parking area will use the existing drainage system in the concrete yard. There are currently two surface water outfalls to the River Breagagh from this concrete yard, both of which incorporate petrol interceptors. These outfalls will be used to discharge surface water runoff from the car/coach park to the River Breagagh. It is not intended to construct any new outfall as part of the proposed development.  \nThe site of the proposed parking is protected by the Kilkenny Flood Relief Scheme against a 1 in 100-year flood event. This is the same level of protection as provided to the city centre area generally.  \nThe proposed development does not result in the provision of any additional hard standing on the site and thus, surface water runoff from the site will be similar to the existing.  \nThe existing public lighting heads on the Central Access Scheme leading to St Francis Bridge will be modified by way of installing a second lighting head that will be directed into the car/coach park site. New lighting will be provided along the other boundaries of the site. Light spillage onto the adjoining River Breagagh will be limited to less than 1.0 Lux to avoid impact on the River Breagagh.  \nIt is intended that the proposed car and coach park will be used for a period of up to 5 years. Kilkenny County Council is currently looking at development proposals for this site. Should any of these development proposals be progressed within a shorter timeframe than the proposed 5 year period, the car and coach park may operate for a shorter period.  \nSTATEMENT OF WHO WILL CARRY OUT THE WORKS:  \nTo be confirmed. (The works will be either carried out by Kilkenny Co. Co. or by a contractor to be appointed by Kilkenny Co. Co. . )  \nCOMMENCEMENT DATE:  \nTo be confirmed. (Works will be programmed once all approvals are in place.)  \nECOLOGY CONSIDERATIONS:  \nThe project site is located adjacent to the Breagagh River which flows into the River Nore c. 40m from the site (see Figure 2). The River Nore is designated as part of the River Barrow and River Nore SAC (Site Code 00216","cbCaipQN53Y4kWux","https://ap.wps.com/l/cbCaipQN53Y4kWux","pdf",13207839,"English","# Abbeyquarter Coach & Car Park Construction Management Plan\n## Proposal to Construct a Temporary Coach & Car Park\n## Description of Works\n## Statement of Who Will Carry Out the Works\n## Commencement Date\n## Ecology Considerations\n## Construction Management","[{\"question\":\"What parking capacity does the Abbeyquarter plan provide?\",\"answer\":\"The proposed development provides parking for 7 coaches and 132 car parking spaces.\"},{\"question\":\"How will vehicles access the temporary car and coach park?\",\"answer\":\"Access will be from St Francis Bridge and the Central Access Scheme, with a right turning lane provided from the Central Access Scheme into the car park.\"},{\"question\":\"How is surface water runoff and lighting impact managed?\",\"answer\":\"Surface water runoff will discharge to the River Breagagh using existing outfalls with petrol interceptors, with no new outfalls intended. Lighting changes will limit light spillage onto the River Breagagh to less than 1.0 Lux.\"}]","Abbeyquarter Coach & Car Park Construction Management Plan | PDF",1789166065]