[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-1-en-105":3,"doc-seo-243248-105":53,"doc-detail-243248-en":127},{"code":4,"msg":5,"data":6},0,"success",[7,14,19,24,29,34,39,44,49],{"id":8,"doc_module":9,"doc_module_name":10,"category_name":11,"show_sort_weight":12,"slug":13},11,1,"Template","Presentations",90,"presentations",{"id":15,"doc_module":9,"doc_module_name":10,"category_name":16,"show_sort_weight":17,"slug":18},12,"Resumes",80,"resumes",{"id":20,"doc_module":9,"doc_module_name":10,"category_name":21,"show_sort_weight":22,"slug":23},14,"Invoices",70,"invoices",{"id":25,"doc_module":9,"doc_module_name":10,"category_name":26,"show_sort_weight":27,"slug":28},15,"Posters",60,"posters",{"id":30,"doc_module":9,"doc_module_name":10,"category_name":31,"show_sort_weight":32,"slug":33},16,"Social Media",50,"social-media",{"id":35,"doc_module":9,"doc_module_name":10,"category_name":36,"show_sort_weight":37,"slug":38},17,"Forms",40,"forms",{"id":40,"doc_module":9,"doc_module_name":10,"category_name":41,"show_sort_weight":42,"slug":43},18,"Letters",30,"letters",{"id":45,"doc_module":9,"doc_module_name":10,"category_name":46,"show_sort_weight":47,"slug":48},21,"Paper Templates",5,"papers-templates",{"id":50,"doc_module":9,"doc_module_name":10,"category_name":51,"show_sort_weight":4,"slug":52},158,"General","general-158",{"code":4,"msg":54,"data":55},"ok",{"site_id":56,"language":57,"slug":58,"title":59,"keywords":60,"description":61,"schema_data":62,"social_meta":120,"head_meta":122,"extra_data":124,"updated_unix":126},105,"en","a-new-security-building-brkr00906312207-type-b3-100-submittal-volume-i-specifications","A New Security Building BRKR009063/12207 Type B3 (100%) Submittal - Volume I Specifications","","Volume I specifications for a Type B3 (100%) submittal package covering project information, general requirements, existing conditions, concrete, masonry, metals, woods/plastics/composites, thermal and moisture protection, openings, and related scope listings. The table of contents enumerates sections across divisions 00 through 08, including administrative and quality requirements, regulatory and commissioning items, safety and temporary facilities, and detailed trade specifications. Volume II begins with additional divisions for finishes, specialties, equipment, furnishings, and fire suppression and plumbing systems.",{"@graph":63,"@context":119},[64,80,102],{"@type":65,"itemListElement":66},"BreadcrumbList",[67,71,74,77],{"item":68,"name":69,"@type":70,"position":9},"https://docshare.wps.com","Home","ListItem",{"item":72,"name":10,"@type":70,"position":73},"https://docshare.wps.com/template/",2,{"item":75,"name":11,"@type":70,"position":76},"https://docshare.wps.com/template/presentations/",3,{"item":78,"name":59,"@type":70,"position":79},"https://docshare.wps.com/template/a-new-security-building-brkr00906312207-type-b3-100-submittal-volume-i-specifications/243248/",4,{"url":78,"name":59,"@type":81,"image":82,"author":87,"headline":59,"publisher":90,"fileFormat":93,"inLanguage":57,"description":61,"dateModified":94,"datePublished":95,"encodingFormat":93,"isAccessibleForFree":96,"interactionStatistic":97},"DigitalDocument",{"url":83,"@type":84,"width":85,"height":86},"https://docshare.wps.com/thumbnails/a-new-security-building-brkr00906312207-type-b3-100-submittal-volume-i-specifications/243248.png","ImageObject",442,249,{"name":88,"@type":89},"Đào","Person",{"url":68,"name":91,"@type":92},"DocShare","Organization","application/pdf","2026-10-19","2026-09-12",true,{"@type":98,"interactionType":99,"userInteractionCount":101},"InteractionCounter",{"@type":100},"ViewAction",13,{"@type":103,"mainEntity":104},"FAQPage",[105,111,115],{"name":106,"@type":107,"acceptedAnswer":108},"What does Volume I include in the submittal package?","Question",{"text":109,"@type":110},"Volume I lists specifications and required sections for project information, general requirements, existing conditions, and construction divisions 03 through 08, covering major building materials and assemblies.","Answer",{"name":112,"@type":107,"acceptedAnswer":113},"Which general requirements topics are referenced in Volume I?",{"text":114,"@type":110},"The table of contents references administrative requirements, submittals and submittal register, LEED-NC credit summary, security procedures, quality and regulatory requirements, temporary facilities and controls, safety, and general commissioning requirements.",{"name":116,"@type":107,"acceptedAnswer":117},"What building system areas are covered by Divisions 05 to 08 in Volume I?",{"text":118,"@type":110},"Division 05 covers metals, Division 06 covers woods/plastics/composites, Division 07 covers thermal and moisture protection, and Division 08 covers openings such as doors, frames, curtain walls, and related hardware and glazing.","https://schema.org",{"og:url":78,"og:type":121,"og:title":59,"og:site_name":91,"og:description":61},"article",{"robots":123,"canonical":78},"index,follow",{"doc_id":125,"site_id":56},243248,1791717200,{"code":4,"msg":5,"data":128},{"doc_id":125,"user_id":129,"nickname":88,"user_avatar":130,"doc_module":9,"category_id":8,"category_name":11,"doc_title":59,"doc_description":61,"doc_content":131,"file_id":132,"file_url":133,"file_type":134,"file_size":135,"view_count":101,"is_deleted":4,"is_public":9,"is_downloadable":9,"audit_status":9,"page_count":136,"language":137,"language_code":57,"site_id":56,"html_lang":57,"table_of_contents":138,"faqs":139,"seo_title":140,"seo_description":61,"update_tm":141,"read_time":142},1374402968488,"https://ap-avatar.wpscdn.com/davatar_29158cc5080c5b710cf443261637dec0","Volume I Specifications  \nfor the  \nA New Security Building  \nat  \n Birmingham IAP (ANG)   \nBirmingham, Alabama  \nType B3 (100%) Submittal – Volume I  \nDate: June 2024  \nJob No: 12072/BRKR 009063  \nSet No:  \nDavid  \nDonovan  \nDigitally signed by David Donovan DN: cn=David Donovan, o=SS&L, ou=SS&L, [email=ddonovan@sslarch.com](email=ddonovan@sslarch.com), c=US  \nDate: 2024.06.20 21:27:58-05'00'  \nA New Security Building BRKR009063/12207 Type B3 (100%) Submittal 117th Air Refueling Wing, Birmingham, AL June 2024  \nSECTION 00 0100 – TABLE OF CONTENTS  \nVOLUME I  \nDIVISION 00 – PROJECT INFORMATION  \n00 0100 TABLE OF CONTENTS 6  \n00 0102 PROJECT INFORMATION AND SUMMARY 8  \nDIVISION 01 – GENERAL REQUIREMENTS  \n01 0450 CUTTING AND PATCHING 5  \n01 0500 FIELD ENGINEERING 3  \n01 2000 PRICE AND PAYMENT PROCEDURES 4  \n01 2300 BID OPTIONS 4  \n01 3000 ADMINISTRATIVE REQUIREMENTS 10  \n01 3001 SUBMITTALS 7  \n- SUBMITTAL REGISTER 23  \n01 3514.01 LEED-NC 2009 CREDIT SUMMARY 8  \n01 3553 SECURITY PROCEDURES 2  \n01 4000 QUALITY REQUIREMENTS 7  \n01 4100 REGULATORY REQUIREMENTS 3  \n01 4217 DEFINITIONS AND STANDARDS 3  \n01 5000 TEMPORARY FACILITIES AND CONTROLS 4  \n01 5100 TEMPORARY UTILITIES 3  \n01 5213 FIELD OFFICES AND SHEDS 2  \n01 5460 SAFETY AND HEALTH 5  \n01 5500 VEHICULAR ACCESS AND PARKING 3  \n01 5719 TEMPORARY ENVIRONMENTAL CONTROLS 9  \n01 6000 PRODUCT REQUIREMENTS 9  \n01 6116 VOLATILE ORGANIC COMPOUND CONTENT RESTRICTIONS 6  \n01 7000 EXECUTION AND CLOSEOUT REQUIREMENTS 9  \n01 7419 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL 6  \n01 7800 CLOSEOUT SUBMITTALS 7  \n01 7900 DEMONSTRATION AND TRAINING 5  \n01 9113 GENERAL COMMISSIONING REQUIREMENTS 15  \nDIVISION 02 – EXISTING CONDITIONS  \n02 4100 DEMOLITION 5  \n02 7110 FOUNDATION DRAINAGE SYSTEMS 7  \nDIVISION 03 – CONCRETE  \n03 3000 CAST-IN-PLACE CONCRETE 30  \nDIVISION 04 – MASONRY  \n04 2000 UNIT MASONRY 15  \n04 7200 CAST STONE MASONRY 8  \nA New Security Building BRKR009063/12207 Type B3 (100%) Submittal  \n117th Air Refueling Wing, Birmingham, AL June 2024  \nDIVISION 05 – METALS  \n05 1200 STRUCTURAL STEEL FRAMING 8  \n05 2100 STEEL JOIST FRAMING 5  \n05 3100 STEEL DECKING 7  \n05 4000 COLD-FORMED METAL FRAMING 7  \n05 4400 COLD-FORMED METAL TRUSSES 7  \n05 5000 METAL FABRICATIONS 10  \n05 5213 PIPE AND TUBE RAILINGS 5  \nDIVISION 06 – WOODS, PLASTICS, AND COMPOSITES  \n06 1000 ROUGH CARPENTRY 8  \n06 4100 ARCHITECTURAL WOOD CASEWORK 7  \n06 8316 FIBERGLASS REINFORCED PANELING 4  \nDIVISION 07 – THERMAL & MOISTURE PROTECTION  \n070100 SPECIAL PROJECT ROOFING WARRANTY 3  \n07 2100 THERMAL INSULATION 6  \n07 2119 SPRAY FOAM INSULATION 6  \n07 2500 WEATHER BARRIERS 16  \n07 4113 METAL ROOF PANELS 14  \n07 4213 RIBBED METAL WALL PANELS 10  \n07 4293 METAL SOFFIT PANELS 8  \n07 4800 CONTINUOUS INSULATION CHANNELS 9  \n07 6200 SHEET METAL FLASHING AND TRIM 7  \n07 6500 WALL FLASHING 8  \n07 7100 ROOF SPECIALTIES 10  \n07 9005 JOINT SEALERS 12  \nDIVISION 08 – OPENINGS  \n08 1113 HOLLOW METAL DOORS AND FRAMES 15  \n08 1416 FLUSH WOOD DOORS 6  \n08 3100 ACCESS DOORS AND PANELS 4  \n08 3459 WEAPONS VAULT DOOR 6  \n08 3600 SECTIONAL OVERHEAD DOORS 4  \n08 4113 ALUMINUM-FRAMED ENTRANCES 9  \n08 4413 GLAZED ALUMINUM CURTAIN WALLS 11  \n08 5200 BLAST RESISTANT ALUMINUM WINDOW SYSTEMS 15  \n08 7100 DOOR HARDWARE 18  \n08 8000 GLAZING 7  \nA New Security Building BRKR009063/12207 Type B3 (100%) Submittal  \n117th Air Refueling Wing, Birmingham, AL June 2024  \nVOLUME II  \nDIVISION 00 – PROJECT INFORMATION  \n00 0100 TABLE OF CONTENTS 6  \nDIVISION 09 – FINISHES  \n09 0561 COMMON WORK RESULTS FOR FLOORING PREPARATION 8  \n09 2116 GYPSUM BOARD ASSEMBLIES 10  \n09 3000 TILING 12  \n09 5100 ACOUSTICAL CEILINGS 8  \n09 6500 RESILIENT BASE 5  \n09 6519 RESILIENT TILE FLOORING 10  \n09 6813 TILE CARPETING 5  \n09 9113 EXTERIOR PAINTING 8  \n09 9123 INTERIOR PAINTING 13  \nDIVISIONS 10 – SPECIALTIES  \n10 1400 SIGNAGE 5  \n10 2113 STAINLESS STEELTOILET COMPARTMENTS 8  \n10 2800 TOILET, BATH, AND LAUNDRY ACCESSORIES 10  \n10 4400 FIRE PROTECTION SPECIALTIES 3  \n10 8500 SPECIAL","cbCaicUntElO0ADo","https://ap.wps.com/l/cbCaicUntElO0ADo","pdf",2485039,546,"English","# SECTION 00 0100 - TABLE OF CONTENTS\n## VOLUME I\n## DIVISION 00 - PROJECT INFORMATION\n### 00 0100 TABLE OF CONTENTS\n### 00 0102 PROJECT INFORMATION AND SUMMARY\n## DIVISION 01 - GENERAL REQUIREMENTS\n### 01 0450 CUTTING AND PATCHING\n### 01 0500 FIELD ENGINEERING\n### 01 2000 PRICE AND PAYMENT PROCEDURES\n### 01 2300 BID OPTIONS\n### 01 3000 ADMINISTRATIVE REQUIREMENTS\n### 01 3001 SUBMITTALS\n### 01 3514.01 LEED-NC 2009 CREDIT SUMMARY\n### 01 3553 SECURITY PROCEDURES\n### 01 4000 QUALITY REQUIREMENTS\n### 01 4100 REGULATORY REQUIREMENTS\n### 01 4217 DEFINITIONS AND STANDARDS\n### 01 5000 TEMPORARY FACILITIES AND CONTROLS\n### 01 5100 TEMPORARY UTILITIES\n### 01 5213 FIELD OFFICES AND SHEDS\n### 01 5460 SAFETY AND HEALTH\n### 01 5500 VEHICULAR ACCESS AND PARKING\n### 01 5719 TEMPORARY ENVIRONMENTAL CONTROLS\n### 01 6000 PRODUCT REQUIREMENTS\n### 01 6116 VOLATILE ORGANIC COMPOUND CONTENT RESTRICTIONS\n### 01 7000 EXECUTION AND CLOSEOUT REQUIREMENTS\n### 01 7419 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL\n### 01 7800 CLOSEOUT SUBMITTALS\n### 01 7900 DEMONSTRATION AND TRAINING\n### 01 9113 GENERAL COMMISSIONING REQUIREMENTS\n## DIVISION 02 - EXISTING CONDITIONS\n### 02 4100 DEMOLITION\n### 02 7110 FOUNDATION DRAINAGE SYSTEMS\n## DIVISION 03 - CONCRETE\n### 03 3000 CAST-IN-PLACE CONCRETE\n## DIVISION 04 - MASONRY\n### 04 2000 UNIT MASONRY\n### 04 7200 CAST STONE MASONRY\n## DIVISION 05 - METALS\n### 05 1200 STRUCTURAL STEEL FRAMING\n### 05 2100 STEEL JOIST FRAMING\n### 05 3100 STEEL DECKING\n### 05 4000 COLD-FORMED METAL FRAMING\n### 05 4400 COLD-FORMED METAL TRUSSES\n### 05 5000 METAL FABRICATIONS\n### 05 5213 PIPE AND TUBE RAILINGS\n## DIVISION 06 - WOODS, PLASTICS, AND COMPOSITES\n### 06 1000 ROUGH CARPENTRY\n### 06 4100 ARCHITECTURAL WOOD CASEWORK\n### 06 8316 FIBERGLASS REINFORCED PANELING\n## DIVISION 07 - THERMAL & MOISTURE PROTECTION\n### 070100 SPECIAL PROJECT ROOFING WARRANTY\n### 07 2100 THERMAL INSULATION\n### 07 2119 SPRAY FOAM INSULATION\n### 07 2500 WEATHER BARRIERS\n### 07 4113 METAL ROOF PANELS\n### 07 4213 RIBBED METAL WALL PANELS\n### 07 4293 METAL SOFFIT PANELS\n### 07 4800 CONTINUOUS INSULATION CHANNELS\n### 07 6200 SHEET METAL FLASHING AND TRIM\n### 07 6500 WALL FLASHING\n### 07 7100 ROOF SPECIALTIES\n### 07 9005 JOINT SEALERS\n## DIVISION 08 - OPENINGS\n### 08 1113 HOLLOW METAL DOORS AND FRAMES\n### 08 1416 FLUSH WOOD DOORS\n### 08 3100 ACCESS DOORS AND PANELS\n### 08 3459 WEAPONS VAULT DOOR\n### 08 3600 SECTIONAL OVERHEAD DOORS\n### 08 4113 ALUMINUM-FRAMED ENTRANCES\n### 08 4413 GLAZED ALUMINUM CURTAIN WALLS\n### 08 5200 BLAST RESISTANT ALUMINUM WINDOW SYSTEMS\n### 08 7100 DOOR HARDWARE\n### 08 8000 GLAZING","[{\"question\":\"What does Volume I include in the submittal package?\",\"answer\":\"Volume I lists specifications and required sections for project information, general requirements, existing conditions, and construction divisions 03 through 08, covering major building materials and assemblies.\"},{\"question\":\"Which general requirements topics are referenced in Volume I?\",\"answer\":\"The table of contents references administrative requirements, submittals and submittal register, LEED-NC credit summary, security procedures, quality and regulatory requirements, temporary facilities and controls, safety, and general commissioning requirements.\"},{\"question\":\"What building system areas are covered by Divisions 05 to 08 in Volume I?\",\"answer\":\"Division 05 covers metals, Division 06 covers woods/plastics/composites, Division 07 covers thermal and moisture protection, and Division 08 covers openings such as doors, frames, curtain walls, and related hardware and glazing.\"}]","A New Security Building BRKR009063/12207 Type B3 (100%) Submittal - Volume I Specifications | PDF",1789201865,191]