[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-1-en-105":3,"doc-seo-239354-105":53,"doc-detail-239354-en":127},{"code":4,"msg":5,"data":6},0,"success",[7,14,19,24,29,34,39,44,49],{"id":8,"doc_module":9,"doc_module_name":10,"category_name":11,"show_sort_weight":12,"slug":13},11,1,"Template","Presentations",90,"presentations",{"id":15,"doc_module":9,"doc_module_name":10,"category_name":16,"show_sort_weight":17,"slug":18},12,"Resumes",80,"resumes",{"id":20,"doc_module":9,"doc_module_name":10,"category_name":21,"show_sort_weight":22,"slug":23},14,"Invoices",70,"invoices",{"id":25,"doc_module":9,"doc_module_name":10,"category_name":26,"show_sort_weight":27,"slug":28},15,"Posters",60,"posters",{"id":30,"doc_module":9,"doc_module_name":10,"category_name":31,"show_sort_weight":32,"slug":33},16,"Social Media",50,"social-media",{"id":35,"doc_module":9,"doc_module_name":10,"category_name":36,"show_sort_weight":37,"slug":38},17,"Forms",40,"forms",{"id":40,"doc_module":9,"doc_module_name":10,"category_name":41,"show_sort_weight":42,"slug":43},18,"Letters",30,"letters",{"id":45,"doc_module":9,"doc_module_name":10,"category_name":46,"show_sort_weight":47,"slug":48},21,"Paper Templates",5,"papers-templates",{"id":50,"doc_module":9,"doc_module_name":10,"category_name":51,"show_sort_weight":4,"slug":52},158,"General","general-158",{"code":4,"msg":54,"data":55},"ok",{"site_id":56,"language":57,"slug":58,"title":59,"keywords":60,"description":61,"schema_data":62,"social_meta":120,"head_meta":122,"extra_data":124,"updated_unix":126},105,"en","7-waste-gemba-walk-template","7 Waste Gemba Walk Template","","This document is a 7 Waste Gemba Walk Template from LeanVlog, designed for observing and documenting manufacturing or operational inefficiencies. The template provides a structured format to record observed 'wastes' (muda) according to the Lean methodology, including Inventory, Motion, Overprocessing, Transport, Waiting, Overproduction, and Defects. For each identified waste, it allows for the specification of the affected Process Step, a Description of the issue, and an Estimated Impact in terms of cost or time. Specific examples are provided, such as '10 Coils @ Raw Material' for Inventory waste with an estimated impact of $100k, and 'Tools far from workstation' for Motion waste with an estimated impact of 200m/day. The template also includes fields for Company, SKU, Observer, and Date to contextualize the Gemba walk. Additional notes can be added to capture further observations or context. The document is a practical tool for identifying and analyzing waste in a Gemba, which is the actual place where work is done, to drive continuous improvement processes.",{"@graph":63,"@context":119},[64,80,102],{"@type":65,"itemListElement":66},"BreadcrumbList",[67,71,74,77],{"item":68,"name":69,"@type":70,"position":9},"https://docshare.wps.com","Home","ListItem",{"item":72,"name":10,"@type":70,"position":73},"https://docshare.wps.com/template/",2,{"item":75,"name":36,"@type":70,"position":76},"https://docshare.wps.com/template/forms/",3,{"item":78,"name":59,"@type":70,"position":79},"https://docshare.wps.com/template/7-waste-gemba-walk-template/239354/",4,{"url":78,"name":59,"@type":81,"image":82,"author":87,"headline":59,"publisher":90,"fileFormat":93,"inLanguage":57,"description":61,"dateModified":94,"datePublished":95,"encodingFormat":93,"isAccessibleForFree":96,"interactionStatistic":97},"DigitalDocument",{"url":83,"@type":84,"width":85,"height":86},"https://docshare.wps.com/thumbnails/7-waste-gemba-walk-template/239354.png","ImageObject",442,249,{"name":88,"@type":89},"Connor ","Person",{"url":68,"name":91,"@type":92},"DocShare","Organization","application/pdf","2026-10-31","2026-09-11",true,{"@type":98,"interactionType":99,"userInteractionCount":101},"InteractionCounter",{"@type":100},"ViewAction",10,{"@type":103,"mainEntity":104},"FAQPage",[105,111,115],{"name":106,"@type":107,"acceptedAnswer":108},"What is the purpose of the 7 Waste Gemba Walk Template?","Question",{"text":109,"@type":110},"The template is used to systematically identify and document the seven types of waste (muda) in a Gemba, which is the actual place where work occurs, to facilitate process improvement.","Answer",{"name":112,"@type":107,"acceptedAnswer":113},"What are the seven wastes listed in the template?",{"text":114,"@type":110},"The seven wastes identified are Inventory, Motion, Overprocessing, Transport, Waiting, Overproduction, and Defects.",{"name":116,"@type":107,"acceptedAnswer":117},"How is the impact of observed waste recorded?",{"text":118,"@type":110},"The template has a column for 'Impact Estimated' where the financial or time-related consequences of each observed waste can be quantified, such as $100k for inventory or 200m/day for motion.","https://schema.org",{"og:url":78,"og:type":121,"og:title":59,"og:site_name":91,"og:description":61},"article",{"robots":123,"canonical":78},"index,follow",{"doc_id":125,"site_id":56},239354,1790459847,{"code":4,"msg":5,"data":128},{"doc_id":125,"user_id":129,"nickname":88,"user_avatar":130,"doc_module":9,"category_id":35,"category_name":36,"doc_title":59,"doc_description":61,"doc_content":131,"file_id":132,"file_url":133,"file_type":134,"file_size":135,"view_count":101,"is_deleted":4,"is_public":9,"is_downloadable":9,"audit_status":9,"page_count":9,"language":136,"language_code":57,"site_id":56,"html_lang":57,"table_of_contents":137,"faqs":138,"seo_title":139,"seo_description":61,"update_tm":140,"read_time":4},687207022233,"https://ap-avatar.wpscdn.com/davatar_155a257f0dc6eb9ab79c44ca47cae57d","[www.leanvlog.com](www.leanvlog.com)  \n7 Waste Gemba Walk Template  \n\n| Company: | ACME | SKU: | 123453 |\n| --- | --- | --- | --- |\n| Observer: | J. Smith | Date: | 27 Nov 19 |\n|  |  |  |  |\n| Waste Observed | Process Step | Description | Impact Estimated |\n| Inventory | 10-Machining | 10 Coils @ Raw Material | 100k$ |\n| Motion | 10-Machining | Tools far from workstation | 200m / day |\n| Overprocessing | 20-Welding | 3 Piece at rework stage | 4 Hours wastes |\n| Transport | 30-Adjusting | The Adjusting is far from welding | 300 m / Day |\n| Waiting | 40-Painting | 10 hours waited to change colors | 50k$ of material waiting |\n| Overproduction | 50-Washing | 50 pieces produced even if 10 pieces/day can be processed |  |\n| Defects | 60-Milling | 10 pieces of scrap identiﬁed |  |\n|  |  |  |  |\n|  |  |  |  |\n|  |  |  |  |\n|  |  |  |  |\n|  |  |  |  |\n|  |  |  |  |\n|  |  |  |  |\n|  |  |  |  |\n|  |  |  |  |\n\nOther Notes:  \n7 Waste Gemba Walk Template  [www.leanvlog.com](www.leanvlog.com)","cbCaioZv9CgZdpTF","https://ap.wps.com/l/cbCaioZv9CgZdpTF","pdf",66825,"English","# 7 Waste Gemba Walk Template\n## Waste Observed\n### Inventory\n### Motion\n### Overprocessing\n### Transport\n### Waiting\n### Overproduction\n### Defects","[{\"question\":\"What is the purpose of the 7 Waste Gemba Walk Template?\",\"answer\":\"The template is used to systematically identify and document the seven types of waste (muda) in a Gemba, which is the actual place where work occurs, to facilitate process improvement.\"},{\"question\":\"What are the seven wastes listed in the template?\",\"answer\":\"The seven wastes identified are Inventory, Motion, Overprocessing, Transport, Waiting, Overproduction, and Defects.\"},{\"question\":\"How is the impact of observed waste recorded?\",\"answer\":\"The template has a column for 'Impact Estimated' where the financial or time-related consequences of each observed waste can be quantified, such as $100k for inventory or 200m/day for motion.\"}]","7 Waste Gemba Walk Template | PDF",1789147539]