[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-1-en-105":3,"doc-seo-392429-105":53,"doc-detail-392429-en":126},{"code":4,"msg":5,"data":6},0,"success",[7,14,19,24,29,34,39,44,49],{"id":8,"doc_module":9,"doc_module_name":10,"category_name":11,"show_sort_weight":12,"slug":13},11,1,"Template","Presentations",90,"presentations",{"id":15,"doc_module":9,"doc_module_name":10,"category_name":16,"show_sort_weight":17,"slug":18},12,"Resumes",80,"resumes",{"id":20,"doc_module":9,"doc_module_name":10,"category_name":21,"show_sort_weight":22,"slug":23},14,"Invoices",70,"invoices",{"id":25,"doc_module":9,"doc_module_name":10,"category_name":26,"show_sort_weight":27,"slug":28},15,"Posters",60,"posters",{"id":30,"doc_module":9,"doc_module_name":10,"category_name":31,"show_sort_weight":32,"slug":33},16,"Social Media",50,"social-media",{"id":35,"doc_module":9,"doc_module_name":10,"category_name":36,"show_sort_weight":37,"slug":38},17,"Forms",40,"forms",{"id":40,"doc_module":9,"doc_module_name":10,"category_name":41,"show_sort_weight":42,"slug":43},18,"Letters",30,"letters",{"id":45,"doc_module":9,"doc_module_name":10,"category_name":46,"show_sort_weight":47,"slug":48},21,"Paper Templates",5,"papers-templates",{"id":50,"doc_module":9,"doc_module_name":10,"category_name":51,"show_sort_weight":4,"slug":52},158,"General","general-158",{"code":4,"msg":54,"data":55},"ok",{"site_id":56,"language":57,"slug":58,"title":59,"keywords":60,"description":61,"schema_data":62,"social_meta":119,"head_meta":121,"extra_data":123,"updated_unix":125},105,"en","2-team-fixed-12-hour-shift-schedule-instructions","2 Team Fixed - 12 Hour Shift Schedule - Instructions","","2 Team Fixed 12 Hour Shift Schedule template instructions explain how to set up a two-team, 12-hour day/night shift arrangement to support continuous 24/7 operations with limited staff. The workflow covers selecting a fixed clocking schedule, entering schedule numbers and descriptions for Team A and Team B, configuring start/end times and related attendance parameters, then submitting the schedules. It also describes creating a group duty roster, assigning users, and applying an effective date, with rules on cyclical scheduling and overtime limits.",{"@graph":63,"@context":118},[64,80,101],{"@type":65,"itemListElement":66},"BreadcrumbList",[67,71,74,77],{"item":68,"name":69,"@type":70,"position":9},"https://docshare.wps.com","Home","ListItem",{"item":72,"name":10,"@type":70,"position":73},"https://docshare.wps.com/template/",2,{"item":75,"name":11,"@type":70,"position":76},"https://docshare.wps.com/template/presentations/",3,{"item":78,"name":59,"@type":70,"position":79},"https://docshare.wps.com/template/2-team-fixed-12-hour-shift-schedule-instructions/392429/",4,{"url":78,"name":59,"@type":81,"image":82,"author":87,"headline":59,"publisher":90,"fileFormat":93,"inLanguage":57,"description":61,"dateModified":94,"datePublished":95,"encodingFormat":93,"isAccessibleForFree":96,"interactionStatistic":97},"DigitalDocument",{"url":83,"@type":84,"width":85,"height":86},"https://docshare.wps.com/thumbnails/2-team-fixed-12-hour-shift-schedule-instructions/392429.png","ImageObject",442,249,{"name":88,"@type":89},"Miles","Person",{"url":68,"name":91,"@type":92},"DocShare","Organization","application/pdf","2026-10-27","2026-09-25",true,{"@type":98,"interactionType":99,"userInteractionCount":8},"InteractionCounter",{"@type":100},"ViewAction",{"@type":102,"mainEntity":103},"FAQPage",[104,110,114],{"name":105,"@type":106,"acceptedAnswer":107},"What is the purpose of the 2 Team Fixed 12 Hour Shift Schedule?","Question",{"text":108,"@type":109},"It is designed to cover around-the-clock operations using limited personnel, with one team working 12-hour shifts during the day and another working 12-hour shifts at night.","Answer",{"name":111,"@type":106,"acceptedAnswer":112},"How should Team A and Team B time ranges be set?",{"text":113,"@type":109},"Team A should start at 7am and end at 7pm (12 hours). Team B should start at 7pm and end at 7am (12 hours).",{"name":115,"@type":106,"acceptedAnswer":116},"What rules and limitations apply to this plan?",{"text":117,"@type":109},"The schedule is cyclical over 1 day and requires an average of 44 overtime hours per employee per week, with an average of 84 hours per week. Due to long working hours and no days off, it should be used only for extreme cases when only two teams are available for 24/7 duties.","https://schema.org",{"og:url":78,"og:type":120,"og:title":59,"og:site_name":91,"og:description":61},"article",{"robots":122,"canonical":78},"index,follow",{"doc_id":124,"site_id":56},392429,1791741238,{"code":4,"msg":5,"data":127},{"doc_id":124,"user_id":128,"nickname":88,"user_avatar":129,"doc_module":9,"category_id":8,"category_name":11,"doc_title":59,"doc_description":61,"doc_content":130,"file_id":131,"file_url":132,"file_type":133,"file_size":134,"view_count":8,"is_deleted":4,"is_public":9,"is_downloadable":9,"audit_status":9,"page_count":79,"language":135,"language_code":57,"site_id":56,"html_lang":57,"table_of_contents":136,"faqs":137,"seo_title":138,"seo_description":61,"update_tm":139,"read_time":73},13056703019404,"https://ap-avatar.wpscdn.com/davatar_29158cc5080c5b710cf443261637dec0","2 Team Fixed 12 Hour Shift Schedule  \nPROCESS  \nStep 1: Select Clocking Schedule under the Schedule tab.  \nDESCRIPTION  \n2 Team of workers working 12-hr shift during the day and another team working 12-hr shift at night  \nOBJECTIVE  \nTo cater to around the clock operations with limited personnel.  \nRULES  \n• Cyclical 1 day  \n• Requires an average of 44 overtime hours per  \nemployee per week • Average hour per week is 84  \nNote: The long working hours and the absence of days off, this plan shouldn’t be considered except for extreme cases where only 2 teams are available to cover 24/7 duties.  \nStep 2: Click Add icon on the right corner of the page.  \n[www.timeteccloud.com](www.timeteccloud.com) Clocking Schedule Templates • Fixed Schedule | 01  \nStep 3: 1. Fill up the Schedule No for example 71  \n2. Describe the schedule: 2 Team Fixed 12 Hour Shift Schedule forTeam A  \n3. Select Schedule Type: Daily  \n4. Set the time: Start at 7am and end at 7pm – 12 hours  \n5. Make sure you properly select the other fields like Range, General, Rounding and etc, based on your company’s attendance’s rules and policies.  \n6. Repeat the steps forTeam B  \n7. Give another Schedule No: 72  \n8. The time forTeam B, 2 Team Fixed 12 Hour Shift Schedule will start at 7pm and done at 7am  \n9. Submit the Schedule.  \n[www.timeteccloud.com](www.timeteccloud.com) Clocking Schedule Templates • Fixed Schedule | 02  \nStep 4: Now that the clocking schedules for 2 Team Fixed 12 Hour Shift Schedule have been established, let’s proceed to the Group Duty Roster where you apply this daily schedule to a working yearly calendar.  \nUnder Schedule tab select Assign Users to Duty Roster.  \nClick button Add to add the new 2 Team Fixed 12 Hour Shift Schedule to a new Group Duty Roster.  \nStep 5: 1. Fill up Group No – Put any number for example 71.  \n2. Describe the Duty Group  \n3. Select Group Type: Shift  \n4. Select Auto and the Auto Schedule Assistant will appear as below.  \n[www.timeteccloud.com](www.timeteccloud.com) Clocking Schedule Templates • Fixed Schedule | 03  \n5. Select your Effective Date to start the schedule and click Apply. Your Duty Group will look like the one below:  \nTeam A Duty Roster  \nCopyright © 2015 Timetec Computing Sdn. Bhd. All rights reserved • 082015 Clocking Schedule Templates • Fixed Schedule | 04","cbCaiflQEA0TrhJL","https://ap.wps.com/l/cbCaiflQEA0TrhJL","pdf",1111846,"English","# Setup the Clocking Schedule\n## Select and configure Team A\n## Configure Team B and submit\n# Build the Group Duty Roster\n## Assign users and apply effective date\n# Scheduling Rules and Notes","[{\"question\":\"What is the purpose of the 2 Team Fixed 12 Hour Shift Schedule?\",\"answer\":\"It is designed to cover around-the-clock operations using limited personnel, with one team working 12-hour shifts during the day and another working 12-hour shifts at night.\"},{\"question\":\"How should Team A and Team B time ranges be set?\",\"answer\":\"Team A should start at 7am and end at 7pm (12 hours). Team B should start at 7pm and end at 7am (12 hours).\"},{\"question\":\"What rules and limitations apply to this plan?\",\"answer\":\"The schedule is cyclical over 1 day and requires an average of 44 overtime hours per employee per week, with an average of 84 hours per week. Due to long working hours and no days off, it should be used only for extreme cases when only two teams are available for 24/7 duties.\"}]","2 Team Fixed - 12 Hour Shift Schedule - Instructions | PDF",1790369536]