[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-1-en-105":3,"doc-seo-246022-105":53,"doc-detail-246022-en":127},{"code":4,"msg":5,"data":6},0,"success",[7,14,19,24,29,34,39,44,49],{"id":8,"doc_module":9,"doc_module_name":10,"category_name":11,"show_sort_weight":12,"slug":13},11,1,"Template","Presentations",90,"presentations",{"id":15,"doc_module":9,"doc_module_name":10,"category_name":16,"show_sort_weight":17,"slug":18},12,"Resumes",80,"resumes",{"id":20,"doc_module":9,"doc_module_name":10,"category_name":21,"show_sort_weight":22,"slug":23},14,"Invoices",70,"invoices",{"id":25,"doc_module":9,"doc_module_name":10,"category_name":26,"show_sort_weight":27,"slug":28},15,"Posters",60,"posters",{"id":30,"doc_module":9,"doc_module_name":10,"category_name":31,"show_sort_weight":32,"slug":33},16,"Social Media",50,"social-media",{"id":35,"doc_module":9,"doc_module_name":10,"category_name":36,"show_sort_weight":37,"slug":38},17,"Forms",40,"forms",{"id":40,"doc_module":9,"doc_module_name":10,"category_name":41,"show_sort_weight":42,"slug":43},18,"Letters",30,"letters",{"id":45,"doc_module":9,"doc_module_name":10,"category_name":46,"show_sort_weight":47,"slug":48},21,"Paper Templates",5,"papers-templates",{"id":50,"doc_module":9,"doc_module_name":10,"category_name":51,"show_sort_weight":4,"slug":52},158,"General","general-158",{"code":4,"msg":54,"data":55},"ok",{"site_id":56,"language":57,"slug":58,"title":59,"keywords":60,"description":61,"schema_data":62,"social_meta":120,"head_meta":122,"extra_data":124,"updated_unix":126},105,"en","170120-cc-swms-01-r8-general-lifting-template","170120-CC-SWMS-01-R8-General-Lifting-Template","","Comprehensive safe work method statement template for lifting activities, capturing key project details, scope, and high-risk work triggers to ensure compliance. Includes mandatory PPE and task-specific equipment requirements, personnel qualifications, safety and emergency provisions, and hazardous substances fields. Provides a structured risk assessment framework using a likelihood–consequence matrix, plus risk tolerability levels (high/medium/low). Contains a step-by-step job breakdown with hazards, untreated and residual risk ratings, and control measures aligned to the hierarchy of controls.",{"@graph":63,"@context":119},[64,80,102],{"@type":65,"itemListElement":66},"BreadcrumbList",[67,71,74,77],{"item":68,"name":69,"@type":70,"position":9},"https://docshare.wps.com","Home","ListItem",{"item":72,"name":10,"@type":70,"position":73},"https://docshare.wps.com/template/",2,{"item":75,"name":36,"@type":70,"position":76},"https://docshare.wps.com/template/forms/",3,{"item":78,"name":59,"@type":70,"position":79},"https://docshare.wps.com/template/170120-cc-swms-01-r8-general-lifting-template/246022/",4,{"url":78,"name":59,"@type":81,"image":82,"author":87,"headline":59,"publisher":90,"fileFormat":93,"inLanguage":57,"description":61,"dateModified":94,"datePublished":95,"encodingFormat":93,"isAccessibleForFree":96,"interactionStatistic":97},"DigitalDocument",{"url":83,"@type":84,"width":85,"height":86},"https://docshare.wps.com/thumbnails/170120-cc-swms-01-r8-general-lifting-template/246022.png","ImageObject",442,249,{"name":88,"@type":89},"Anda","Person",{"url":68,"name":91,"@type":92},"DocShare","Organization","application/pdf","2026-10-22","2026-09-12",true,{"@type":98,"interactionType":99,"userInteractionCount":101},"InteractionCounter",{"@type":100},"ViewAction",9,{"@type":103,"mainEntity":104},"FAQPage",[105,111,115],{"name":106,"@type":107,"acceptedAnswer":108},"What project information fields does the SWMS template require?","Question",{"text":109,"@type":110},"It collects fields such as Project Name, Project Address, Commencement Date, Duration of Works, and the Date Provided to the Principal Contractor.","Answer",{"name":112,"@type":107,"acceptedAnswer":113},"How does the template define and record high-risk work?",{"text":114,"@type":110},"It provides a checklist of high risk construction activities (e.g., work near energised electrical installations, falls over 2 metres, confined spaces, asbestos removal, demolition of load-bearing structures) for indication and selection.",{"name":116,"@type":107,"acceptedAnswer":117},"What PPE and safety equipment sections are included?",{"text":118,"@type":110},"The template lists mandatory PPE (uniform, hi vis, footwear, hard hat, eyewear, gloves, hearing protection, dust mask, fall arrest, and other) plus task-specific PPE, along with safety and emergency equipment and a hazardous substances section.","https://schema.org",{"og:url":78,"og:type":121,"og:title":59,"og:site_name":91,"og:description":61},"article",{"robots":123,"canonical":78},"index,follow",{"doc_id":125,"site_id":56},246022,1789232812,{"code":4,"msg":5,"data":128},{"doc_id":125,"user_id":129,"nickname":88,"user_avatar":130,"doc_module":9,"category_id":35,"category_name":36,"doc_title":59,"doc_description":61,"doc_content":131,"file_id":132,"file_url":133,"file_type":134,"file_size":135,"view_count":101,"is_deleted":4,"is_public":9,"is_downloadable":9,"audit_status":9,"page_count":35,"language":136,"language_code":57,"site_id":56,"html_lang":57,"table_of_contents":137,"faqs":138,"seo_title":139,"seo_description":61,"update_tm":126,"read_time":140},962075006959,"https://ap-avatar.wpscdn.com/avatar/e0002397efbe92a78e?_k=1776741047341049297","| Principle Contractor: | Date Provided to Principle Contractor: |\n| --- | --- |\n| Project Name: | Project Address: |\n| Commencement Date: | Duration of Works: |\n\n\n| High Risk Work: (Indicate 􀀹 high risk construction work associated with the activity/task) |  |  |  |  |  |\n| --- | --- | --- | --- | --- | --- |\n| ☐ | On or near energised electrical installations or services | ☐ | Working around powered mobile plant | ☐ | Risk of falls from greater than 2 metres |\n| ☐ | In trenches/shafts deeper than 1.5 metres | ☐ | Temporary support for structural alterations | ☐ | On, in or adjacent to road, rail shipping or other major traffic corridor |\n| ☐ | In or near a confined space | ☐ | Removal/ disturbance of asbestos | ☐ | On a telecommunication tower |\n| ☐ | In an area with contaminated\u003Cbr>or flammable atmosphere | ☐ | With dangerous goods or substances | ☐ | On or near pressurised gas distribution mains or piping |\n| ☐ | Demolitions of load-bearing\u003Cbr>structures | ☐ | Work involving tilt up/pre-cast concrete | ☐ | Work that involves explosives |\n\nPPE, safety & emergency equipment and hazardous substances required for this task:  \n\n| Mandatory PPE |  |  |  | Task Specific PPE |  |  |  |  |  |\n| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |\n| Uniform | Hi Vis | Footwear | Hard Hat | Eyewear | W/Gloves | Hearing | Dust Mask | Fall Arrest | Other |\n| | | | | | | | | |  |\n| Additional Task Specific PPE (Please list) |  |  |  |  |  |  |  |  |  |\n\n\n| Qualifications / Competencies | Plant & Equipment |\n| --- | --- |\n| ☒Health Safety Induction Card | ☐AT20 Franna (20T) |\n| ☒Asbestos Awareness Training | ☐MAC 25T Franna (25T) |\n| ☐ActewAGL Apply Electrical | ☐KRM-13H (13t) |\n| Safety Rules (The Blue Book) | ☐LTM 1040-2.1 (40t) |\n| ☐Crane Licenses;C0, C1, C6, C2, | ☐LTM1060-3.1 (60T) |\n| CN\u003Cbr>☐Rigging; RA, RI, RB, WP, HP ☐Dogger; DG\u003Cbr>☐Heavy Rigid License; HR ☐Heavy Combination License; HC | ☐LTM 1095-5.1 (95T)☐LTM 1130-5.1 (130T)☐Truck / Trailer\u003Cbr>☐Lifting Gear, Slings, Chains and Spreader |\n| ☐First Aider | Bar |\n|  | ☐Maeda MC305C2 |\n|  | ☐Power Attack MTC 30 CC |\n\n\n| Safety & Emergency Equipment | Hazardous Substances |\n| --- | --- |\n| ☐Fire Extinguisher\u003Cbr>☐First Aid Kit\u003Cbr>☐Signage, Barriers, Traffic Cones ☐Tag Lines\u003Cbr>☐Spill Kit\u003Cbr>☐Radios\u003Cbr>☐Fall Arrest Equipment | ☐TBC |\n\n\n| RISK ASSESSMENT – Assess the risks of each hazard associated to the tasks using the risk matrix below and implement necessary controls. |  |  |  |  |  |  |  |  |  |\n| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |\n|  |  |  | Likelihood 􀃖 |  |  |  |  | Likelihood Description |  |\n|  | Consequence 􀃘 |  | Very Likely | Likely | Unlikely | Very Unlikely |  | Very Likely | Constant exposure to the hazard, easily foreseeable, could happen any moment, has happened on several occasions |\n|  |  |  |  |  |  |  |  | Likely | Regular exposure to the hazard, could happen at times, has occurred before |\n|  | Extreme |  | 16 | 14 | 11 | 7 |  |  |  |\n|  |  |  |  |  |  |  |  | Unlikely | Infrequent exposure to the hazard, could happen but not really likely, has |\n|  | Major |  | 15 | 12 | 8 | 4 |  |  |  |\n|  | Moderate |  |  |  |  | 2 |  |  | occurred once before somewhere |\n|  |  |  | 13 | 9 | 5 |  |  | Very Unlikely | Rarely exposed to the hazard, not really expected, have never heard of it happening |\n|  | Minor |  | 10 | 6 | 3 | 1 |  |  |  |\n|  |  |  |  |  |  |  |  |  |  |\n| Consequence Description |  |  |  |  |  |  |  | |  |\n| Extreme |  | Single and multiple fatality, Critical incident for business, over $100,000 business loss |  |  |  |  |  |  |  |\n| Major |  | Severe injury with some weeks off work (e.g. amputation, degloving, loss of eye etc. ), over $50,000 business loss |  |  |  |  |  |  |  |\n| Moderate |  | Considerable injury (e.g. major cut/graze, stitches, crushed finger etc. ), over $10,000 business loss |  |  |  |  |  |  |  |\n| Minor |  | Minor injury (e.g. cut finger requiring Band-Aid, small graze etc. ), minimal to no business ","cbCaiuotVjhyz84p","https://ap.wps.com/l/cbCaiuotVjhyz84p","pdf",607880,"English","# Project Information\n## High Risk Work\n## PPE, Safety & Emergency Equipment\n## Qualifications / Competencies\n## Safety & Emergency Equipment & Hazardous Substances\n## Risk Assessment Framework\n## Basic Job Steps and Controls","[{\"question\":\"What project information fields does the SWMS template require?\",\"answer\":\"It collects fields such as Project Name, Project Address, Commencement Date, Duration of Works, and the Date Provided to the Principal Contractor.\"},{\"question\":\"How does the template define and record high-risk work?\",\"answer\":\"It provides a checklist of high risk construction activities (e.g., work near energised electrical installations, falls over 2 metres, confined spaces, asbestos removal, demolition of load-bearing structures) for indication and selection.\"},{\"question\":\"What PPE and safety equipment sections are included?\",\"answer\":\"The template lists mandatory PPE (uniform, hi vis, footwear, hard hat, eyewear, gloves, hearing protection, dust mask, fall arrest, and other) plus task-specific PPE, along with safety and emergency equipment and a hazardous substances section.\"}]","170120-CC-SWMS-01-R8-General-Lifting-Template | PDF",6]