[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-1-en-105":3,"doc-seo-243250-105":53,"doc-detail-243250-en":126},{"code":4,"msg":5,"data":6},0,"success",[7,14,19,24,29,34,39,44,49],{"id":8,"doc_module":9,"doc_module_name":10,"category_name":11,"show_sort_weight":12,"slug":13},11,1,"Template","Presentations",90,"presentations",{"id":15,"doc_module":9,"doc_module_name":10,"category_name":16,"show_sort_weight":17,"slug":18},12,"Resumes",80,"resumes",{"id":20,"doc_module":9,"doc_module_name":10,"category_name":21,"show_sort_weight":22,"slug":23},14,"Invoices",70,"invoices",{"id":25,"doc_module":9,"doc_module_name":10,"category_name":26,"show_sort_weight":27,"slug":28},15,"Posters",60,"posters",{"id":30,"doc_module":9,"doc_module_name":10,"category_name":31,"show_sort_weight":32,"slug":33},16,"Social Media",50,"social-media",{"id":35,"doc_module":9,"doc_module_name":10,"category_name":36,"show_sort_weight":37,"slug":38},17,"Forms",40,"forms",{"id":40,"doc_module":9,"doc_module_name":10,"category_name":41,"show_sort_weight":42,"slug":43},18,"Letters",30,"letters",{"id":45,"doc_module":9,"doc_module_name":10,"category_name":46,"show_sort_weight":47,"slug":48},21,"Paper Templates",5,"papers-templates",{"id":50,"doc_module":9,"doc_module_name":10,"category_name":51,"show_sort_weight":4,"slug":52},158,"General","general-158",{"code":4,"msg":54,"data":55},"ok",{"site_id":56,"language":57,"slug":58,"title":59,"keywords":60,"description":61,"schema_data":62,"social_meta":119,"head_meta":121,"extra_data":123,"updated_unix":125},105,"en","152-shop-drawing-submittals-introduction-requirements-and-review-process","152 Shop Drawing Submittals - Introduction - Requirements and Review Process","","Defines the purpose and acceptance process for Shop Drawing submittals under Contract Plans and specifications, including quality expectations and completeness requirements for fabrication without cross-referencing other documents. Specifies typical content for structural bridge components and provides key definitions for roles, record drawings, review offices, and related public-safety categories. Clarifies which supporting materials (e.g., certifications, welding and mix designs) are not required for FDOT shop-drawing review, outlines mandatory contractor information, and describes conditions for specialty engineer or contractor EOR signed and sealed submittals, plus transmittal rules.",{"@graph":63,"@context":118},[64,80,101],{"@type":65,"itemListElement":66},"BreadcrumbList",[67,71,74,77],{"item":68,"name":69,"@type":70,"position":9},"https://docshare.wps.com","Home","ListItem",{"item":72,"name":10,"@type":70,"position":73},"https://docshare.wps.com/template/",2,{"item":75,"name":36,"@type":70,"position":76},"https://docshare.wps.com/template/forms/",3,{"item":78,"name":59,"@type":70,"position":79},"https://docshare.wps.com/template/152-shop-drawing-submittals-introduction-requirements-and-review-process/243250/",4,{"url":78,"name":59,"@type":81,"image":82,"author":87,"headline":59,"publisher":90,"fileFormat":93,"inLanguage":57,"description":61,"dateModified":94,"datePublished":95,"encodingFormat":93,"isAccessibleForFree":96,"interactionStatistic":97},"DigitalDocument",{"url":83,"@type":84,"width":85,"height":86},"https://docshare.wps.com/thumbnails/152-shop-drawing-submittals-introduction-requirements-and-review-process/243250.png","ImageObject",442,249,{"name":88,"@type":89},"Cipher","Person",{"url":68,"name":91,"@type":92},"DocShare","Organization","application/pdf","2026-10-04","2026-09-12",true,{"@type":98,"interactionType":99,"userInteractionCount":73},"InteractionCounter",{"@type":100},"ViewAction",{"@type":102,"mainEntity":103},"FAQPage",[104,110,114],{"name":105,"@type":106,"acceptedAnswer":107},"What is the purpose of a Shop Drawing submittal under the contract documents?","Question",{"text":108,"@type":109},"Shop Drawing submittals are the accepted method for approving specific elements while allowing flexibility in the Contractor’s means and methods. Contract Plans and special provisions identify the requirements for submitting Shop Drawings.","Answer",{"name":111,"@type":106,"acceptedAnswer":112},"What quality and completeness standards apply to Shop Drawing submittals?",{"text":113,"@type":109},"Submittals must meet or exceed the quality level of previously approved submittals of similar nature and be complete enough to allow fabrication without referencing other documents.",{"name":115,"@type":106,"acceptedAnswer":116},"Which items generally do not need to be submitted to the FDOT Shop Drawing Review Office?",{"text":117,"@type":109},"Material certifications, welding procedures, paint procedures, and concrete mix designs are typically submitted to the Engineer (CEI) and then forwarded to the State Materials Engineer. These items do not need FDOT Shop Drawing Review Office review and approval.","https://schema.org",{"og:url":78,"og:type":120,"og:title":59,"og:site_name":91,"og:description":61},"article",{"robots":122,"canonical":78},"index,follow",{"doc_id":124,"site_id":56},243250,1791127716,{"code":4,"msg":5,"data":127},{"doc_id":124,"user_id":128,"nickname":88,"user_avatar":129,"doc_module":9,"category_id":35,"category_name":36,"doc_title":59,"doc_description":61,"doc_content":130,"file_id":131,"file_url":132,"file_type":133,"file_size":134,"view_count":79,"is_deleted":4,"is_public":9,"is_downloadable":9,"audit_status":9,"page_count":45,"language":135,"language_code":57,"site_id":56,"html_lang":57,"table_of_contents":136,"faqs":137,"seo_title":138,"seo_description":61,"update_tm":139,"read_time":140},687208528416,"https://ap-avatar.wpscdn.com/davatar_9964176cb1d06d4a9deccf72a44ae3dc","152 Shop Drawing Submittals  \n152.1 Introduction  \nWhile the Contract Plans and Specifications (including Supplemental and Special Provisions) define the overall nature of the project, Shop Drawing submittal is the accepted method of approving a specific element of the work while allowing flexibility in the Contractor's means and methods. The Contract Plans and Special Provisions for the project are to identify the requirements for submittal of Shop Drawings.  \nShop Drawing submittals must meet or exceed the quality level of previously approved submittals of a similar nature and be complete enough to allow for fabrication of an item without referencing any other document.  \nA Shop Drawing submittal for structural bridge components (e.g. , steel girders, non-standard precast/prestressed beams) typically include plan and elevation views denoting the placement of a component in the structure.  \nUnless explicitly stated, definitions shown referencing the Standard Specifications are the same for the Design-Build Division I Specifications:  \n(1) Shop Drawings: See Specifications.  \n(2) Engineer: See Specifications.  \n(3) Engineer of Record (EOR) : See Specifications.  \n\n| Modification for Non-Conventional Projects: |\n| --- |\n| Delete Engineer of Record (EOR) definition and replace with the following:\u003Cbr>(3) Engineer of Record (EOR) : See Design-Build Specifications. |\n\n(4) Contractor’s Engineer of Record: See Specifications.  \n(5) Specialty Engineer: See Specifications.  \n(6) Consultant: The Professional Engineer or Engineering Firm, or the Architect or Architectural Firm, licensed in the State of Florida and under contract to the Department to perform professional services. The consultant may be the Engineer or Architect of Record or may provide services through and be subcontracted to the Engineer or Architect of Record.  \n152-Shop Drawing Submittals  \n(7) Architect of Record: The Architect or Architectural Firm registered in the State of Florida that performs services for the Department in connection with the design and construction of buildings.  \n\n| Modification for Non-Conventional Projects: |\n| --- |\n| Delete Architect of Record definition and replace with the following:\u003Cbr>(7) Architect of Record: The Architect or Architectural Firm registered in the State of Florida that performs services for the Design-Build Firm in connection with the design and construction of buildings. |\n\n(8) “Ballooning”: The Contractor’s use of minimum 1/16 inch wide lines to \"balloon\"or \"cloud\" (encircle) notes or details on drawings, and design calculations, in order to explicitly and prominently call out any deviations from the Contract Plans or Specifications. The EOR may also use \"ballooning\" to make note of any limitations to their submittal review and disposition of Shop Drawings.  \n(9) Record Shop Drawings: The Department's official record copy of all Shop Drawings, correspondence/ transmittal files and submittal activity record (logbook) .  \n(10) FDOT Shop Drawing Review Office: The office or other Department entity responsible for performing the Department's review, record keeping, disposition and distribution of Shop Drawings to other disciplines within the district for review as well as distribution back to the project personnel. This office is normally the District Structures Design Office.  \n(11) Final Review Office: FDOT Shop Drawing Review Office or the EOR performing the final review and making final distribution of shop drawings which have been reviewed.  \n(12) Demolition of Bridges with Continuous Beams or Girders Affecting Public Safety: See Specifications.  \n(13) Construction Works Affecting Public Safety: See Specifications.  \n\n| Modification for Non-Conventional Projects: |\n| --- |\n| Expand the list above with the following:\u003Cbr>(14) Design-Build Firm: See Design-Build Specifications. |\n\n152-Shop Drawing Submittals  \n152.2 Shop Drawing Submittals Not Required  \nMaterial certifications, welding procedures, paint procedures and co","cbCaibIr4OWtMvYl","https://ap.wps.com/l/cbCaibIr4OWtMvYl","pdf",1285803,"English","# 152 Shop Drawing Submittals\n## 152.1 Introduction\n## 152.2 Shop Drawing Submittals Not Required\n## 152.3 Contractor Information Required\n## 152.4 Submittals Requiring a Specialty Engineer or Contractor’s Engineer of Record\n## 152.5 Transmittal of Submittals","[{\"question\":\"What is the purpose of a Shop Drawing submittal under the contract documents?\",\"answer\":\"Shop Drawing submittals are the accepted method for approving specific elements while allowing flexibility in the Contractor’s means and methods. Contract Plans and special provisions identify the requirements for submitting Shop Drawings.\"},{\"question\":\"What quality and completeness standards apply to Shop Drawing submittals?\",\"answer\":\"Submittals must meet or exceed the quality level of previously approved submittals of similar nature and be complete enough to allow fabrication without referencing other documents.\"},{\"question\":\"Which items generally do not need to be submitted to the FDOT Shop Drawing Review Office?\",\"answer\":\"Material certifications, welding procedures, paint procedures, and concrete mix designs are typically submitted to the Engineer (CEI) and then forwarded to the State Materials Engineer. These items do not need FDOT Shop Drawing Review Office review and approval.\"}]","152 Shop Drawing Submittals - Introduction - Requirements and Review Process | PDF",1789201872,7]