[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-1-en-105":3,"doc-seo-392819-105":53,"doc-detail-392819-en":127},{"code":4,"msg":5,"data":6},0,"success",[7,14,19,24,29,34,39,44,49],{"id":8,"doc_module":9,"doc_module_name":10,"category_name":11,"show_sort_weight":12,"slug":13},11,1,"Template","Presentations",90,"presentations",{"id":15,"doc_module":9,"doc_module_name":10,"category_name":16,"show_sort_weight":17,"slug":18},12,"Resumes",80,"resumes",{"id":20,"doc_module":9,"doc_module_name":10,"category_name":21,"show_sort_weight":22,"slug":23},14,"Invoices",70,"invoices",{"id":25,"doc_module":9,"doc_module_name":10,"category_name":26,"show_sort_weight":27,"slug":28},15,"Posters",60,"posters",{"id":30,"doc_module":9,"doc_module_name":10,"category_name":31,"show_sort_weight":32,"slug":33},16,"Social Media",50,"social-media",{"id":35,"doc_module":9,"doc_module_name":10,"category_name":36,"show_sort_weight":37,"slug":38},17,"Forms",40,"forms",{"id":40,"doc_module":9,"doc_module_name":10,"category_name":41,"show_sort_weight":42,"slug":43},18,"Letters",30,"letters",{"id":45,"doc_module":9,"doc_module_name":10,"category_name":46,"show_sort_weight":47,"slug":48},21,"Paper Templates",5,"papers-templates",{"id":50,"doc_module":9,"doc_module_name":10,"category_name":51,"show_sort_weight":4,"slug":52},158,"General","general-158",{"code":4,"msg":54,"data":55},"ok",{"site_id":56,"language":57,"slug":58,"title":59,"keywords":60,"description":61,"schema_data":62,"social_meta":120,"head_meta":122,"extra_data":124,"updated_unix":126},105,"en","104-landscape-management-and-maintenance-plan-appendix-104-a29-realignment","10.4 LANDSCAPE MANAGEMENT AND MAINTENANCE PLAN - Appendix 10.4 - A29 REALIGNMENT","","Landscape Management & Maintenance Plan (LMMP) for the A29 Phase 1 realignment development north of Eastergate village and northwest of Barnham village. Sets long-term landscape management goals and initial five-year practices after planting and across the development’s lifetime. Defines objectives including safeguarding existing and proposed vegetation, managing drainage and infiltration, maintaining a clean and tidy appearance, supporting natural habitat and biodiversity, and controlling invasive or injurious weeds. Includes scope for establishment, defects liability and maintenance responsibility durations.",{"@graph":63,"@context":119},[64,80,102],{"@type":65,"itemListElement":66},"BreadcrumbList",[67,71,74,77],{"item":68,"name":69,"@type":70,"position":9},"https://docshare.wps.com","Home","ListItem",{"item":72,"name":10,"@type":70,"position":73},"https://docshare.wps.com/template/",2,{"item":75,"name":46,"@type":70,"position":76},"https://docshare.wps.com/template/paper-templates/",3,{"item":78,"name":59,"@type":70,"position":79},"https://docshare.wps.com/template/104-landscape-management-and-maintenance-plan-appendix-104-a29-realignment/392819/",4,{"url":78,"name":59,"@type":81,"image":82,"author":87,"headline":59,"publisher":90,"fileFormat":93,"inLanguage":57,"description":61,"dateModified":94,"datePublished":95,"encodingFormat":93,"isAccessibleForFree":96,"interactionStatistic":97},"DigitalDocument",{"url":83,"@type":84,"width":85,"height":86},"https://docshare.wps.com/thumbnails/104-landscape-management-and-maintenance-plan-appendix-104-a29-realignment/392819.png","ImageObject",442,249,{"name":88,"@type":89},"Franzy","Person",{"url":68,"name":91,"@type":92},"DocShare","Organization","application/pdf","2026-10-14","2026-09-25",true,{"@type":98,"interactionType":99,"userInteractionCount":101},"InteractionCounter",{"@type":100},"ViewAction",6,{"@type":103,"mainEntity":104},"FAQPage",[105,111,115],{"name":106,"@type":107,"acceptedAnswer":108},"What does the Landscape Management & Maintenance Plan (LMMP) cover?","Question",{"text":109,"@type":110},"It outlines proposed management of landscape elements for the A29 Phase 1 realignment scheme, including long-term goals, maintenance practices after planting, and the development lifetime.","Answer",{"name":112,"@type":107,"acceptedAnswer":113},"What review timing is required for the LMMP?",{"text":114,"@type":110},"A formal review is scheduled at the end of Year 1, Year 3, and Year 5 of the defects period, with updates agreed with the Local Authority.",{"name":116,"@type":107,"acceptedAnswer":117},"How is the defects liability and maintenance responsibility split?",{"text":118,"@type":110},"Plants replaced due to defects are handled by the contractor for the first 18-month period, followed by an additional 42 months by WSCC, totaling five years. Maintenance after practical completion follows the same 18-month contractor then 42-month WSCC structure.","https://schema.org",{"og:url":78,"og:type":121,"og:title":59,"og:site_name":91,"og:description":61},"article",{"robots":123,"canonical":78},"index,follow",{"doc_id":125,"site_id":56},392819,1790911653,{"code":4,"msg":5,"data":128},{"doc_id":125,"user_id":129,"nickname":88,"user_avatar":130,"doc_module":9,"category_id":45,"category_name":46,"doc_title":59,"doc_description":61,"doc_content":131,"file_id":132,"file_url":133,"file_type":134,"file_size":135,"view_count":101,"is_deleted":4,"is_public":9,"is_downloadable":9,"audit_status":9,"page_count":136,"language":137,"language_code":57,"site_id":56,"html_lang":57,"table_of_contents":138,"faqs":139,"seo_title":140,"seo_description":61,"update_tm":141,"read_time":142},2336478945519,"https://ap-avatar.wpscdn.com/davatar_085a072bc5b1113ac321206ff7593b45","10.4 LANDSCAPE MANAGEMENT AND MAINTENANCE PLAN  \nWest Sussex County Council  \nA29 REALIGNMENT  \nLandscape Management & Maintenance Plan  \nAUGUST 2020 RESTRICTED  \nWest Sussex County Council  \nA29 REALIGNMENT  \nLandscape Management & Maintenance Plan  \nTYPE OF DOCUMENT (VERSION) RESTRICTED  \nPROJECT NO. 70060779  \nDATE: AUGUST 2020  \nWSP  \nKings Orchard  \n1 Queen Street  \nBristol  \nBS2 0HQ  \nPhone: +44 117 930 6200  \n[WSP.com](WSP.com)  \nRESTRICTED  \nQUALITY CONTROL  \n\n| Issue/revision | First issue | Revision 1 | Revision 2 | Revision 3 |\n| --- | --- | --- | --- | --- |\n| Remarks |  | Table text | Table text | Table text |\n| Date | 07/08/2020 | Table text | Table text |  |\n| Prepared by | Graham Gardener | Table text | Table text |  |\n| Signature |  |  |  |  |\n| Checked by | Lorna Gribbin | Table text | Table text | Table text |\n| Signature |  |  |  |  |\n| Authorised by | Katy Mayhew | Table text | Table text | Table text |\n| Signature |  |  |  |  |\n| Project number | 70060779 | Table text | Table text | Table text |\n| Report number | 0001 |  |  |  |\n| File reference |  | Table text | Table text | Table text |\n\nA29 REALIGNMENT RESTRICTED | WSP  \nProject No.: 70060779 August 2020  \nWest Sussex County Council  \nCONTENTS  \n\n| 1 | OBJECTIVES | 1 |\n| --- | --- | --- |\n| 2 | BACKGROUND | 2 |\n| 2.1 | A29 REALIGNMENT | 2 |\n| 3 | PRELIMINARIES | 3 |\n| 3.1 | ESTABLISHMENT AND DEFECTS LIABILITY PERIOD\u003Cbr>DEFECTS LIABILITY | 3\u003Cbr>3 |\n| 4 | GENERAL MAINTENANCE | 4 |\n| 5 | EXISTING TREES | 5 |\n| 6 | EXISTING AND PROPOSED WILDFLOWER / GRASS AREAS | 6 |\n| 6.1 | GENERAL MAINTENANCE: ALL GRASS & WILDFLOWER AREAS | 6 |\n| 6.2 | AMENITY GRASSLAND | 6 |\n| 6.3 | WILDFLOWER MEADOW | 6 |\n| 6.4 | WETLAND GRASS | 7 |\n| 7 | SHRUB, HEDGE, WOODLAND AND TREE PLANTING AREAS | 8 |\n| 8\u003Cbr>9 | SHRUBS\u003Cbr>WOODLAND PLANTING TREE PLANTING HEDGE PLANTING\u003Cbr>WEED CONTROL\u003Cbr>MAINTENANCE SCHEDULES | 8\u003Cbr>8\u003Cbr>8\u003Cbr>9\u003Cbr>10\u003Cbr>11 |\n|  |  |  |\n\nA29 REALIGNMENT RESTRICTED | WSP  \nProject No.: 70060779 August 2020  \nWest Sussex County Council  \nTABLES  \nTable 6-1 – Grass Cutting Table 6  \nTable 9-1 – Monthly Programme of Works 01  \nTable 9-2 – Annual Programme of Works 03  \nAPPENDICES  \nNo table of contents entries found.  \nA29 REALIGNMENT RESTRICTED | WSP  \nProject No.: 70060779 August 2020  \nWest Sussex County Council  \n1  \nOBJECTIVES  \nRESTRICTED  \n1 OBJECTIVES  \n1.1.1. This Landscape Maintenance and Management Plan (LMMP) outlines the proposed management of the landscape elements of the A29 Phase 1 realignment development (hereafter referred to as the‘Scheme’) . This document sets out the long-term goals and landscape management practices for the initial five years of the Scheme after planting, and for the lifetime of the development. This LMMP, in its current form, should be viewed as an outline document and will be further developed throughout the design development of the project. A formal review should take place at the end of Year 1, 3 and 5 of the Defects Period, and updated in agreement with the Local Authority.  \n1.1.2. The objectives of this LMMP are:  \n􀂃 To ensure the continued health and vigour of the existing trees, shrubs and any retained vegetation on the site;  \n􀂃 To ensure the successful establishment and continued healthy growth through to maturity of all proposed vegetation;  \n􀂃 To manage drainage and infiltration areas to ensure they are effective;  \n􀂃 To achieve a clean, tidy condition and appearance of all external areas;  \n􀂃 To ensure the continued existence of natural habitat for existing species and promote the environment wherever possible; and  \n􀂃 To control invasive and injurious weeds within the planting plots and within the scheme boundary.  \nA29 REALIGNMENT RESTRICTED | WSP Project No.: 70060779 August 2020  \nWest Sussex County Council Page 1 of 14  \n2 BACKGROUND  \n2.1 A29 REALIGNMENT  \n2.1.1. West Sussex County Council (referred to as ‘the Applicant’) is seeking to obtain detailed planning permission for the Phase 1 realignment of the A29 ","cbCairydSOHn6r7r","https://ap.wps.com/l/cbCairydSOHn6r7r","pdf",1034095,22,"English","# OBJECTIVES\n## 1.1.1\n# BACKGROUND\n## 2.1.1 A29 REALIGNMENT\n# PRELIMINARIES\n## 3.1.1 Establishment and defects liability period","[{\"question\":\"What does the Landscape Management \\u0026 Maintenance Plan (LMMP) cover?\",\"answer\":\"It outlines proposed management of landscape elements for the A29 Phase 1 realignment scheme, including long-term goals, maintenance practices after planting, and the development lifetime.\"},{\"question\":\"What review timing is required for the LMMP?\",\"answer\":\"A formal review is scheduled at the end of Year 1, Year 3, and Year 5 of the defects period, with updates agreed with the Local Authority.\"},{\"question\":\"How is the defects liability and maintenance responsibility split?\",\"answer\":\"Plants replaced due to defects are handled by the contractor for the first 18-month period, followed by an additional 42 months by WSCC, totaling five years. Maintenance after practical completion follows the same 18-month contractor then 42-month WSCC structure.\"}]","10.4 LANDSCAPE MANAGEMENT AND MAINTENANCE PLAN - Appendix 10.4 - A29 REALIGNMENT | PDF",1790374669,8]