[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-233804-113":3,"doc-detail-233804-id":80,"detail-sidebar-cat-1-id-113":96},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":73,"head_meta":75,"extra_data":77,"updated_unix":79},113,"id","budget-cost-plan-for-work-of-a-single-story-wooden-frame-house-with-woven-wire-wall-plaster-ferro-cement-area-36-m2-pidie-jaya-regency-aceh-province-2017","Rencana Anggaran Biaya Pekerjaan Rumah 1-Lantai Rangka Kayu dengan Dinding Kawat Anyam Plester / Ferro-Cement (luas 36 m2) - Kabupaten Pidie Jaya, Provinsi Aceh Tahun 2017","","Rencana Anggaran Biaya (RAB) untuk pekerjaan rumah 1-lantai dengan rangka kayu dan dinding kawat anyam, menggunakan plester/Ferro-Cement seluas 36 m2 di Kabupaten Pidie Jaya, Provinsi Aceh, tahun 2017. Dokumen merinci item pekerjaan pendahuluan, pondasi, beton bertulang, dan pekerjaan dinding bata, lengkap dengan satuan, volume, bahan (harga satuan bahan), serta harga bahan total. Struktur tabel memudahkan rekap kebutuhan material dan biaya tiap tahapan pekerjaan.",{"@graph":14,"@context":72},[15,34,55],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/id/template/","Template",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/id/template/umum/","Umum",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/id/template/budget-cost-plan-for-work-of-a-single-story-wooden-frame-house-with-woven-wire-wall-plaster-ferro-cement-area-36-m2-pidie-jaya-regency-aceh-province-2017/233804/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/budget-cost-plan-for-work-of-a-single-story-wooden-frame-house-with-woven-wire-wall-plaster-ferro-cement-area-36-m2-pidie-jaya-regency-aceh-province-2017/233804.png","ImageObject",442,249,{"name":42,"@type":43},"Mabel","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-09-21","2026-09-10",true,{"@type":52,"interactionType":53,"userInteractionCount":22},"InteractionCounter",{"@type":54},"ViewAction",{"@type":56,"mainEntity":57},"FAQPage",[58,64,68],{"name":59,"@type":60,"acceptedAnswer":61},"RAB ini untuk proyek apa dan di mana lokasinya?","Question",{"text":62,"@type":63},"RAB ini untuk pekerjaan rumah 1-lantai dengan rangka kayu dan dinding kawat anyam, plester/Ferro-Cement seluas 36 m2. Lokasinya di Kabupaten Pidie Jaya, Provinsi Aceh.","Answer",{"name":65,"@type":60,"acceptedAnswer":66},"Apa saja kelompok pekerjaan yang tercantum dalam RAB?",{"text":67,"@type":63},"Kelompok pekerjaan yang tercantum meliputi pekerjaan pendahuluan, pekerjaan pondasi, pekerjaan beton bertulang, dan pekerjaan dinding bata.",{"name":69,"@type":60,"acceptedAnswer":70},"Bagaimana format perhitungan biaya pada tabel item pekerjaan?",{"text":71,"@type":63},"Setiap item menampilkan nomor uraian, satuan, volume, harga satuan bahan, dan harga bahan total (dengan keterangan upah tukang pada bagian tertentu).","https://schema.org",{"og:url":32,"og:type":74,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":76,"canonical":32},"index,follow",{"doc_id":78,"site_id":7},233804,1789991232,{"code":4,"msg":81,"data":82},"success",{"doc_id":78,"user_id":83,"nickname":42,"user_avatar":84,"doc_module":22,"category_id":85,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":86,"file_id":87,"file_url":88,"file_type":89,"file_size":90,"view_count":22,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":33,"language":91,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":92,"faqs":93,"seo_title":94,"seo_description":12,"update_tm":95,"read_time":26},7971474920318,"https://ap-avatar.wpscdn.com/avatar/74000ee537e6b0ca360?x-image-process=image/resize,m_fixed,w_180,h_180&k=1788430171632181674",183,"RENCANAANGGARAN BIAYA  \nPEKERJAAN LOKASITAHUN  \n: Rumah 1-Lantai Rangka Kayu dengan Dinding KawatAnyamPlester / Ferro-Cement (luas 36 m2): Kabupaten Pidie Jaya, Provinsi Aceh  \n: 2017  \n\n| NO | U R A I A N | SATUAN | VOLUME | HARGA SATUAN\u003Cbr>BAHAN (Rp) | HARGA BAHAN\u003Cbr>TOTAL (Rp) |\n| --- | --- | --- | --- | --- | --- |\n|  |  |  |  |  |  |\n| I | PEKERJAAN PENDAHULUAN |  |  |  |  |\n| 1 | Pembersihan Lapangan | m2 | 76.00 |  | Upah Tukang |\n| 2 | Pasangan Bowplank | m | 35.00 |  | Upah Tukang |\n|  | Balok Kayu Klas III (5 x 7) | 4m/ batang | 6.00 | 40,600 | 243,600 |\n|  | Paku 2\"-3\" | kg | 0.70 | 15,000 | 10,500 |\n|  | Papan Kayu Klas III (2x20) | 4m/ batang | 9.00 | 46,400 | 417,600 |\n|  |  |  |  |  |  |\n| II | PEKERJAAN PONDASI |  |  |  |  |\n| 1 | Galian Pondasi | m3 | 12.52 |  | Upah Tukang |\n| 2 | Pek. Pasir Urug | m3 | 0.82 | 187,500 | 153,698 |\n| 3 | Pek Lantai Kerja 1:3:6 | m3 | 1.59 |  | Upah Tukang |\n|  | Semen PPC | 40 kg/sak | 9.16 | 62,000 | 568,225 |\n|  | Pasir Cor | m3 | 1.29 | 187,500 | 242,617 |\n|  | Kerikil | m3 | 1.17 | 400,000 | 467,696 |\n| 4 | Pas. Pondasi Batu Kali | m3 | 9.11 |  | Upah Tukang |\n|  | Semen Tipe I | 40 kg/sak | 37.12 | 75,000 | 2,783,633 |\n|  | Pasir Pasang | m3 | 4.74 | 187,500 | 888,030 |\n|  | Batu kali | m3 | 10.93 | 137,500 | 1,502,820 |\n| 5 | Pas. Angkur Besi Ø 10 | 12m/ batang | 3.00 | 65,000 | 195,000 |\n| 6 | Urugan Kembali | m3 | 26.57 |  | Upah Tukang |\n|  |  |  |  |  |  |\n| III | PEKERJAAN BETON BERTULANG |  |  |  |  |\n| 1 | Sloof 18/20 |  |  |  |  |\n|  | * Beton | m3 | 1.35 |  | Upah Tukang |\n| a | Semen Tipe I | 40 kg/sak | 10.97 | 75,000 | 822,433 |\n| b | Pasir Cor | m3 | 0.93 | 187,500 | 174,303 |\n| c | Kerikil | m3 | 0.99 | 400,000 | 395,575 |\n|  | * Besi Beton | kg | 198.55 |  | Upah Tukang |\n| a | Besi Ulir Ø 10 mm | 12m/ batang | 16.00 | 65,000 | 1,040,000 |\n| b | Begel Ø 8mm | 12m/ batang | 18.00 | 36,000 | 648,000 |\n| c | KawatBeton | kg | 2.98 | 16,000 | 47,652 |\n|  | * Bekisitng | m2 | 15.18 |  | Upah Tukang |\n| a | Papan 2/20 Kelas III | 4m/ batang | 19.00 | 46,400 | 881,600 |\n| b | Kayu 5/7 Kelas III | 4m/ batang | 2.00 | 40,600 | 81,200 |\n| c | Paku 2\"-3\" | kg | 4.55 | 15,000 | 68,310 |\n| d | Minyak Bekisting | liter | 1.52 | 7,500 | 11,385 |\n| 2 | Kolom 15/15 |  |  |  |  |\n|  | * Beton | m3 | 0.32 |  | Upah Tukang |\n| a | Semen Tipe I | 40 kg/sak | 2.62 | 75,000 | 196,523 |\n| b | Pasir Cor | m3 | 0.22 | 187,500 | 41,650 |\n| c | Kerikil | m3 | 0.24 | 400,000 | 94,524 |\n|  | * Besi Beton | kg | 80.20 |  | Upah Tukang |\n| a | Besi Ulir Ø 10 mm | 12mbatang | 7.00 | 65,000 | 455,000 |\n| b | Begel Ø 8mm | 12m/ batang | 6.00 | 36,000 | 216,000 |\n| c | KawatBeton | kg | 1.20 | 16,000 | 19,248 |\n|  | * Bekisitng | m2 | 1.69 |  | Upah Tukang |\n| a | Papan 2/20 Kelas III | 4m/ batang | 12.00 | 46,400 | 556,800 |\n\nHalaman 1 dari 4  \n\n| |  |  |  |  |  |\n| --- | --- | --- | --- | --- | --- |\n| NO | U R A I A N | SATUAN | VOLUME | HARGA SATUAN\u003Cbr>BAHAN (Rp) | HARGA BAHAN\u003Cbr>TOTAL (Rp) |\n| b | Kayu 5/7 Kelas III | 4m/ batang | 3.00 | 40,600 | 121,800 |\n| c | Paku 2\"-3\" | kg | 0.68 | 15,000 | 10,152 |\n| d | Minyak Bekisting | liter | 0.34 | 7,500 | 2,538 |\n| 3 | Kolom 10/15 |  |  |  | - |\n|  | * Beton | m3 | 0.03 |  | Upah Tukang |\n| a | Semen Tipe I | 40 kg/sak | 0.22 | 75,000 | 16,836 |\n| b | Pasir Cor | m3 | 0.02 | 187,500 | 3,568 |\n| c | Kerikil | m3 | 0.02 | 400,000 | 8,098 |\n|  | * Besi Beton | kg | 12.13 |  | Upah Tukang |\n| a | Besi Ulir Ø 10 mm | 12mbatang | 1.00 | 65,000 | 65,000 |\n| b | Begel Ø 8mm | 12m/ batang | 1.00 | 36,000 | 36,000 |\n| c | KawatBeton | 16,000.00 | 0.18 | 16,000 | 2,912 |\n|  | * Bekisitng | m2 | 0.38 |  | Upah Tukang |\n| a | Papan 2/20 Kelas III | 46,400.00 | 4.00 | 46,400 | 185,600 |\n| b | Kayu 5/7 Kelas III | 40,600.00 | 3.76 | 40,600 | 152,656 |\n| c | Paku 2\"-3\" | 15,000.00 | 0.15 | 15,000 | 2,256 |\n| d | Minyak Bekisting | liter | 0.08 | 7,500 | 564 |\n| 4 | Balok Lintel 15/15 |  |  |  |  |\n|  | * Beton | m3 | 0.73 |  | Upah Tukang |\n| a | Semen Tipe","cbCailbetNy4Gjdb","https://ap.wps.com/l/cbCailbetNy4Gjdb","pdf",536008,"Indonesian","# Rencana Anggaran Biaya\n## Pekerjaan Pendahuluan\n## Pekerjaan Pondasi\n## Pekerjaan Beton Bertulang\n## Pekerjaan Dinding Bata","[{\"question\":\"RAB ini untuk proyek apa dan di mana lokasinya?\",\"answer\":\"RAB ini untuk pekerjaan rumah 1-lantai dengan rangka kayu dan dinding kawat anyam, plester/Ferro-Cement seluas 36 m2. Lokasinya di Kabupaten Pidie Jaya, Provinsi Aceh.\"},{\"question\":\"Apa saja kelompok pekerjaan yang tercantum dalam RAB?\",\"answer\":\"Kelompok pekerjaan yang tercantum meliputi pekerjaan pendahuluan, pekerjaan pondasi, pekerjaan beton bertulang, dan pekerjaan dinding bata.\"},{\"question\":\"Bagaimana format perhitungan biaya pada tabel item pekerjaan?\",\"answer\":\"Setiap item menampilkan nomor uraian, satuan, volume, harga satuan bahan, dan harga bahan total (dengan keterangan upah tukang pada bagian tertentu).\"}]","Rencana Anggaran Biaya Pekerjaan Rumah 1-Lantai Rangka Kayu dengan Dinding Kawat Anyam Plester / Ferro-Cement (luas 36 m2) - Kabupaten Pidie Jaya, Provinsi Aceh Tahun 2017 | PDF",1789081072,{"code":4,"msg":81,"data":97},[98,102,106,110,114,118,122,126],{"id":99,"doc_module":22,"doc_module_name":25,"category_name":100,"show_sort_weight":4,"slug":101},178,"Faktur","faktur",{"id":103,"doc_module":22,"doc_module_name":25,"category_name":104,"show_sort_weight":4,"slug":105},192,"Formulir","formulir-192",{"id":107,"doc_module":22,"doc_module_name":25,"category_name":108,"show_sort_weight":4,"slug":109},180,"Media Sosial","media-sosial",{"id":111,"doc_module":22,"doc_module_name":25,"category_name":112,"show_sort_weight":4,"slug":113},179,"Poster","poster",{"id":115,"doc_module":22,"doc_module_name":25,"category_name":116,"show_sort_weight":4,"slug":117},176,"Presentasi","presentasi",{"id":119,"doc_module":22,"doc_module_name":25,"category_name":120,"show_sort_weight":4,"slug":121},177,"Resume","resume",{"id":123,"doc_module":22,"doc_module_name":25,"category_name":124,"show_sort_weight":4,"slug":125},182,"Surat","surat-a95d00d3aaf04f3b854ecf140f00d385",{"id":85,"doc_module":22,"doc_module_name":25,"category_name":29,"show_sort_weight":4,"slug":127},"umum-07d1ff437201438088836b2b1ed3c90f"]