[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-1-id-113":3,"doc-detail-235170-id":41,"doc-seo-235170-113":63},{"code":4,"msg":5,"data":6},0,"success",[7,13,17,21,25,29,33,37],{"id":8,"doc_module":9,"doc_module_name":10,"category_name":11,"show_sort_weight":4,"slug":12},178,1,"Template","Faktur","faktur",{"id":14,"doc_module":9,"doc_module_name":10,"category_name":15,"show_sort_weight":4,"slug":16},192,"Formulir","formulir-192",{"id":18,"doc_module":9,"doc_module_name":10,"category_name":19,"show_sort_weight":4,"slug":20},180,"Media Sosial","media-sosial",{"id":22,"doc_module":9,"doc_module_name":10,"category_name":23,"show_sort_weight":4,"slug":24},179,"Poster","poster",{"id":26,"doc_module":9,"doc_module_name":10,"category_name":27,"show_sort_weight":4,"slug":28},176,"Presentasi","presentasi",{"id":30,"doc_module":9,"doc_module_name":10,"category_name":31,"show_sort_weight":4,"slug":32},177,"Resume","resume",{"id":34,"doc_module":9,"doc_module_name":10,"category_name":35,"show_sort_weight":4,"slug":36},182,"Surat","surat-a95d00d3aaf04f3b854ecf140f00d385",{"id":38,"doc_module":9,"doc_module_name":10,"category_name":39,"show_sort_weight":4,"slug":40},183,"Umum","umum-07d1ff437201438088836b2b1ed3c90f",{"code":4,"msg":5,"data":42},{"doc_id":43,"user_id":44,"nickname":45,"user_avatar":46,"doc_module":9,"category_id":38,"category_name":39,"doc_title":47,"doc_description":48,"doc_content":49,"file_id":50,"file_url":51,"file_type":52,"file_size":53,"view_count":9,"is_deleted":4,"is_public":9,"is_downloadable":9,"audit_status":9,"page_count":54,"language":55,"language_code":56,"site_id":57,"html_lang":56,"table_of_contents":58,"faqs":59,"seo_title":60,"seo_description":48,"update_tm":61,"read_time":62},235170,2336477974920,"Mimi","https://ap-avatar.wpscdn.com/davatar_155a257f0dc6eb9ab79c44ca47cae57d","Analisis Perbandingan Rencana Anggaran Biaya Antara Metode SNI 2008, AHSP 2023, Dan BOW Pada Pondasi Masjid Islamic Center Medan","Rencana Anggaran Biaya (RAB) menjadi proses inti dalam proyek karena menjadi dasar penawaran sistem pembiayaan dan kerangka anggaran yang akan dikeluarkan. Penyusunan RAB memerlukan koefisien/indeks untuk analisis harga satuan, yang dapat diperoleh melalui SNI 2008, AHSP 2023, serta analisis BOW (Burgeslijke Openbare Werken). Penelitian ini membandingkan hasil estimasi serta persentase perbandingan anggaran biaya pada pembangunan pondasi Masjid Islamic Center Medan. Hasil menunjukkan BOW Rp. 59.876.343.136,72; SNI 2008 Rp. 58.210.052.592,45; dan AHSP 2023 Rp. 54.890.825.596,64.","TUGASAKHIR  \nANALISIS PERBANDINGAN RENCANAANGGARAN BIAYA ANTARA METODE SNI 2008, AHSP 2023, DAN BOW PADA PONDASI MASJID  \nISLAMIC CENTER MEDAN  \nDiajukan Untuk Memenuhi Tugas-Tugas Dan Syarat-Syarat Untuk Memperoleh Gelar Sarjana Pada Fakultas Teknik Program Studi Teknik Sipil Universitas Muhammadiyah Sumatera Utara  \nDISUSUN OLEH:  \nAL QAMALUR RAHMAD  \n2107210014  \nPROGRAM STUDI TEKNIK SIPIL  \nFAKULTAS TENIK  \nUNIVERSITAS MUHAMMADIYAH SUMATERA UTARA  \nMEDAN  \nABSTRAK  \nANALISIS PERBANDINGAN RENCANAANGGARAN BIAYA ANTARA METODE SNI 2008, AHSP 2023, DAN BOW PADA PONDASI MASJID  \nISLAMIC CENTER MEDAN  \nAl Qamalur Rahmad  \n2107210014  \nRizki Efrida, S.T.,M.T  \nRencana Anggaran Biaya (RAB) merupakan salah satu proses utama dalam suatuproyek karena merupakan dasar untuk membuat penawaran sistem pembiayaan dankerangka budget yang akan dikeluarkan. Rencana Anggaran Biaya (RAB) diperlukanuntuk memperhitungkan suatu bangunan atau proyek dengan banyaknya biaya yang diperlukan untuk bahan, upah serta biaya-biaya lain yang berhubungandengan pelaksanaan bangunan atau proyek tersebut. Dalam pelaksanaan pekerjaan, kontraktor akan membuat rencana anggaran biaya sebagai dasar memasukkan penawaran terhadap suatu pekerjaan. Pembuatan Rencana Anggaran Biaya (RAB) memerlukan koefisien atau angka indeks untuk mendapatkan analisis harga satuanuntuk pekerjaan tersebut, angka indeks atau koefisien dapat diperoleh melalui analisis Standar Nasional Indonesia (SNI), Analisis Harga Satuan Pekerjaan (AHSP), analisis BOW (Burgeslijke Openbare Werken) . Adapun rumusan masalahdari penelitian ini yaitu berapakah hasil estimasi perbandingan anggaran biaya antara metode SNI 2008, AHSP 2023, dan BOW pada pembangunan pondasiproyek Masjid Islamic Center Kota Medan, dan bagaimana perbandingan persentase estimasi anggaran biaya dengan metode SNI 2008, AHSP 2023, dan BOW padapembangunan pondasiproyek Masjid Islamic Center Kota Medan. Hasil penelitian menunjukkan bahwa perhitungan hasil biaya estimasi dengan menggunakan metode BOW Rp. 59,876,343,136.72 , sedangkan SNI 2008 sebesar Rp. 58,210,052,592.45 , dan metode AHSP 2023 sebesar Rp. 54,890,825,596.64 ,.  \nKata Kunci: Rencana Anggaran Biaya, BOW, AHSP, SNI.  \nABSTRACT  \nCOMPARATIVE ANALYSIS OF BUDGET COST ESTIMATES USING SNI 2008, AHSP, AND BOW METHODS ON THE FOUNDATIONS OF THE ISLAMIC CENTER MOSQUE PROJECT IN MEDAN  \nAl Qamalur Rahmad  \n2107210014  \nRizki Efrida, S.T., M.T.  \nThe Cost Budget Plan (RAB) is one of the main processes in a project because it is the basis for making a financing system offer and budget framework that will be issued. The Cost Budget Plan (RAB) is needed to calculate a building or project with the amount of costs required for materials, wages and other costs related to the implementation of the building or project. In carrying out the work, the contractor will make a cost budget plan as a basis for submitting a bid for a job. Making a Cost Budget Plan (RAB) requires a coefficient or index number to obtain a unit price analysis for the work, the index number or coefficient can be obtained through the analysis of the Indonesian National Standard (SNI), Work Unit Price Analysis (AHSP), BOW (Burgeslijke Openbare Werken) analysis. The formulation of the problem of this research is what is the result of the estimated cost comparison between the SNI 2008, AHSP 2023, and BOW methods in the construction of the foundation of the Medan City Islamic Center Mosque project, and how is the comparison of the percentage of the estimated cost budget with the SNI 2008, AHSP 2023, and BOW methods in the construction of the foundation of the Medan City Islamic Center Mosque project. The results of the study show that the calculation of the estimated cost results using the BOW method is Rp. 59,876,343,136.72, while SNI 2008 is Rp. 58,210,052,592.45, and the AHSP 2023 method is Rp. 54,890,825,596.64,.  \nKeywords: Cost Budget Plan, BOW, AHSP, SNI.  \nKata Pengantar  \nAlhamdulillahirabbil’alamin puji syukur kehadira","cbCainSYVtyfXhkn","https://ap.wps.com/l/cbCainSYVtyfXhkn","pdf",11439393,100,"Indonesian","id",113,"# Kata Pengantar\n## Ucapan Terima Kasih dan Dukungan","[{\"question\":\"Apa tujuan penelitian dalam tugas akhir ini?\",\"answer\":\"Menilai hasil estimasi perbandingan anggaran biaya metode SNI 2008, AHSP 2023, dan BOW pada pondasi Masjid Islamic Center Medan, serta membandingkan persentasenya.\"},{\"question\":\"Metode apa saja yang dibandingkan untuk menghitung RAB?\",\"answer\":\"SNI 2008, AHSP 2023, dan BOW (Burgeslijke Openbare Werken).\"},{\"question\":\"Berapa nilai estimasi anggaran biaya menurut masing-masing metode?\",\"answer\":\"BOW Rp. 59.876.343.136,72; SNI 2008 Rp. 58.210.052.592,45; dan AHSP 2023 Rp. 54.890.825.596,64.\"}]","Analisis Perbandingan Rencana Anggaran Biaya Antara Metode SNI 2008, AHSP 2023, Dan BOW Pada Pondasi Masjid Islamic Center Medan | PDF",1789095519,35,{"code":4,"msg":64,"data":65},"ok",{"site_id":57,"language":56,"slug":66,"title":47,"keywords":67,"description":48,"schema_data":68,"social_meta":124,"head_meta":126,"extra_data":128,"updated_unix":129},"comparative-analysis-of-cost-budget-plans-between-sni-2008-ahsp-2023-and-bow-methods-for-the-islamic-center-medan-mosque-foundation","",{"@graph":69,"@context":123},[70,86,106],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,80,83],{"item":74,"name":75,"@type":76,"position":9},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":10,"@type":76,"position":79},"https://docshare.wps.com/id/template/",2,{"item":81,"name":39,"@type":76,"position":82},"https://docshare.wps.com/id/template/umum/",3,{"item":84,"name":47,"@type":76,"position":85},"https://docshare.wps.com/id/template/comparative-analysis-of-cost-budget-plans-between-sni-2008-ahsp-2023-and-bow-methods-for-the-islamic-center-medan-mosque-foundation/235170/",4,{"url":84,"name":47,"@type":87,"image":88,"author":93,"headline":47,"publisher":95,"fileFormat":98,"inLanguage":56,"description":48,"dateModified":99,"datePublished":100,"encodingFormat":98,"isAccessibleForFree":101,"interactionStatistic":102},"DigitalDocument",{"url":89,"@type":90,"width":91,"height":92},"https://docshare.wps.com/thumbnails/comparative-analysis-of-cost-budget-plans-between-sni-2008-ahsp-2023-and-bow-methods-for-the-islamic-center-medan-mosque-foundation/235170.png","ImageObject",442,249,{"name":45,"@type":94},"Person",{"url":74,"name":96,"@type":97},"DocShare","Organization","application/pdf","2026-09-21","2026-09-11",true,{"@type":103,"interactionType":104,"userInteractionCount":9},"InteractionCounter",{"@type":105},"ViewAction",{"@type":107,"mainEntity":108},"FAQPage",[109,115,119],{"name":110,"@type":111,"acceptedAnswer":112},"Apa tujuan penelitian dalam tugas akhir ini?","Question",{"text":113,"@type":114},"Menilai hasil estimasi perbandingan anggaran biaya metode SNI 2008, AHSP 2023, dan BOW pada pondasi Masjid Islamic Center Medan, serta membandingkan persentasenya.","Answer",{"name":116,"@type":111,"acceptedAnswer":117},"Metode apa saja yang dibandingkan untuk menghitung RAB?",{"text":118,"@type":114},"SNI 2008, AHSP 2023, dan BOW (Burgeslijke Openbare Werken).",{"name":120,"@type":111,"acceptedAnswer":121},"Berapa nilai estimasi anggaran biaya menurut masing-masing metode?",{"text":122,"@type":114},"BOW Rp. 59.876.343.136,72; SNI 2008 Rp. 58.210.052.592,45; dan AHSP 2023 Rp. 54.890.825.596,64.","https://schema.org",{"og:url":84,"og:type":125,"og:title":47,"og:site_name":96,"og:description":48},"article",{"robots":127,"canonical":84},"index,follow",{"doc_id":43,"site_id":57},1789976105]