[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-detail-112499-en":3,"doc-seo-112499-105":29,"detail-sidebar-cat-0-en-105":91},{"code":4,"msg":5,"data":6},0,"success",{"doc_id":7,"user_id":8,"nickname":9,"user_avatar":10,"doc_module":4,"category_id":11,"category_name":12,"doc_title":13,"doc_description":14,"doc_content":15,"file_id":16,"file_url":17,"file_type":18,"file_size":19,"view_count":20,"is_deleted":4,"is_public":20,"is_downloadable":20,"audit_status":20,"page_count":21,"language":22,"language_code":23,"site_id":24,"html_lang":23,"table_of_contents":25,"faqs":26,"seo_title":13,"seo_description":14,"update_tm":27,"read_time":28},112499,8796095461564,"Liam","https://ap-avatar.wpscdn.com/davatar_155a257f0dc6eb9ab79c44ca47cae57d",8,"Research & Report","Zambia - Completion and Learning Review Validation for the Country Partnership Framework for the Period FY19-FY24","Completion and Learning Review Validation evaluates the World Bank Group’s Completion and Learning Review for Zambia under the Country Partnership Framework covering FY19–FY23 and updated through the Performance and Learning Review extending the period to FY24. The validation assesses development outcomes and World Bank Group performance, aligned to Zambia’s national development plans and diagnostic priorities. It highlights progress across two focus areas, summarizes achievement levels for five objectives, and reviews relevance, risks, implementation constraints, and the simplification of the program design.","Public Disclosure Authorized Public Disclosure Authorized  \nCompletion and Learning Review Validation Republic of Zambia  \nFY19-FY24 Country Partnership Framework  \nSeptember 26, 2024  \nRatings  \n\n| Indicator | CLR Rating | CLRV (IEG) Rating |\n| --- | --- | --- |\n| Development outcome | Moderately Satisfactory | Moderately Satisfactory |\n| World Bank Group performance | Good | Good |\n\nNote: CLR = Completion and Learning Review; CLRV = Completion and Learning Review Validation; IEG = Independent Evaluation Group.  \nI. Executive Summary  \ni. This validation of the World Bank Group’s (WBG) Completion and Learning Review (CLR) covers the period of the Country Partnership Framework (CPF), fiscal years (FY)19–23, and updated in the Performance and Learning Review (PLR) dated May 7, 2023, which extended the CPF period by one year to FY24.  \nii. Zambia’s CPF design was aligned with the country’s 7th National Development Plan (NDP) and the priorities identified by the 2018 Systematic Country Diagnostic (SCD) to reach the Twin Goals. CPF preparation took place under a weak macroeconomic environment reflecting persistent structural imbalances. COVID-19 contributed to a worsening macroeconomic situation. The CPF response to the emerging underlying challenges was captured by PLR, which re-clustered the original CPF design from three to two focus areas, and from six to five objectives. The revised CPF structure reflected the response to the evolving challenges Zambia faced, and the priorities of the new government program (8th National Development Plan), and WBG corporate goals. The CPF structure includes:  \n• Focus Area I: Increased resilience of rural households to climate change and other shocks, comprising two objectives: (1) increased access to services to farmers and (2) increased access to and quality of resilient infrastructure services in selected rural areas and small towns.  \n• Focus Area II: Better job prospects for under-employed groups, comprising three objectives: (3) increased access to health, education, and social protection, (4) strengthening economic management for sustainable growth and regional integration, and (5) improved livelihood opportunities especially for rural communities.  \niii. IEG rates the CPF development outcome as Moderately Satisfactory. Out of five objectives, four were mostly achieved, and one was partially achieved.  \n• Under focus area I progress in increasing farmers’ access to services has been made in setting up the basis for the reform of the Farmer Input Support Program (FISP) and launching the distribution of e-vouchers. Gains have been made by surpassing the target set for building irrigation infrastructure and advancing insetting water users’ associations, building complementary roads and distributing land to farmers. Increase and diversification of services, as well as impact on productivity and incomes will require sustained efforts over the long haul (Objective 1, mostly achieved) . The targets on access to electricity, sanitation, and land protected/restored, as well as on social assistance to targeted populations were met. However, no progress was made in improving access to all-weather roads in rural areas (Objective 2, mostly achieved). Under focus area II, the number of girls enrolled in secondary schools surpassed the target and the expansion in capacity of secondary schools came close to the target. Results in health were mixed, achieving the goal for the treatment of tuberculosis, but with no progress in deliveries supervised by skilled health personnel (Objective 3, mostly achieved) .  \n• Under focus area II, the number of girls enrolled in secondary schools surpassed the target and the expansion in capacity of secondary schools came close to the target. Results in health were mixed, achieving the goal for the treatment of tuberculosis, but with no progress in deliveries supervised by skilled health personnel (Objective 3, mostly achieved) . The introduction of stricter parliamen","cbCaisNho24QzwlX","https://ap.wps.com/l/cbCaisNho24QzwlX","pdf",1025588,1,45,"English","en",105,"# Executive Summary\n## Validation scope and framework period\n## CPF alignment and program restructuring\n## IEG ratings and objective-level progress","[{\"question\":\"What time period does the Completion and Learning Review Validation cover?\",\"answer\":\"It covers the Country Partnership Framework period for Zambia across FY19–FY23, with updates from the Performance and Learning Review that extended the CPF by one year to FY24.\"},{\"question\":\"How does the validation rate Zambia’s CPF development outcome?\",\"answer\":\"IEG rates the CPF development outcome as Moderately Satisfactory, with four of five objectives mostly achieved and one partially achieved.\"},{\"question\":\"Which main focus areas does the CPF include and what do they cover?\",\"answer\":\"Focus Area I targets resilience of rural households to climate change and other shocks, while Focus Area II focuses on improved job prospects for under-employed groups, including access to health, education, social protection, economic management, and livelihoods.\"}]",1784495412,113,{"code":4,"msg":30,"data":31},"ok",{"site_id":24,"language":23,"slug":32,"title":13,"keywords":33,"description":14,"schema_data":34,"social_meta":86,"head_meta":88,"extra_data":90,"updated_unix":27},"zambia-completion-and-learning-review-validation-for-the-country-partnership-framework-for-the-period-fy19-fy24","",{"@graph":35,"@context":85},[36,53,68],{"@type":37,"itemListElement":38},"BreadcrumbList",[39,43,47,50],{"item":40,"name":41,"@type":42,"position":20},"https://docshare.wps.com","Home","ListItem",{"item":44,"name":45,"@type":42,"position":46},"https://docshare.wps.com/document/","Document",2,{"item":48,"name":12,"@type":42,"position":49},"https://docshare.wps.com/document/research-report/",3,{"item":51,"name":13,"@type":42,"position":52},"https://docshare.wps.com/document/zambia-completion-and-learning-review-validation-for-the-country-partnership-framework-for-the-period-fy19-fy24/112499/",4,{"url":51,"name":13,"@type":54,"author":55,"headline":13,"publisher":57,"fileFormat":60,"inLanguage":23,"description":14,"dateModified":61,"datePublished":62,"encodingFormat":60,"isAccessibleForFree":63,"interactionStatistic":64},"DigitalDocument",{"name":9,"@type":56},"Person",{"url":40,"name":58,"@type":59},"DocShare","Organization","application/pdf","2026-07-20","2026-07-19",true,{"@type":65,"interactionType":66,"userInteractionCount":20},"InteractionCounter",{"@type":67},"ViewAction",{"@type":69,"mainEntity":70},"FAQPage",[71,77,81],{"name":72,"@type":73,"acceptedAnswer":74},"What time period does the Completion and Learning Review Validation cover?","Question",{"text":75,"@type":76},"It covers the Country Partnership Framework period for Zambia across FY19–FY23, with updates from the Performance and Learning Review that extended the CPF by one year to FY24.","Answer",{"name":78,"@type":73,"acceptedAnswer":79},"How does the validation rate Zambia’s CPF development outcome?",{"text":80,"@type":76},"IEG rates the CPF development outcome as Moderately Satisfactory, with four of five objectives mostly achieved and one partially achieved.",{"name":82,"@type":73,"acceptedAnswer":83},"Which main focus areas does the CPF include and what do they cover?",{"text":84,"@type":76},"Focus Area I targets resilience of rural households to climate change and other shocks, while Focus Area II focuses on improved job prospects for under-employed groups, including access to health, education, social protection, economic management, and livelihoods.","https://schema.org",{"og:url":51,"og:type":87,"og:title":13,"og:site_name":58,"og:description":14},"article",{"robots":89,"canonical":51},"index,follow",{"doc_id":7,"site_id":24},{"code":4,"msg":5,"data":92},[93,97,101,105,110,115,120,123,128,131,135],{"id":20,"doc_module":4,"doc_module_name":45,"category_name":94,"show_sort_weight":95,"slug":96},"Story & Novel",90,"story-novel",{"id":46,"doc_module":4,"doc_module_name":45,"category_name":98,"show_sort_weight":99,"slug":100},"Literature",80,"literature",{"id":52,"doc_module":4,"doc_module_name":45,"category_name":102,"show_sort_weight":103,"slug":104},"Exam",70,"exam",{"id":106,"doc_module":4,"doc_module_name":45,"category_name":107,"show_sort_weight":108,"slug":109},5,"Comic",60,"comic",{"id":111,"doc_module":4,"doc_module_name":45,"category_name":112,"show_sort_weight":113,"slug":114},6,"Technology",50,"technology",{"id":116,"doc_module":4,"doc_module_name":45,"category_name":117,"show_sort_weight":118,"slug":119},7,"Healthcare",40,"healthcare",{"id":11,"doc_module":4,"doc_module_name":45,"category_name":12,"show_sort_weight":121,"slug":122},30,"research-report",{"id":124,"doc_module":4,"doc_module_name":45,"category_name":125,"show_sort_weight":126,"slug":127},9,"Religion & Spirituality",20,"religion-spirituality",{"id":126,"doc_module":4,"doc_module_name":45,"category_name":129,"show_sort_weight":126,"slug":130},"World Cup","world-cup",{"id":132,"doc_module":4,"doc_module_name":45,"category_name":133,"show_sort_weight":132,"slug":134},10,"Lifestyle","lifestyle",{"id":136,"doc_module":4,"doc_module_name":45,"category_name":137,"show_sort_weight":106,"slug":138},19,"General","general"]