[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-641309-105":3,"detail-sidebar-cat-0-en-105":80,"doc-detail-641309-en":130},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":73,"head_meta":75,"extra_data":77,"updated_unix":79},105,"en","york-yvaa-air-cooled-screw-liquid-chillers-installation-operation-maintenance-safety-guidelines-july-03-2024","YORK YVAA Air-Cooled Screw Liquid Chillers - Installation, Operation, Maintenance - Safety Guidelines - July 03, 2024","","Installation, operation, and maintenance guidance for YORK YVAA air-cooled screw liquid chillers with variable speed drive covers model YVAA Style A across frame sizes 015 to 052, 150 to 500 ton capacity, and 525 to 1750 kW. The document emphasizes general safety rules for rigging, installation, and servicing, requiring trained and qualified personnel, proper recognition of hazards, and safe handling of refrigerants and pressurized components. It also defines safety symbols, provides control-cabinet wiring restrictions, and outlines document revision notes and associated literature.",{"@graph":14,"@context":72},[15,34,55],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/document/","Document",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/document/technology/","Technology",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/document/york-yvaa-air-cooled-screw-liquid-chillers-installation-operation-maintenance-safety-guidelines-july-03-2024/641309/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/york-yvaa-air-cooled-screw-liquid-chillers-installation-operation-maintenance-safety-guidelines-july-03-2024/641309.png","ImageObject",300,407,{"name":42,"@type":43},"acoobca","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-10-26","2026-10-22",true,{"@type":52,"interactionType":53,"userInteractionCount":30},"InteractionCounter",{"@type":54},"ViewAction",{"@type":56,"mainEntity":57},"FAQPage",[58,64,68],{"name":59,"@type":60,"acceptedAnswer":61},"Who is authorized to perform rigging, installation, operation, and service on this chiller equipment?","Question",{"text":62,"@type":63},"The document states it is intended for owner-authorized rigging, installation, and operating/service personnel. These individuals must have independent training and must read and understand the on-product labels, this document, and any referenced materials.","Answer",{"name":65,"@type":60,"acceptedAnswer":66},"What wiring restrictions apply to the control cabinet and micro panel?",{"text":67,"@type":63},"External wiring must not be connected inside the control cabinet unless specified as an optional connection in the manufacturer’s product line. Devices such as relays, switches, transducers, and controls, and any external wiring, must not be installed inside the micro panel.",{"name":69,"@type":60,"acceptedAnswer":70},"How should technicians verify the document’s applicability to the specific equipment?",{"text":71,"@type":63},"Rigging, lifting, and operating/service personnel are responsible for verifying applicability. If there is any question, they should check whether the equipment has been modified and confirm current literature is available from the equipment owner.","https://schema.org",{"og:url":32,"og:type":74,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":76,"canonical":32},"index,follow",{"doc_id":78,"site_id":7},641309,1792865305,{"code":4,"msg":81,"data":82},"success",[83,87,91,95,100,104,109,114,119,122,126],{"id":22,"doc_module":4,"doc_module_name":25,"category_name":84,"show_sort_weight":85,"slug":86},"Story & Novel",90,"story-novel",{"id":26,"doc_module":4,"doc_module_name":25,"category_name":88,"show_sort_weight":89,"slug":90},"Literature",80,"literature",{"id":33,"doc_module":4,"doc_module_name":25,"category_name":92,"show_sort_weight":93,"slug":94},"Exam",70,"exam",{"id":96,"doc_module":4,"doc_module_name":25,"category_name":97,"show_sort_weight":98,"slug":99},5,"Comic",60,"comic",{"id":101,"doc_module":4,"doc_module_name":25,"category_name":29,"show_sort_weight":102,"slug":103},6,50,"technology",{"id":105,"doc_module":4,"doc_module_name":25,"category_name":106,"show_sort_weight":107,"slug":108},7,"Healthcare",40,"healthcare",{"id":110,"doc_module":4,"doc_module_name":25,"category_name":111,"show_sort_weight":112,"slug":113},8,"Research & Report",30,"research-report",{"id":115,"doc_module":4,"doc_module_name":25,"category_name":116,"show_sort_weight":117,"slug":118},9,"Religion & Spirituality",20,"religion-spirituality",{"id":117,"doc_module":4,"doc_module_name":25,"category_name":120,"show_sort_weight":117,"slug":121},"World Cup","world-cup",{"id":123,"doc_module":4,"doc_module_name":25,"category_name":124,"show_sort_weight":123,"slug":125},10,"Lifestyle","lifestyle",{"id":127,"doc_module":4,"doc_module_name":25,"category_name":128,"show_sort_weight":96,"slug":129},19,"General","general",{"code":4,"msg":81,"data":131},{"doc_id":78,"user_id":132,"nickname":42,"user_avatar":133,"doc_module":4,"category_id":101,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":30,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":139,"language":140,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":141,"faqs":142,"seo_title":143,"seo_description":12,"update_tm":144,"read_time":145},3985747870733,"https://ap-avatar.wpscdn.com/davatar_a8503ba1806abce46bf441b54a3ca4cd","| | Air-Cooled Screw Liquid Chillers |  |\n| --- | --- | --- |\n| Installation, Operation, Maintenance | Supersedes: 201.28-NM1 .1 (524) | Form 201.28-NM1 .1 (724) |\n\n035-23219-100  \nModel YVAA Style A  \nAir-Cooled Screw Liquid Chillers with Variable Speed Drive  \nFrame Sizes 015 to 052  \n150 ton to 500 ton  \n525 kW to 1750 kW Two Compressor  \n50 Hz and 60 Hz  \nR-134a or R-513A  \nIssue Date:  \nJuly 03, 2024  \nForm 201.28-NM1 .1 Issue date: 07/03/2024  \nImportant  \nRead before proceeding  \nGeneral safety guidelines  \nThis equipment is a relatively complicated apparatus. During rigging, installation, operation, maintenance, or service, individuals may be exposed to certain components or conditions including, but not limited to: heavy objects, refrigerants, materials under pressure, rotating components, and both high and low voltage. Each of these items has the potential, if misused or handled improperly, to cause bodily injury or death. It is the obligation and responsibility of rigging, installation, and operating/service personnel to identify and recognize these inherent hazards, protect themselves, and proceed safely in completing their tasks. Failure to comply with any of these requirements could result in serious damage to the equipment and the property in  \nwhich it is situated, as well as severe personal injury or death to themselves and people at the site.  \nThis document is intended for use by owner-authorized rigging, installation, and operating/service personnel. It is expected that these individuals possess independent training that will enable them to perform their assigned tasks properly and safely. It is essential that, prior to performing any task on this equipment, this individualshall have read and understood the on-product labels, this document and any referenced materials. This individual shall also be familiar with and comply with all applicable industry and governmental standards and regulations pertaining to the task in question.  \nSafety symbols  \nThe following symbols are used in this document to alert the reader to specific situations:  \nIndicates a possible hazardous situation which will result in death or serious injury if proper care is not taken.  \nIndicates a potentially hazardous situation which will result in possible injuries or damage to equipment if proper care isnot taken.  \nIdentifies a hazard which could lead to damage to the machine, damage to other equipment and/or environmental pollution if proper care is not taken or instructions and are not followed.  \nHighlights additional information useful to the technician in completing the work being performed properly.  \nExternal wiring, unless specified as an optional connection in the manufacturer’s product line, is not to be connected inside the control cabinet. Devices such as relays, switches, transducers and controlsand any external wiring must not be installed inside the micro panel. All wiring must be in accordance with Johnson Controls’published specifications and must be performed only by a qualified electrician. Johnson Controls will NOT be responsible for damage/problems resulting from improper connections to the controls or application of improper control signals. Failure to follow this warning will void the manufacturer’s warranty and cause serious damage to property or personal injury.  \n2 Johnson controls  \nForm 201.28-NM1 .1 Issue date: 07/03/2024  \nWorking with chiller vessels which are designed to contain contents under pressure must only be conducted by fully qualified technicians who have been certified in accordance with EPA Section 608 of the Clean Air Act requirements for the US or equivalently the Federal Halocarbon Regulations and the Refrigerant Code of Practice for Canada. This equipment is only intended for installation in locations that are not accessible to the general public. Further, this equipment is not intended for use by persons (including children) with reduced physical, sensory or mental capabilities, or lack ","cbCaieB1alenoGDA","https://ap.wps.com/l/cbCaieB1alenoGDA","pdf",7435810,198,"English","# General safety guidelines\n## Safety symbols\n## Wiring and control cabinet restrictions\n## Personnel qualifications and public-access limitations\n## Changeability of the document\n## Revision notes\n## Associated literature","[{\"question\":\"Who is authorized to perform rigging, installation, operation, and service on this chiller equipment?\",\"answer\":\"The document states it is intended for owner-authorized rigging, installation, and operating/service personnel. These individuals must have independent training and must read and understand the on-product labels, this document, and any referenced materials.\"},{\"question\":\"What wiring restrictions apply to the control cabinet and micro panel?\",\"answer\":\"External wiring must not be connected inside the control cabinet unless specified as an optional connection in the manufacturer’s product line. Devices such as relays, switches, transducers, and controls, and any external wiring, must not be installed inside the micro panel.\"},{\"question\":\"How should technicians verify the document’s applicability to the specific equipment?\",\"answer\":\"Rigging, lifting, and operating/service personnel are responsible for verifying applicability. If there is any question, they should check whether the equipment has been modified and confirm current literature is available from the equipment owner.\"}]","YORK YVAA Air-Cooled Screw Liquid Chillers - Installation, Operation, Maintenance - Safety Guidelines - July 03, 2024 | PDF",1792713508,499]