[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-detail-111744-en":3,"doc-seo-111744-105":30,"detail-sidebar-cat-0-en-105":91},{"code":4,"msg":5,"data":6},0,"success",{"doc_id":7,"user_id":8,"nickname":9,"user_avatar":10,"doc_module":4,"category_id":11,"category_name":12,"doc_title":13,"doc_description":14,"doc_content":15,"file_id":16,"file_url":17,"file_type":18,"file_size":19,"view_count":20,"is_deleted":4,"is_public":21,"is_downloadable":21,"audit_status":21,"page_count":22,"language":23,"language_code":24,"site_id":25,"html_lang":24,"table_of_contents":26,"faqs":27,"seo_title":13,"seo_description":14,"update_tm":28,"read_time":29},111744,1099514067438,"River Wang","https://ap-avatar.wpscdn.com/avatar/100002539ee87300030?x-image-process=image/resize,m_fixed,w_180,h_180&k=1780474512215547542",8,"Research & Report","World Bank Accountability Mechanism Dispute Resolution Service Follow-up Report - Case No. 21/01-DRS - Second Kampala Institutional and Infrastructure Development Project (KIIDP-2) in Uganda","World Bank Accountability Mechanism Dispute Resolution Service follow-up report reviews a dispute resolution process linked to the Second Kampala Institutional and Infrastructure Development Project (KIIDP-2) in Uganda (P133590). The case stems from concerns raised in a June 17, 2021 Request regarding Lubigi Channel works, including alleged forced evictions, risks in resettlement, exclusion from the 2017 Resettlement Action Plan, and claimed cumulative impacts. After Board approval, parties participated in a DRS-facilitated mediation from December 2021 to May 31, 2023, with follow-up of commitments until October 2025.","Public Disclosure Authorized Public Disclosure Authorized  \nWorld Bank Accountability Mechanism Dispute Resolution Service Follow-up Report: Case No. 21/01-DRS  \nThe Second Kampala Ins4tu4onal and Infrastructure Development Project (KIIDP-2) in UGANDA  \n(P133590)  \nOctober 24, 2025  \n1. SUMMARY OF REQUEST AND PROCESS  \nOn June 17, 2021, the Inspec4on Panel received a Request for Inspec4on regarding the Second Kampala Ins4tu4onal and Infrastructure Development Project (KIIDP-2 or the Project) in Uganda. The Request was submiRed by Witness Radio, a Uganda-based non-proﬁt and advocacy organiza4on, on behalf of community members living in the vicinity of the Project in Kawaala Zone II, Lubaga Division of Kampala. Shortly aYer the Request was submiRed, the Panel received an addi4onal seven signatures in support of it from Local Council (LC) leaders within the Project area. The Requesters asked for their iden44es to be kept conﬁden4al, and authorized Witness Radio and Accountability Counsel, a legal non-proﬁt organiza4on that supports communi4es around the world to protect their human rights and environment, to represent them.  \nThe Request raised several concerns regarding works undertaken on the Lubigi Channel that were ﬁnanced under KIIDP-2. Speciﬁcally, it raised concerns about forced evic4ons and issues related to the Project’s reseRlement process. These included allega4ons that aﬀected communi4es were excluded from the Project’s 2017 ReseRlement Ac4on Plan (RAP) and were rushed through an inadequate and coercive reseRlement process under a Supplementary RAP. The Requesters also raised concerns regarding the cumula4ve impacts of interven4ons within the KIIDP-2 area.  \nIn November 2021, following the World Bank Board of Executive Directors’ approval of the Inspection Panel’s recommendation to investigate the complaint, the Borrower and the Requesters (the Parties) agreed to participate in a voluntary dispute resolution process facilitated by the Dispute Resolution Service (DRS) . Between December 2021 and May 2023, the Parties engaged in dialogue aimed at addressing the issues raised in the complaint. In December 2022 the one-year process time limit for dispute resolution (DR) was extended for a period of six months at the request of the Parties. During this period, they reached a series of interim agreements and a final agreement, which was signed on May 31, 2023, in Kampala. On June 5, 2023, the Inspection Panel issued a memorandum closing the case.  \nAt the request of the Parties, DRS continued to follow up on the commitments undertaken as part of the mediation agreement until October 2025.  \n2. OVERVIEW OF DISPUTE RESOLUTION PROCESS  \na. Capacity building  \nIn December 2021, DRS convened a series of bilateral mee4ngs with the Par4es in Kampala to help them prepare for the media4on process. These early sessions focused on clarifying the Par4es’ needs and priori4es, their expecta4ons regarding the dispute resolu4on process, building a deeper understanding of the issues raised in the Request, and facilita4ng discussions on issues of representa4on, including the roles and responsibili4es of the Par4es within the process and community decision-making structures.  \nBeyond this early-stage capacity building, the media4on team con4nued to work with the Par4es throughout the dispute resolu4on process to address ongoing capacity needs related to the Par4es’ par4cipa4on in the process, and as they prepared to nego4ate par4cular issues. For example, the Par4es were par4cularly interested in learning how to shiY from their ini4alposi4ons to an explora4on of underlying needs and interests and how to present their needs in away that maintained their legi4macy in the process.  \nb. Selec4on of mediators  \nMediators were selected for the process in consultation with the Parties. DRS nominated several mediators based on their experience and local/regional expertise, and Parties were able to consider these candidates, and either consent to or r","cbCaite9h8bSAYD5","https://ap.wps.com/l/cbCaite9h8bSAYD5","pdf",264261,2,1,13,"English","en",105,"# Summary of Request and Process\n## Overview of Dispute Resolution Process\n### Capacity building\n### Selection of mediators\n### Establishing representation structures","[{\"question\":\"What dispute resolution case is covered in this follow-up report?\",\"answer\":\"The report covers the World Bank Accountability Mechanism Dispute Resolution Service follow-up for Case No. 21/01-DRS concerning the Second Kampala Institutional and Infrastructure Development Project (KIIDP-2) in Uganda.\"},{\"question\":\"What concerns were raised in the original Request about KIIDP-2?\",\"answer\":\"The Request raised concerns about works on the Lubigi Channel, including allegations of forced evictions and issues related to the resettlement process, such as exclusion from the 2017 Resettlement Action Plan and an inadequate or coercive process under a supplementary RAP.\"},{\"question\":\"How was the mediation process supported and extended over time?\",\"answer\":\"DRS convened capacity-building meetings, selected mediators in consultation with the Parties, and established representation structures through elected community representatives. The one-year dispute resolution time limit was extended by six months at the Parties’ request, and DRS continued follow-up on commitments until October 2025.\"}]",1784491522,33,{"code":4,"msg":31,"data":32},"ok",{"site_id":25,"language":24,"slug":33,"title":13,"keywords":34,"description":14,"schema_data":35,"social_meta":86,"head_meta":88,"extra_data":90,"updated_unix":28},"world-bank-accountability-mechanism-dispute-resolution-service-follow-up-report-case-no-2101-drs-second-kampala-institutional-and-infrastructure-development-project-kiidp-2-in-uganda","",{"@graph":36,"@context":85},[37,53,68],{"@type":38,"itemListElement":39},"BreadcrumbList",[40,44,47,50],{"item":41,"name":42,"@type":43,"position":21},"https://docshare.wps.com","Home","ListItem",{"item":45,"name":46,"@type":43,"position":20},"https://docshare.wps.com/document/","Document",{"item":48,"name":12,"@type":43,"position":49},"https://docshare.wps.com/document/research-report/",3,{"item":51,"name":13,"@type":43,"position":52},"https://docshare.wps.com/document/world-bank-accountability-mechanism-dispute-resolution-service-follow-up-report-case-no-2101-drs-second-kampala-institutional-and-infrastructure-development-project-kiidp-2-in-uganda/111744/",4,{"url":51,"name":13,"@type":54,"author":55,"headline":13,"publisher":57,"fileFormat":60,"inLanguage":24,"description":14,"dateModified":61,"datePublished":62,"encodingFormat":60,"isAccessibleForFree":63,"interactionStatistic":64},"DigitalDocument",{"name":9,"@type":56},"Person",{"url":41,"name":58,"@type":59},"DocShare","Organization","application/pdf","2026-07-24","2026-07-19",true,{"@type":65,"interactionType":66,"userInteractionCount":20},"InteractionCounter",{"@type":67},"ViewAction",{"@type":69,"mainEntity":70},"FAQPage",[71,77,81],{"name":72,"@type":73,"acceptedAnswer":74},"What dispute resolution case is covered in this follow-up report?","Question",{"text":75,"@type":76},"The report covers the World Bank Accountability Mechanism Dispute Resolution Service follow-up for Case No. 21/01-DRS concerning the Second Kampala Institutional and Infrastructure Development Project (KIIDP-2) in Uganda.","Answer",{"name":78,"@type":73,"acceptedAnswer":79},"What concerns were raised in the original Request about KIIDP-2?",{"text":80,"@type":76},"The Request raised concerns about works on the Lubigi Channel, including allegations of forced evictions and issues related to the resettlement process, such as exclusion from the 2017 Resettlement Action Plan and an inadequate or coercive process under a supplementary RAP.",{"name":82,"@type":73,"acceptedAnswer":83},"How was the mediation process supported and extended over time?",{"text":84,"@type":76},"DRS convened capacity-building meetings, selected mediators in consultation with the Parties, and established representation structures through elected community representatives. The one-year dispute resolution time limit was extended by six months at the Parties’ request, and DRS continued follow-up on commitments until October 2025.","https://schema.org",{"og:url":51,"og:type":87,"og:title":13,"og:site_name":58,"og:description":14},"article",{"robots":89,"canonical":51},"index,follow",{"doc_id":7,"site_id":25},{"code":4,"msg":5,"data":92},[93,97,101,105,110,115,120,123,128,131,135],{"id":21,"doc_module":4,"doc_module_name":46,"category_name":94,"show_sort_weight":95,"slug":96},"Story & Novel",90,"story-novel",{"id":20,"doc_module":4,"doc_module_name":46,"category_name":98,"show_sort_weight":99,"slug":100},"Literature",80,"literature",{"id":52,"doc_module":4,"doc_module_name":46,"category_name":102,"show_sort_weight":103,"slug":104},"Exam",70,"exam",{"id":106,"doc_module":4,"doc_module_name":46,"category_name":107,"show_sort_weight":108,"slug":109},5,"Comic",60,"comic",{"id":111,"doc_module":4,"doc_module_name":46,"category_name":112,"show_sort_weight":113,"slug":114},6,"Technology",50,"technology",{"id":116,"doc_module":4,"doc_module_name":46,"category_name":117,"show_sort_weight":118,"slug":119},7,"Healthcare",40,"healthcare",{"id":11,"doc_module":4,"doc_module_name":46,"category_name":12,"show_sort_weight":121,"slug":122},30,"research-report",{"id":124,"doc_module":4,"doc_module_name":46,"category_name":125,"show_sort_weight":126,"slug":127},9,"Religion & Spirituality",20,"religion-spirituality",{"id":126,"doc_module":4,"doc_module_name":46,"category_name":129,"show_sort_weight":126,"slug":130},"World Cup","world-cup",{"id":132,"doc_module":4,"doc_module_name":46,"category_name":133,"show_sort_weight":132,"slug":134},10,"Lifestyle","lifestyle",{"id":136,"doc_module":4,"doc_module_name":46,"category_name":137,"show_sort_weight":106,"slug":138},19,"General","general"]