[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-662591-105":59,"doc-detail-662591-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","working-drawings-checklist-march-4-2020","WORKING DRAWINGS CHECKLIST - March 4, 2020","","Working Drawings Checklist - March 4, 2020 provides a structured verification set for architectural working drawings, covering both existing and proposed elements across floor plans and elevations. It specifies checks for wall thickness, room dimensions, openings and positioning of doors and windows, roof lights, sanitary fittings, furniture and appliances, stairs and level changes, and correct north point and title box information. Additional items address services such as electrics and plumbing, roof construction and finishes, finished floor levels, wall finishes, and any other required features.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/working-drawings-checklist-march-4-2020/662591/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/working-drawings-checklist-march-4-2020/662591.png","ImageObject",300,407,{"name":92,"@type":93},"xXChrisXx","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-29","2026-10-28",true,{"@type":102,"interactionType":103,"userInteractionCount":34},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What must be verified on existing floor plans regarding walls and layouts?","Question",{"text":112,"@type":113},"Verify wall thickness/build-ups, wall lengths and room sizes with correct orientation, and ensure doors, windows/roof lights, and main structures are correctly shown according to surveys or prior plans.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"What items should be checked on existing elevations?",{"text":117,"@type":113},"Confirm elevations are titled correctly with the north point, structures are accurately shown, any stairs/ramps/handrails are represented, and the title box includes all required information.",{"name":119,"@type":110,"acceptedAnswer":120},"Which additional checks apply to proposed floor plans?",{"text":121,"@type":113},"Check that existing and proposed wall thicknesses/build-ups, dimensions, door/window references and compliance notes, replacement windows across drawings, fire-escape compliance, and relevant service and sanitary fitting details are included.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},662591,1793220568,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":34,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":34,"language":139,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":140,"faqs":141,"seo_title":142,"seo_description":67,"update_tm":129,"read_time":143},8796112263567,"https://ap-avatar.wpscdn.com/davatar_3d24733baf745e90a7e4bdd5f77d97b2","| Job Title: |\n| --- |\n| WORKING DRAWINGS CHECKLIST |\n\nWednesday 4 March 2020  \n\n| Drawing | Description | N/A | Yes |\n| --- | --- | --- | --- |\n| Existing Floor Plans | Are all existing wall thicknesses/build-up correctly shown (insulation, changes for stone or timber cldding etc.)? |  |  |\n|  | Do all wall lengths, room sizes & orientation on both internal & external walls match correctly according to existing surveyor any previous plans? |  |  |\n|  | Are all existing doors correctly specified, sized and positioned according to existing survey or any previous plans? |  |  |\n|  | Are all existing windows / roof lights correctly specified, sized, positioned and at the correct heights according to existing surveyor any previous plans? |  |  |\n|  | Are all the main existing structures e.g. Chimneys, Flues, stoves, built in presses etc. correctly shown on the plan? |  |  |\n|  | Are all existing sanitary fittings (Bath, bidets, sinks, w.c’s, showers, heated towel rails etc) correctly shown? |  |  |\n|  | Are all existing services, electrics(fuse boards, light switches, light fittings, plug sockets, smoke & carbon monoxide alarms etc), plumbing(radiators, S&VPs, RWPs, manholes, BIGTs, hot water cylinder etc) correctly shown on plan? |  |  |\n|  | Is all existing furniture (sofas, coffee tables, beds, side boards, units etc) correctly shown? |  |  |\n|  | Are all existing appliances (Fridges, cookers, washing machines, dryers etc) correctly shown? |  |  |\n|  | Are any stairs, steps, ramps or other changes in level correctly shown? |  |  |\n|  | Does the drawing have the North Point correctly shown? |  |  |\n|  | Does the drawing have the Title Box with all the correct information, (client name, address, date, drawing title, drawing reference number and scale) correctly shown? |  |  |\n| Existing Elevations | If drawn in 2d, are all the main components (walls, windows, doors, S&VPs, gutters, RWPs) specified correctly & positioned & lined up correctly from existing floor plans drawn? |  |  |\n|  | Are all existing electrics (external lights, meter boxes etc. ) correctly shown? |  |  |\n|  | Are all existing roofs with correct roof type (pitched, flat, mono pitched etc. ) with finishes (slate, tiles, trocal, zinc etc. ) clearly shown with existing eaves & ridge heights correct, soffit/eaves depth correct? Also if roof lights are correctly indicated? |  |  |\n|  | Are all Finished Floor Levels correctly shown? |  |  |\n|  | Are wall finishes correctly shown (stone or timber cladding, nap plaster etc.)? |  |  |\n|  | Are window openings, reveals, plaster bands required to be shown? |  |  |\n|  | Are any other features required to be shown? |  |  |\n\nMark Stephens Architects, Bridge St., Swinford, Co. Mayo  \n(: 094 925 2514 ): 085 159 4084 *: [info@markstephensarchitects.com](info@markstephensarchitects.com 1 of 7)[ 1 of 7](info@markstephensarchitects.com 1 of 7)  \n\n| Job Title: 0 |\n| --- |\n| WORKING DRAWINGS CHECKLIST |\n\nWednesday 4 March 2020  \n\n| Drawing | Description | N/A | Yes |\n| --- | --- | --- | --- |\n|  | Are all the elevations correctly titled in accordance with the existing North Point shown on plan? |  |  |\n|  | Are all the main existing & proposed structures e.g. Chimneys, Flues, stoves, built in presses, steel, steel posts, concrete pads etc. correctly shown on the plan? |  |  |\n|  | Are any existing stairs, steps, ramps, handrails or other changes in level correctly shown? |  |  |\n|  | Does the drawing have the Title Box with all the correct information, (client name, address, date, drawing title, drawing reference number and scale) correctly shown? |  |  |\n| Proposed Floor  Plans | Are all existing & proposed wall thicknesses/build-up correctly shown (insulation, wall finishes, changes for stone or timber cladding etc.) |  |  |\n|  | Do all existing & proposed wall lengths, room sizes & orientation on both internal & external walls match correctly according to existing survey, previous plans and also to new sketches or proposed plans (","cbCaifG5eIuYMQIa","https://ap.wps.com/l/cbCaifG5eIuYMQIa","pdf",704945,"English","# Existing Floor Plans\n## Existing Elevations\n# Proposed Floor Plans","[{\"question\":\"What must be verified on existing floor plans regarding walls and layouts?\",\"answer\":\"Verify wall thickness/build-ups, wall lengths and room sizes with correct orientation, and ensure doors, windows/roof lights, and main structures are correctly shown according to surveys or prior plans.\"},{\"question\":\"What items should be checked on existing elevations?\",\"answer\":\"Confirm elevations are titled correctly with the north point, structures are accurately shown, any stairs/ramps/handrails are represented, and the title box includes all required information.\"},{\"question\":\"Which additional checks apply to proposed floor plans?\",\"answer\":\"Check that existing and proposed wall thicknesses/build-ups, dimensions, door/window references and compliance notes, replacement windows across drawings, fire-escape compliance, and relevant service and sanitary fitting details are included.\"}]","WORKING DRAWINGS CHECKLIST - March 4, 2020 | PDF",18]