[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-202213-105":59,"doc-detail-202213-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","winchester-south-project-noise-and-vibration-assessment-additional-information","Winchester South Project - Noise and Vibration Assessment - Additional Information","","Updated noise and vibration impact assessment for the Winchester South Project, prepared as additional information. The assessment evaluates potential noise and vibration levels against relevant objectives and examines sensitive receptors potentially affected by project activities. It documents the existing noise and vibration environment at the nearest receptors, identifies fixed plant and mobile equipment for key mining stages, predicts noise and vibration at receptors, and provides recommendations for required noise control measures. The project context and receptor distances are summarized.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/winchester-south-project-noise-and-vibration-assessment-additional-information/202213/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/winchester-south-project-noise-and-vibration-assessment-additional-information/202213.png","ImageObject",300,407,{"name":92,"@type":93},"Evangeline","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-30","2026-09-04",true,{"@type":102,"interactionType":103,"userInteractionCount":52},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What is the purpose of this additional information report?","Question",{"text":112,"@type":113},"It updates the noise and vibration impact assessment for the Winchester South Project and evaluates potential noise and vibration levels against relevant objectives.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"Which elements does the assessment cover?",{"text":117,"@type":113},"It covers sensitive receptors, the existing noise and vibration environment, relevant objectives, equipment types and locations during key mining stages, predicted noise and vibration at receptors, and noise control recommendations.",{"name":119,"@type":110,"acceptedAnswer":120},"How are potential impacts evaluated spatially?",{"text":121,"@type":113},"The report considers distances from the project (e.g., to homesteads near the coal handling and preparation plant) to identify the nearest sensitive receptors and to assess predicted levels at those receptors.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},202213,1788543625,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":52,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":139,"language":140,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":141,"faqs":142,"seo_title":143,"seo_description":67,"update_tm":129,"read_time":144,"preview_page_count":4},13056703019662,"https://ap-avatar.wpscdn.com/avatar/be000253a8e92610077?_k=1778726343310543188","Attachment 14  \nAdditional InformationNoise and Vibration  \nWINCHESTER SOUTH PROJECT  \nEnvironmental Impact Statement  \nAdditional Information  \nWINCHESTER SOUTH PROJECT  \nNoise and Vibration Assessment  \n15 June 2022  \nWhitehaven WS Pty Ltd  \nQB758-06F01 Noise Vibration Report (r0) .docx  \nDocument details  \n\n| Detail | Reference |\n| --- | --- |\n| Doc reference: | QB758-06F01 Noise Vibration Report (r0) .docx |\n| Prepared for: | Whitehaven WS Pty Ltd |\n| Address: | Level 22, 12 Creek Street\u003Cbr>Brisbane QLD 4000 |\n| Attention: | Brendan Dillon |\n\nDocument control  \n| Date | Revision history | Non-issued revision | Issued\u003Cbr>revision | Prepared | Instructed | Reviewed /\u003Cbr>Authorised |\n| --- | --- | --- | --- | --- | --- | --- |\n| 20.04.2022 | Issued to Whitehaven WS |  | r0 | PJ | - | PJ |\n| 30.05.2022 | Issued to Whitehaven WS |  | r1 | PJ | - | PJ |\n| 09.06.2022 | Issued to Whitehaven WS |  | r2 | PJ | - | PJ |\n\n\n|  |\n| --- |\n|  |\n\nImportant Disclaimers:  \nThe work presented in this document was carried out in accordance with the Renzo Tonin & Associates Quality Assurance System, which is based on Australian/New Zealand Standard AS/NZS ISO 9001.  \nThis document is issued subject to review and authorisation by the suitably qualified and experienced person named in the last column above. If no name appears, this document shall be considered as preliminary or draft only and no reliance shall be placed upon it other than for information to be verified later.  \nThis document is prepared for the particular requirements of our Client referred to above in the ‘ Document details’ which are based on a specific brief with limitations as agreed to with the Client. It is not intended for and should not be relied upon by a third party and no responsibility is undertaken to any third party without prior consent provided by Renzo Tonin & Associates. The information herein should not be reproduced, presented or reviewed except in full. Prior to passing on to a third party, the Client is to fully inform the third party of the specific brief and limitations associated with the commission.  \nIn preparing this report, we have relied upon, and presumed accurate, any information (or confirmation of the absence thereof) provided by the Client and/or from other sources. Except as otherwise stated in the report, we have not attempted to verify the accuracy or completeness of any such information. If the information is subsequently determined to be false, inaccurate or incomplete then it is possible that our observations and conclusions as expressed in this report may change.  \nWe have derived data in this report from information sourced from the Client (if any) and/or available in the public domain at the time or times outlined in this report. The passage of time, manifestation of latent conditions or impacts of future events may require further examination and re-evaluation of the data, findings, observations and conclusions expressed in this report.  \nWe have prepared this report in accordance with the usual care and thoroughness of the consulting profession, for the sole purpose described above and by reference to applicable standards, guidelines, procedures and practices at the date of issue of this report. For the reasons outlined above, however, no other warranty or guarantee, whether expressed or implied, is made as to the data, observations and findings expressed in this report, to the extent permitted by law.  \nThe information contained herein is for the purpose of acoustics only. No claims are made and no liability is accepted in respect of design and construction issues falling outside of the specialist field of acoustics engineering including and not limited to structural integrity, fire rating, architectural buildability and fit-for-purpose, waterproofing and the like. Supplementary professional advice should be sought in respect of these issues.  \nExternal cladding disclaimer: No claims are made and no liability is accepted in respect o","cbCaieOP6Ik0mQs8","https://ap.wps.com/l/cbCaieOP6Ik0mQs8","pdf",22872093,125,"English","# Executive Summary\n## Assessment scope and objectives\n## Sensitive receptors and receptor locations\n## Existing environment\n## Equipment during mining stages\n## Predicted noise and vibration levels\n## Recommendations for noise control","[{\"question\":\"What is the purpose of this additional information report?\",\"answer\":\"It updates the noise and vibration impact assessment for the Winchester South Project and evaluates potential noise and vibration levels against relevant objectives.\"},{\"question\":\"Which elements does the assessment cover?\",\"answer\":\"It covers sensitive receptors, the existing noise and vibration environment, relevant objectives, equipment types and locations during key mining stages, predicted noise and vibration at receptors, and noise control recommendations.\"},{\"question\":\"How are potential impacts evaluated spatially?\",\"answer\":\"The report considers distances from the project (e.g., to homesteads near the coal handling and preparation plant) to identify the nearest sensitive receptors and to assess predicted levels at those receptors.\"}]","Winchester South Project - Noise and Vibration Assessment - Additional Information | PDF",315]