[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-361801-105":59,"doc-detail-361801-en":131},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":124,"head_meta":126,"extra_data":128,"updated_unix":130},105,"en","where-conduits-cross-building-expansion-joints-conduit-installation-requirements","Where conduits cross building expansion joints - conduit installation requirements","","Conduit installation requirements specify how to handle raceway transitions across building expansion joints using sliding or offsetting expansion fittings, and how to use bonding jumpers when bonding is not specifically approved. The instructions cover conduit support spacing limits, clearance for future additions, reaming and terminating with metallic insulated grounded throat bushings, and installing pull strings. Additional guidance addresses placement above finished floors, prohibition in wet or corrosive locations, embedding rules for masonry and concrete, and termination to cable trays and pull boxes.",{"@graph":69,"@context":123},[70,84,106],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/where-conduits-cross-building-expansion-joints-conduit-installation-requirements/361801/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/where-conduits-cross-building-expansion-joints-conduit-installation-requirements/361801.png","ImageObject",300,407,{"name":92,"@type":93},"Quinn Holloway","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-11-19","2026-09-23",true,{"@type":102,"interactionType":103,"userInteractionCount":105},"InteractionCounter",{"@type":104},"ViewAction",16,{"@type":107,"mainEntity":108},"FAQPage",[109,115,119],{"name":110,"@type":111,"acceptedAnswer":112},"How should conduits be handled at building expansion joints?","Question",{"text":113,"@type":114},"Use suitable sliding or offsetting expansion fittings. Unless specifically approved for bonding, use a suitable bonding jumper.","Answer",{"name":116,"@type":111,"acceptedAnswer":117},"What rules apply to supporting conduits?",{"text":118,"@type":114},"Provide anchors, hangers, supports, and clamps to support conduits from the structures where installed. Do not space supports farther apart than five feet, and support conduit within three feet of each outlet box, junction box, gutter, panel, or fitting.",{"name":120,"@type":111,"acceptedAnswer":121},"What are the embedding limits for conduits in masonry and concrete?",{"text":122,"@type":114},"For masonry embedding, embed conduit in the hollow core of the masonry and do not permit horizontal runs in the joint between masonry units. For concrete embedding, embed the conduit a minimum of two inches from the exterior of the concrete and do not place conduit in concrete less than 4 inches thick.","https://schema.org",{"og:url":83,"og:type":125,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":127,"canonical":83},"index,follow",{"doc_id":129,"site_id":62},361801,1790506826,{"code":4,"msg":5,"data":132},{"doc_id":129,"user_id":133,"nickname":92,"user_avatar":134,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":135,"file_id":136,"file_url":137,"file_type":138,"file_size":139,"view_count":105,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":140,"language":141,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":142,"faqs":143,"seo_title":144,"seo_description":67,"update_tm":145,"read_time":146,"preview_page_count":19,"preview_urls":147},2336474466712,"https://ap-avatar.wpscdn.com/davatar_a8503ba1806abce46bf441b54a3ca4cd","11)Where conduits cross building expansion joints,use suitable sliding oroffsetting expansion fittings.Unless specifically approved for bonding,use a suitable bonding jumper.  \n12)Support conduits:  \na)  Provide anchors,hangers,supports,clamps,etc.tosupport conduits from the structures in or on which they areinstalled.Do not space supports farther apart than five feet.  \nb)Provide sufficient clearance to allow conduit to be added toracks,hangers,etc.in the future.  \nc)Support conduit within three(3)feet of each outlet box,junction box,gutter,panel,fitting,etc.  \n13)Ream conduits to eliminate sharp edges and terminate with metallicinsulated grounded throat bushings.Seal each conduit afterinstallation(until cable is installed)with a removable mechanical-typeseal to keep conduits clean,dry and prevent foreign matter fromentering conduits.  \n14)Install a pull string in each conduit.  \n15)For conduits entering through the floor of a telecommunications room,terminate conduits 6”above the finished floor.  \n16)Do not install communications conduits in wet,hazardous or corrosivelocations.  \n17)Where conduit is shown embedded in masonry,embed conduit in thehollow core of the masonry.Horizontal runs in the joint betweenmasonry units are not permitted.  \n18)Where conduit is shown embedded in concrete,embed conduit aminimum of two inches from the exterior of the concrete.Do not placeconduit in concrete less than 4 inches thick.  \na)  One inch trade size conduit shall be used.Conduits sizedsmaller than one inch trade size conduit are not permittedembedded in concrete without approval from the Owner.  \nb)  Run conduit parallel to main reinforcement.  \nc)  Conduit crossovers in concrete are not permitted  \n19)Where conduit exits from grade or concrete,provide a rigid steelelbow and adapter.  \n20)Where conduit enters a space through the floor and terminates in thatspace,terminate the conduit at 6”above the finished floor.  \n21)Where conduits terminate at a cable tray,the conduits shall beconsistently terminated no more than 8”from the cable tray,and havea visually uniform appearance.  \n22)Where several circuits follow a common route,stagger pullboxes orfittings.  \n23)Where several circuits are shown grouped in one box,individuallyfireproof each conduit.  \n24)Bend and offset metal conduit with standard factory sweeps or conduitfittings.Keep legs of bends in the same plane and straight legs ofoffsets parallel,unless otherwise indicated.  \na)  Conduit Sweeps:  \n1)Sweeps shallexceed 90 degrees  \n2)Do not exceed 180 degrees for the sum total of conduitsweeps for a section of conduit(between conduittermination points).  \n3)Sweep radius shall be at least 10 times the internaldiameter of the conduit.  \n4)90-degree condulets (LB's)and electrical elbows arenot acceptable.  \nb)  Factory-manufactured sweeps are required for bends in  \nconduit larger than 1-/4\"trade size.  \nc)  For bends in 1 /4”trade size conduit and larger,field-manufactured bends (using a hydraulic bender with a 1/4”boot)are permitted only when factory-manufactured sweepsare not suitable for the conditions.In all other cases,factory-manufactured sweeps are required.\"Hickey-bender\"use isprohibited.  \n25)Connect conduit to enclosures,cabinets and boxes with doublelocknuts and with insulating type bushings.Use grounding typebushings where connecting to concentric or eccentric knockouts.Make conduit connections to enclosures at the nearest practicablepoint of entry to the enclosure area where the devices are located towhich the circuits contained in the conduit will connect.  \n26)Penetrations for raceways:  \na)Do not bore holes in floor and ceiling joists outside centerthird of member depth or within two feet of bearing points.Holes shall be 1-1”diameter maximum.  \nb)Penetrate finished walls and finished surfaces with a PVCor sheet metal sleeve with an interior diameter(ID)at least1/4\"greater than the outer diameter(OD)of the conduit,setflush with walls,pack with fiberglass,seal with silico","cbCait4y7VwwUvPM","https://ap.wps.com/l/cbCait4y7VwwUvPM","pdf",5151073,22,"English","# Conduit installation requirements\n## Expansion joints and bonding\n## Supports, clearance, and termination\n## Reaming, pull strings, and floor penetrations\n## Embedding in masonry and concrete\n## Bends, sweeps, and conduit fittings\n## Connections, sleeves, and sealing compounds","[{\"question\":\"How should conduits be handled at building expansion joints?\",\"answer\":\"Use suitable sliding or offsetting expansion fittings. Unless specifically approved for bonding, use a suitable bonding jumper.\"},{\"question\":\"What rules apply to supporting conduits?\",\"answer\":\"Provide anchors, hangers, supports, and clamps to support conduits from the structures where installed. Do not space supports farther apart than five feet, and support conduit within three feet of each outlet box, junction box, gutter, panel, or fitting.\"},{\"question\":\"What are the embedding limits for conduits in masonry and concrete?\",\"answer\":\"For masonry embedding, embed conduit in the hollow core of the masonry and do not permit horizontal runs in the joint between masonry units. For concrete embedding, embed the conduit a minimum of two inches from the exterior of the concrete and do not place conduit in concrete less than 4 inches thick.\"}]","Where conduits cross building expansion joints - conduit installation requirements | PDF",1790145611,55,[148,152,156,160],{"page_no":8,"url":149,"width":150,"height":151},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-16/fc67adfe2cdacf73b55a14dc11d206d7.webp",983,1272,{"page_no":14,"url":153,"width":154,"height":155},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-16/1309abe68f1a8ffe4548a3dcfb12636d.webp",982,1270,{"page_no":81,"url":157,"width":158,"height":159},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-16/cfb4a922bb351ea327a93d905634696f.webp",981,1269,{"page_no":19,"url":161,"width":162,"height":163},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-16/cf14a98b5cf29209e8dc7b23df5d9ac1.webp",980,1268]