[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-detail-210900-en":3,"doc-seo-210900-105":29,"detail-sidebar-cat-0-en-105":90},{"code":4,"msg":5,"data":6},0,"success",{"doc_id":7,"user_id":8,"nickname":9,"user_avatar":10,"doc_module":4,"category_id":11,"category_name":12,"doc_title":13,"doc_description":14,"doc_content":15,"file_id":16,"file_url":17,"file_type":18,"file_size":19,"view_count":20,"is_deleted":4,"is_public":20,"is_downloadable":20,"audit_status":20,"page_count":21,"language":22,"language_code":23,"site_id":24,"html_lang":23,"table_of_contents":25,"faqs":26,"seo_title":27,"seo_description":14,"update_tm":28,"read_time":11},210900,5909887254083,"\tWilliam","https://ap-avatar.wpscdn.com/davatar_276721f389ce27ea32af1340a28f341c",8,"Research & Report","Westbrook Connecticut HOC School Roof Committee Meeting Minutes - January 20, 2026","Meeting minutes from the TOWN OF WESTBROOK, CONNECTICUT HOC SCHOOL ROOF COMMITTEE (January 20, 2026) document attendance, an update on roof replacement planning, and budget estimates. The Garland Company Inc. provided cost figures for Daisy and Westbrook High School, including a phased approach for the high school roof and integration with HVAC replacement. The committee discussed verifying roof penetrations, coordinating solar array removal, and researching solar agreement terms and whether the array is paid for or guaranteed.","TOWN OF WESTBROOK,CONNECTICUTAD HOC SCHOOL ROOF COMMITTEEMINUTESTuesday,January 20,2026Mulvey Municipal CenterS.Conference Room  \n# CALL TO ORDER\n\nChairman Ehlert called the meeting to order at 6:00 pm.In attendance included:Chris Ehlert,Scott Hartzell,Karl Gelotte,John Riggio,Jeff Tindall,John Hall,and Chet Ososki  \nUPDATE ON ROOF COST-Daisy and Westbrook High School  \nJeff Tindall provided updated cost estimates for roofs at Daisy and Westbrook High School.These estimates were developed by The Garland Company Inc.  \n● Daisy -$2.1M to overlay the current roof.  \no This estimate is based on today's dollars and does not include future priceincreases on material and labor.  \no $2.1M is a placeholder for the BOE Capital Plan in for FY 2031/2032  \n● High School-totals $5.1M-chart attachedo estimate was broken into 3 phases  \n■ Phase 1$1.65M  \n■ Phase 2 $1.7M  \n■ Phase 3 $1.8M  \nCommittee members discussed the estimate and the approach with replacing the roof in phasesand agreed that at this time a 3 Phase approach made sense.In addition,HVAC replacementwill be included with the specific roof phases.  \nChairman Ehlert confirmed that the HS roof estimate is included in the BOE's 5-year Capital Planand Jeff Tindall confirmed that it is at $2M/year FY 2027/2028,2028/2029 and 2029/2030.  \nThe importance of ensuring roof penetrations are reviewed was stressed.This will help toeliminate any penetration prior to the installation of the replacement roof(s).  \nJeff Tindallreported that the solar array on the HS roof,installed to heat hot water,would needto be removed prior to roof replacement.  \nMr.Tindall will research the following:  \n● Is the array providing any benefit to the HS?  \n● Determine the terms of the Solar Agreement(with the help of the BOE Finance Office)  \n● Is the array paid for?  \n·Was there a guarantee of output from the array?  \no What are the terms of the agreement between the BOE and solar installer?  \n# DISCUSSION ON HIGH SCHOOL ROOF-next steps\n\nWhen the HVAC Committee determines the protocol for the HVAC project,further planning forthe roof replacement will be discussed.  \n# APPROVAL OF MINUTES\n\nKarl Gelotte made a motion to approve the minutes of the 9/30/25 Committee meeting asamended.ScottHartzell seconded the motion.The motion passed unanimously.  \nNote:proper spelling\"Tindall\"  \nNEXT MEETING DATE-TBD  \n# ADJOURNMENT\n\nADJOURNMENT  \nJohn Riggio made a motion to adjourn the meeting at 6:36 p.m.Karl Gellotte seconded themotion.The motion passed unanimously.  \nRespectfully submitted,  \nSuzanne HelchowskiExecutive Assistant  \n\n| SBrtion上  \u003Cbr>8ectian  \u003Cbr>2,101 af  \u003Cbr>15,200 af  \u003Cbr>a9cton H  \u003Cbr>7,00D af  \u003Cbr>9ectin P  \u003Cbr>1,200 ef  \u003Cbr>section A  \u003Cbr>15,000 sf  \u003Cbr>7,B00 sf  \u003Cbr>13RQ0 s  \u003Cbr>eoion M  \u003Cbr>1,300 Bf  \u003Cbr>Bactlan0  \u003Cbr>aBtTon N  \u003Cbr>ectian日  \u003Cbr>Bectlon F  \u003Cbr>8,400 Bf  \u003Cbr>8,4CJ f  \u003Cbr>socten M  \u003Cbr>5,500 sf  \u003Cbr>siction D  \u003Cbr>3,720 sf  \u003Cbr>Bection△  \u003Cbr>sectlen E  \u003Cbr>640 sf  \u003Cbr>800  \u003Cbr>200  \u003Cbr>-2]四0  \u003Cbr>2426-乙2  \u003Cbr>0  \u003Cbr>i.  \u003Cbr>.  \u003Cbr>粤4.8M-2025.2cZ6  \u003Cbr>土  \u003Cbr>1,65M  \u003Cbr>也  \u003Cbr>+1  \u003Cbr>1、子  \u003Cbr>专   |  |  |\n| --- | --- | --- |\n| =Phase1  \u003Cbr>□Phase片久  \u003Cbr>=Phase\\#3  \u003Cbr>340D   | E CARLAND CQMPANY INC.   |  |\n|  | \\#estbrook High School  \u003Cbr>Westbrcok,CT   |  |\n|  | 11-Q4-Q9   | ROOF AREk:92,115 sf.   |\n\ns","cbCaimgJ75k9hUUp","https://ap.wps.com/l/cbCaimgJ75k9hUUp","pdf",864676,1,3,"English","en",105,"# CALL TO ORDER\n# UPDATE ON ROOF COST\n## Daisy and Westbrook High School Estimates\n# DISCUSSION ON HIGH SCHOOL ROOF - next steps\n# APPROVAL OF MINUTES\n# NEXT MEETING DATE - TBD\n# ADJOURNMENT","[{\"question\":\"What roof cost estimates were discussed for Daisy and Westbrook High School?\",\"answer\":\"Jeff Tindall reported Daisy roof overlay costs of $2.1M and Westbrook High School total roof costs of $5.1M, broken into three phases ($1.65M, $1.7M, and $1.8M).\"},{\"question\":\"Why does the committee emphasize reviewing roof penetrations before replacement?\",\"answer\":\"Ensuring roof penetrations are reviewed helps eliminate any penetrations before installing the replacement roof(s).\"},{\"question\":\"What additional research is planned regarding the high school solar array?\",\"answer\":\"Mr. Tindall will research whether the array provides any benefit to the high school, the solar agreement terms (with BOE Finance Office help), whether the array is paid for, and whether there was an output guarantee and agreement terms between the BOE and the solar installer.\"}]","Westbrook Connecticut HOC School Roof Committee Meeting Minutes - January 20, 2026 | PDF",1788675919,{"code":4,"msg":30,"data":31},"ok",{"site_id":24,"language":23,"slug":32,"title":13,"keywords":33,"description":14,"schema_data":34,"social_meta":85,"head_meta":87,"extra_data":89,"updated_unix":28},"westbrook-connecticut-hoc-school-roof-committee-meeting-minutes-january-20-2026","",{"@graph":35,"@context":84},[36,52,67],{"@type":37,"itemListElement":38},"BreadcrumbList",[39,43,47,49],{"item":40,"name":41,"@type":42,"position":20},"https://docshare.wps.com","Home","ListItem",{"item":44,"name":45,"@type":42,"position":46},"https://docshare.wps.com/document/","Document",2,{"item":48,"name":12,"@type":42,"position":21},"https://docshare.wps.com/document/research-report/",{"item":50,"name":13,"@type":42,"position":51},"https://docshare.wps.com/document/westbrook-connecticut-hoc-school-roof-committee-meeting-minutes-january-20-2026/210900/",4,{"url":50,"name":13,"@type":53,"author":54,"headline":13,"publisher":56,"fileFormat":59,"inLanguage":23,"description":14,"dateModified":60,"datePublished":61,"encodingFormat":59,"isAccessibleForFree":62,"interactionStatistic":63},"DigitalDocument",{"name":9,"@type":55},"Person",{"url":40,"name":57,"@type":58},"DocShare","Organization","application/pdf","2026-09-11","2026-09-06",true,{"@type":64,"interactionType":65,"userInteractionCount":20},"InteractionCounter",{"@type":66},"ViewAction",{"@type":68,"mainEntity":69},"FAQPage",[70,76,80],{"name":71,"@type":72,"acceptedAnswer":73},"What roof cost estimates were discussed for Daisy and Westbrook High School?","Question",{"text":74,"@type":75},"Jeff Tindall reported Daisy roof overlay costs of $2.1M and Westbrook High School total roof costs of $5.1M, broken into three phases ($1.65M, $1.7M, and $1.8M).","Answer",{"name":77,"@type":72,"acceptedAnswer":78},"Why does the committee emphasize reviewing roof penetrations before replacement?",{"text":79,"@type":75},"Ensuring roof penetrations are reviewed helps eliminate any penetrations before installing the replacement roof(s).",{"name":81,"@type":72,"acceptedAnswer":82},"What additional research is planned regarding the high school solar array?",{"text":83,"@type":75},"Mr. Tindall will research whether the array provides any benefit to the high school, the solar agreement terms (with BOE Finance Office help), whether the array is paid for, and whether there was an output guarantee and agreement terms between the BOE and the solar installer.","https://schema.org",{"og:url":50,"og:type":86,"og:title":13,"og:site_name":57,"og:description":14},"article",{"robots":88,"canonical":50},"index,follow",{"doc_id":7,"site_id":24},{"code":4,"msg":5,"data":91},[92,96,100,104,109,114,119,122,127,130,134],{"id":20,"doc_module":4,"doc_module_name":45,"category_name":93,"show_sort_weight":94,"slug":95},"Story & Novel",90,"story-novel",{"id":46,"doc_module":4,"doc_module_name":45,"category_name":97,"show_sort_weight":98,"slug":99},"Literature",80,"literature",{"id":51,"doc_module":4,"doc_module_name":45,"category_name":101,"show_sort_weight":102,"slug":103},"Exam",70,"exam",{"id":105,"doc_module":4,"doc_module_name":45,"category_name":106,"show_sort_weight":107,"slug":108},5,"Comic",60,"comic",{"id":110,"doc_module":4,"doc_module_name":45,"category_name":111,"show_sort_weight":112,"slug":113},6,"Technology",50,"technology",{"id":115,"doc_module":4,"doc_module_name":45,"category_name":116,"show_sort_weight":117,"slug":118},7,"Healthcare",40,"healthcare",{"id":11,"doc_module":4,"doc_module_name":45,"category_name":12,"show_sort_weight":120,"slug":121},30,"research-report",{"id":123,"doc_module":4,"doc_module_name":45,"category_name":124,"show_sort_weight":125,"slug":126},9,"Religion & Spirituality",20,"religion-spirituality",{"id":125,"doc_module":4,"doc_module_name":45,"category_name":128,"show_sort_weight":125,"slug":129},"World Cup","world-cup",{"id":131,"doc_module":4,"doc_module_name":45,"category_name":132,"show_sort_weight":131,"slug":133},10,"Lifestyle","lifestyle",{"id":135,"doc_module":4,"doc_module_name":45,"category_name":136,"show_sort_weight":105,"slug":137},19,"General","general"]