[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-390356-105":59,"doc-detail-390356-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","west-virginia-et-al-v-environmental-protection-agency-et-al-certiorari-no-20-1530-decided-june-30-2022","WEST VIRGINIA ET AL. v. ENVIRONMENTAL PROTECTION AGENCY ET AL. - CERTIORARI - No. 20-1530 - Decided June 30, 2022","","United States Supreme Court syllabus for WEST VIRGINIA ET AL. v. ENVIRONMENTAL PROTECTION AGENCY ET AL., certiorari to the D.C. Circuit, No. 20–1530. It explains EPA’s Clean Power Plan under Clean Air Act Section 111(d), defining the BSER as the best system of emissions reduction and converting it into operational limits through “building blocks” of efficiency improvements and grid-level generation shifting. The text recounts EPA’s methodology, projected outcomes, subsequent stay and repeal, and the statutory-interpretation issues driving the major questions doctrine analysis.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/west-virginia-et-al-v-environmental-protection-agency-et-al-certiorari-no-20-1530-decided-june-30-2022/390356/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/west-virginia-et-al-v-environmental-protection-agency-et-al-certiorari-no-20-1530-decided-june-30-2022/390356.png","ImageObject",300,407,{"name":92,"@type":93},"Theodore","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-11-23","2026-09-25",true,{"@type":102,"interactionType":103,"userInteractionCount":39},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What role does Section 111(d) of the Clean Air Act play in the Clean Power Plan?","Question",{"text":112,"@type":113},"It provides authority for regulating certain pollutants from existing sources. Under 111(d), EPA determines an emissions limit by identifying the BSER and translating it into an operational limit States enforce.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"How did EPA define the BSER for existing coal and natural gas plants in the Clean Power Plan?",{"text":117,"@type":113},"EPA included “building blocks” combining source-specific heat rate improvements and grid-level “generation shifting.” The latter moved electricity production from coal plants toward natural-gas plants, and then toward renewables.",{"name":119,"@type":110,"acceptedAnswer":120},"Why was the Clean Power Plan eventually repealed after being stayed in 2016?",{"text":121,"@type":113},"After the Court stayed the rule in 2016, EPA later found it exceeded statutory authority under Section 111(d). EPA concluded the Plan relied on a grid-level generation shift rather than facility-level equipment and practices.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},390356,1790369884,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":39,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":139,"language":140,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":141,"faqs":142,"seo_title":143,"seo_description":67,"update_tm":144,"read_time":145,"preview_page_count":44,"preview_urls":146},7971461740886,"https://ap-avatar.wpscdn.com/davatar_3d24733baf745e90a7e4bdd5f77d97b2","Syllabus  \nNOTE: Where it is feasible, a syllabus (headnote) will be released, as is being done in connection with this case, at the time the opinion is issued. The syllabus constitutes no part of the opinion of the Court but has been prepared by the Reporter of Decisions for the convenience of the reader.  \nSee United States v. Detroit Timber & Lumber Co., 200 U. S. 321, 337.  \nSUPREME COURT OF THE UNITED STATES  \nSyllabus  \nWEST VIRGINIA ET AL. v. ENVIRONMENTAL PROTECTION AGENCY ET AL.  \nCERTIORARI TO THE UNITED STATES COURT OF APPEALS FOR THE DISTRICT OF COLUMBIA CIRCUIT  \nNo. 20–1530. Argued February 28, 2022—Decided June 30, 2022*  \nIn 2015, the Environmental Protection Agency (EPA) promulgated the Clean Power Plan rule, which addressed carbon dioxide emissions from existing coal-and natural-gas-fired power plants. For authority, the Agency cited Section 111 of the Clean Air Act, which, although known as the New Source Performance Standards program, also authorizes regulation of certain pollutants from existing sources under Section 111(d) . 42 U. S. C. §7411(d) . Prior to the Clean Power Plan, EPA had used Section 111(d) only a handful of times since its enactment in 1970. Under that provision, although the States set the actual enforceable rules governing existing sources (such as power plants), EPA determines the emissions limit with which they will have to comply. The Agency derives that limit by determining the “best system of emission reduction   that has been adequately demonstrated,” or the BSER, for the kind of existing source at issue. §7411(a)(1) . The limit then reflects the amount of pollution reduction “achievable through the application of” that system. Ibid.  \nIn the Clean Power Plan, EPA determined that the BSER for existing coal and natural gas plants included three types of measures, which the Agency called “building blocks.” 80 Fed. Reg. 64667. The first building block was “heat rate improvements” at coal-fired plants—essentially practices such plants could undertake to burn coal  \n* Together with No. 20–1531, North American Coal Corp. v. Environmental Protection Agency et al., No. 20–1778, Westmoreland Mining Holdings LLC v. Environmental Protection Agency et al., and No. 20– 1780, North Dakota v. Environmental Protection Agency et al., also oncertiorari to the same court.  \nSyllabus  \nmore cleanly. Id., at 64727. This sort of source-specific, efficiencyimproving measure was similar in kind to those that EPA had previously identified as the BSER in other Section 111 rules.  \nBuilding blocks two and three were quite different, as both involved what EPA called “generation shifting” at the grid level—i.e., a shift in electricity production from higher-emitting to lower-emitting producers. Building block two was a shift in generation from existing coalfired power plants, which would make less power, to natural-gas-fired plants, which would make more. Ibid. This would reduce carbon dioxide emissions because natural gas plants produce less carbon dioxide per unit of electricity generated than coal plants. Building block three worked like building block two, except that the shift was from both coal and gas plants to renewables, mostly wind and solar. Id., at 64729, 64748. The Agency explained that, to implement the needed shift in generation to cleaner sources, an operator could reduce the regulated plant’s own production of electricity, build or invest in a new or existing natural gas plant, wind farm, or solar installation, or purchase emission allowances or credits as part of a cap-and-trade regime. Id., at 64731–64732. Taking any of these steps would implement a sectorwide shift in electricity production from coal to natural gas and renewables. Id., at 64731.  \nHaving decided that the BSER was one that would reduce carbon pollution mostly by moving production to cleaner sources, EPA then set about determining “the degree of emission limitation achievable through the application” of that system. §7411(a)(","cbCail8XiwdzOKem","https://ap.wps.com/l/cbCail8XiwdzOKem","pdf",435009,89,"English","# Case Overview\n## Legal Framework and BSER\n## Clean Power Plan Building Blocks\n## EPA’s Emissions Limit Methodology\n## Stay, Repeal, and Major Questions Doctrine","[{\"question\":\"What role does Section 111(d) of the Clean Air Act play in the Clean Power Plan?\",\"answer\":\"It provides authority for regulating certain pollutants from existing sources. Under 111(d), EPA determines an emissions limit by identifying the BSER and translating it into an operational limit States enforce.\"},{\"question\":\"How did EPA define the BSER for existing coal and natural gas plants in the Clean Power Plan?\",\"answer\":\"EPA included “building blocks” combining source-specific heat rate improvements and grid-level “generation shifting.” The latter moved electricity production from coal plants toward natural-gas plants, and then toward renewables.\"},{\"question\":\"Why was the Clean Power Plan eventually repealed after being stayed in 2016?\",\"answer\":\"After the Court stayed the rule in 2016, EPA later found it exceeded statutory authority under Section 111(d). EPA concluded the Plan relied on a grid-level generation shift rather than facility-level equipment and practices.\"}]","WEST VIRGINIA ET AL. v. ENVIRONMENTAL PROTECTION AGENCY ET AL. - CERTIORARI - No. 20-1530 - Decided June 30, 2022 | PDF",1790333254,224,[147,151,155,159,163,167,171,175,179],{"page_no":8,"url":148,"width":149,"height":150},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-16/c5370a4fffb365a329fcca9043b3fc1b.webp",983,1272,{"page_no":14,"url":152,"width":153,"height":154},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-16/72f015e6e2fcfa8a882a8e56738a2458.webp",982,1270,{"page_no":81,"url":156,"width":157,"height":158},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-16/651c515b8eb296c7afd756ea76615d93.webp",981,1269,{"page_no":19,"url":160,"width":161,"height":162},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-16/2889684286153abaff3373051652ab78.webp",980,1268,{"page_no":24,"url":164,"width":165,"height":166},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-16/447980200f34cf8214e033cda4d5b86c.webp",979,1267,{"page_no":29,"url":168,"width":169,"height":170},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-16/a2635dcacc0bf8b3085b8990ec2016db.webp",978,1265,{"page_no":34,"url":172,"width":173,"height":174},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-16/ad74b9d99cecf369a2813b4d8f719ae7.webp",977,1264,{"page_no":39,"url":176,"width":177,"height":178},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-16/992a5996d57527218f55dee1c4b08784.webp",976,1263,{"page_no":44,"url":180,"width":181,"height":182},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-16/94d764537b7d6049ac677e0365165965.webp",975,1261]