[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-405144-105":59,"doc-detail-405144-en":131},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":124,"head_meta":126,"extra_data":128,"updated_unix":130},105,"en","west-lake-grove-exterior-paint-scope-of-work","West Lake Grove - Exterior Paint Scope of Work","","This document outlines the professional exterior painting requirements for the West Lake Grove residential development project in Lake Oswego, Oregon. The scope covers the new construction of 23 townhomes across 6 buildings, scheduled for winter 2026. The contractor is responsible for ordering materials through the designated supplier, supplying supplementary materials, and providing labor for two coats of paint on all exterior surfaces. Key responsibilities include masking finish surfaces, maintaining a clean workspace, addressing winter conditions with protective plastic, and conducting precise touch-ups for doors and gutters. All operations must align with manufacturer instructions and project specifications, with coordination overseen by the Habitat Superintendent. The project emphasizes thorough preparation including pressure washing and specific sequencing relative to gutter and siding installation to ensure a high-quality finish.",{"@graph":69,"@context":123},[70,84,106],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/west-lake-grove-exterior-paint-scope-of-work/405144/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/west-lake-grove-exterior-paint-scope-of-work/405144.png","ImageObject",300,407,{"name":92,"@type":93},"dabgoudw","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-11-28","2026-09-28",true,{"@type":102,"interactionType":103,"userInteractionCount":105},"InteractionCounter",{"@type":104},"ViewAction",11,{"@type":107,"mainEntity":108},"FAQPage",[109,115,119],{"name":110,"@type":111,"acceptedAnswer":112},"What are the specific exterior painting requirements for the West Lake Grove project?","Question",{"text":113,"@type":114},"The project requires painting all exterior surfaces with two coats of paint, including prep work like pressure washing, masking finish surfaces, and touch-ups on door slabs, gutters, and downspouts.","Answer",{"name":116,"@type":111,"acceptedAnswer":117},"Who is the designated paint supplier for this project?",{"text":118,"@type":114},"The contractor is required to order all paint through the Powell Paint Center using the Habitat for Humanity account.",{"name":120,"@type":111,"acceptedAnswer":121},"What is the deadline for submitting the project bid?",{"text":122,"@type":114},"The bid for the exterior paint work is due by July 11th, 2025, at 5:00 PM.","https://schema.org",{"og:url":83,"og:type":125,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":127,"canonical":83},"index,follow",{"doc_id":129,"site_id":62},405144,1790877907,{"code":4,"msg":5,"data":132},{"doc_id":129,"user_id":133,"nickname":92,"user_avatar":134,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":135,"file_id":136,"file_url":137,"file_type":138,"file_size":139,"view_count":105,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":14,"language":140,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":141,"faqs":142,"seo_title":143,"seo_description":67,"update_tm":144,"read_time":24,"preview_page_count":14,"preview_urls":145},3985747860484,"https://ap-avatar.wpscdn.com/davatar_276721f389ce27ea32af1340a28f341c","Scope of Work  \nPROJECT NAME: West Lake Grove  \nPROJECT LOCATION: 16858 Boones Ferry Rd., Lake Oswego, OR 97035  \nPROJECT DESCRIPTION: New construction of 23 townhomes/6 buildings  \nSCOPE OF WORK: Exterior Paint  \nDATE OF WORK: Winter/Jan 2026  \nBID DUE DATE: July 11th, 2025 by 5p  \nScope of Work:  \n• Schedule  \no Anticipated Start: Jan 2026  \no Duration: TBD  \no Actual dates to be communicated by Habitat Superintendent  \n• Scope  \no Materials:  \n-Contractor to order paint through Powell Paint Center on Habitat's account.  \n-Contractor to supply all additional materials.  \no Installation:  \n-Provide all labor to paint all exterior surfaces with two coats of paint.  \n-Contractor to mask all finish surfaces.  \n-Contractor to remove all masking and leave work area clean and clear of any trash / debris.  \n-Contractor to remove any overspray or drips.  \n-All work to be done according to project specifications and manufacturer’s instructions.  \n-Include pricing for setting up plastic to allow for painting during winter conditions.  \n• Mobilization:  \no 1-Exterior prep including pressure wash, then paint after siding is complete and before gutters  \nare installed.  \no 2-Exterior paint touch ups, exterior door slabs/gutters/downspouts (timing will be communicated by Habitat superintendent) .","cbCaiqGqAxSv8u2j","https://ap.wps.com/l/cbCaiqGqAxSv8u2j","pdf",192831,"English","# Schedule\n# Scope\n## Materials\n## Installation\n# Mobilization","[{\"question\":\"What are the specific exterior painting requirements for the West Lake Grove project?\",\"answer\":\"The project requires painting all exterior surfaces with two coats of paint, including prep work like pressure washing, masking finish surfaces, and touch-ups on door slabs, gutters, and downspouts.\"},{\"question\":\"Who is the designated paint supplier for this project?\",\"answer\":\"The contractor is required to order all paint through the Powell Paint Center using the Habitat for Humanity account.\"},{\"question\":\"What is the deadline for submitting the project bid?\",\"answer\":\"The bid for the exterior paint work is due by July 11th, 2025, at 5:00 PM.\"}]","West Lake Grove - Exterior Paint Scope of Work | PDF",1790554740,[146,150],{"page_no":8,"url":147,"width":148,"height":149},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-16/998a2cc0963fb7958073f43c62867dcf.webp",983,1272,{"page_no":14,"url":151,"width":152,"height":153},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-16/e4000e724c7e9da496fee58728f4a9c1.webp",982,1270]