[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-665016-105":59,"doc-detail-665016-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","weigh-bridge-estimate-of-civil-construction-work-of-weigh-bridge","WEIGH% BRIDGE - Estimate of Civil Construction Work of Weigh Bridge","","Estimate document for civil construction of a weigh bridge for Sonhira Agro Farmer Producer Company Limited at Mohityanche Vadgaon, Tal-Kadegaon, Dist-Sangli, including GSTIN details. The BOQ covers column and foundation lining layout, excavation for foundations in hard murum and boulders and in soft rock/old cement or lime masonry, and plain cement concrete for foundation bedding. It further includes murum filling in specified lift layers, reinforced cement concrete items for foundations, columns, beams and lintels, padadi, and RCC slabs/landings, plus reinforcement quantities and masonry work in the super structure.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/weigh-bridge-estimate-of-civil-construction-work-of-weigh-bridge/665016/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/weigh-bridge-estimate-of-civil-construction-work-of-weigh-bridge/665016.png","ImageObject",300,407,{"name":92,"@type":93},"SANS","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-30","2026-10-29",true,{"@type":102,"interactionType":103,"userInteractionCount":8},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What is the document’s purpose and project location?","Question",{"text":112,"@type":113},"It provides an estimate for civil construction work for a weigh bridge for Sonhira Agro Farmer Producer Company Limited, located at Mohityanche Vadgaon, Tal-Kadegaon, Dist-Sangli.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"Which foundation construction activities are included in the estimate?",{"text":117,"@type":113},"The estimate includes lining out the structure for columns, footing and foundations, excavation for foundations in hard and soft strata, preparing the bed, backfilling, dewatering, and providing plain cement concrete for foundation bedding.",{"name":119,"@type":110,"acceptedAnswer":120},"What major concrete and reinforcement works are listed?",{"text":121,"@type":113},"It lists plain cement concrete and reinforced cement concrete works (M-10 and M-25 grades) for foundations, columns, beams and lintels, RCC padadi, slabs and landings, and includes RCC reinforcement quantity and TMT bar reinforcement details.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},665016,1793285657,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":8,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":19,"language":139,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":66,"faqs":140,"seo_title":141,"seo_description":67,"update_tm":129,"read_time":52},962090760505,"https://ap-avatar.wpscdn.com/davatar_155a257f0dc6eb9ab79c44ca47cae57d","ESTIMATE OF CIVIL CONSTRUCTION WORK OF WEIGH BRIDGE FOR SONHIRA AGRO FARMER PRODUCER COMPANY LIMITED, Mohityanche Vadgaon, Tal:-Kadegaon, Dist:-Sangli.GSTIN NO.27ABCCS7381N1ZN  \n\n| Sr. No. | Quantity | Item | Rate | Per | Amount |\n| --- | --- | --- | --- | --- | --- |\n| A |  | Lining out the structure for columns, footing & foundations fixing the centerline as per plan necessary material such as iron pegs, constructing permanent semi permanent pillers etc. as directed by Engineers, completed |  |  |  |\n| B | Job | EXCAVATION | 10001.00 | L/s. | 10001.00 |\n| B-1 |  | Excavation for foundation in hard murum and boulders including removing the excavated materials upto distance of 50 metres beyond the building area and stacking and spreading as directed, dewatering, preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 1.50 m to 3.0 m) By Mechanical Means Spec. No.:\u003Cbr>Bd.A.2 Page No. 259 |  |  |  |\n| B-2 | 90.00 | Excavation for foundation in Soft rock and old cement or | 305.55 | Cum | 27499.50 |\n|  | 55.00 | lime masonry foundations including removing the excavated material upto a distance of 50 metres beyond the building area and stacking as directed, including dewatering, preparing the bed for the foundation and necessary back filling with available earth/murum, ramming,watering including shoring and strutting etc. complete. (Lift from1.5m To 3.0 m.) By Mechanical Means Spec. No.: Bd.A.4 Page No. 259 | 514.50 | Cum | 28297.50 |\n| C |  | PLAIN CEMENT CONCRETE\u003Cbr>Providing and laying Cast in situ/Ready Mix cement concrete in M-10 o f trap/ granite/ quartzite/ gneiss metal for foundation and bedding i ncluding bailing out water, Steel centering, formwork ,laying/pumping, compacting, roughening them if special finish is to be provided, finishing if required and curing complete, with fully automatic micro processor based PLC with SCADA enabled reversible Drum Type mixer/concret e Batch mix plan t (Pan mixer) etc. complete. With fine aggregate (Crushed sand VSI Grade)Bd. E. 1 Page No. 287 |  |  |  |\n| C-1 | 3.50 | 1:03:06 | 6434.54 | Cum | 22520.89 |\n\n\n| Sr. No. | Quantity | Item | Rate | Per | Amount |\n| --- | --- | --- | --- | --- | --- |\n| E |  | MURUM FILLING |  |  |  |\n| E-1 | 16.00 | Filling in plinth and floors with approved excavated material in [15cm. to](15cm. to) 20cm. layers including watering and compacting etc. complete.. Bd.A.10 Page No. 262 | 118.65 | Cum | 1898.40 |\n| F |  | REINFORCED CEMENT CONCRETE |  |  |  |\n| F-1 |  | Providing and laying Cast in situ/Ready Mix cement concrete M-25 of trap / granite /quartzite/ gneiss metal for\u003Cbr>R.C.C. work in foundations like\u003Cbr>raft, strip foundations, grillage and footings of\u003Cbr>R.C.C. columns and steel stanchions etc. including bailing out water, Steel centering, formwork, cover blocks, laying /pumping, compaction and curing roughening the surface if special finish is to be provided (Excluding reinforcement and structural steel) etc. complete. Spec. No.: Bd.F.3 Page No. 298 and B.7, Page No.38 |  |  |  |\n| F-2 | 4.50 | Providing and laying Cast in situ/Ready Mix cement concrete M-25 of trap / granite /quartzite/ gneiss metal for\u003Cbr>R.C.C. columns as per detailed designs and drawings or as directed including steel centering,formwork, cover blocks, laying/ pumping, compaction finishing the formed surfaces with cement mortar 1:3 of sufficient minimum | 7782.55 | Cum | 35021.48 |\n|  | 1.80 | thickness to give a smooth and even surface or roughening if special finish is to be provided and curing etc. complete.(Excluding reinforcement and structural steel) . Spec.\u003Cbr>No.:Bd.F.5 Page No. 300 and B-7,Page No 38. | 14419.60 | Cum | 25955.28 |\n| F-3 | 3.50 | Providing and laying Cast in situ/Ready Mix cement concrete in M-25 of trap/ granite/ quartzite/ gneiss metal for R.C.C. beams and lintels as per detailed designs and drawings or as directed including steel centering, formwork, cover blocks,","cbCaijakcX0WjCt2","https://ap.wps.com/l/cbCaijakcX0WjCt2","pdf",225186,"English","[{\"question\":\"What is the document’s purpose and project location?\",\"answer\":\"It provides an estimate for civil construction work for a weigh bridge for Sonhira Agro Farmer Producer Company Limited, located at Mohityanche Vadgaon, Tal-Kadegaon, Dist-Sangli.\"},{\"question\":\"Which foundation construction activities are included in the estimate?\",\"answer\":\"The estimate includes lining out the structure for columns, footing and foundations, excavation for foundations in hard and soft strata, preparing the bed, backfilling, dewatering, and providing plain cement concrete for foundation bedding.\"},{\"question\":\"What major concrete and reinforcement works are listed?\",\"answer\":\"It lists plain cement concrete and reinforced cement concrete works (M-10 and M-25 grades) for foundations, columns, beams and lintels, RCC padadi, slabs and landings, and includes RCC reinforcement quantity and TMT bar reinforcement details.\"}]","WEIGH% BRIDGE - Estimate of Civil Construction Work of Weigh Bridge | PDF"]