[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-seo-665036-105":3,"detail-sidebar-cat-0-en-105":81,"doc-detail-665036-en":130},{"code":4,"msg":5,"data":6},0,"ok",{"site_id":7,"language":8,"slug":9,"title":10,"keywords":11,"description":12,"schema_data":13,"social_meta":74,"head_meta":76,"extra_data":78,"updated_unix":80},105,"en","warehouse-building-civil-work-measurement-sheet-excavation-and-earth-work","Warehouse Building Civil Work Measurement Sheet - Excavation and Earth Work","","Detailed cost and measurement records for a warehouse building project under Tumsar Farmers Producer Company Limited. The summary lists major expense heads such as building work, electric work, royalty charges, and lab testing, with the total project cost provided. The document further includes an itemized measurement sheet for individual civil work tasks, beginning with excavation for foundations by manual means, followed by soling, plinth and floor filling with approved or contractor materials, and earthwork embankment/leveling specifications with quantities and units.",{"@graph":14,"@context":73},[15,34,56],{"@type":16,"itemListElement":17},"BreadcrumbList",[18,23,27,31],{"item":19,"name":20,"@type":21,"position":22},"https://docshare.wps.com","Home","ListItem",1,{"item":24,"name":25,"@type":21,"position":26},"https://docshare.wps.com/document/","Document",2,{"item":28,"name":29,"@type":21,"position":30},"https://docshare.wps.com/document/research-report/","Research & Report",3,{"item":32,"name":10,"@type":21,"position":33},"https://docshare.wps.com/document/warehouse-building-civil-work-measurement-sheet-excavation-and-earth-work/665036/",4,{"url":32,"name":10,"@type":35,"image":36,"author":41,"headline":10,"publisher":44,"fileFormat":47,"inLanguage":8,"description":12,"dateModified":48,"datePublished":49,"encodingFormat":47,"isAccessibleForFree":50,"interactionStatistic":51},"DigitalDocument",{"url":37,"@type":38,"width":39,"height":40},"https://docshare.wps.com/thumbnails/warehouse-building-civil-work-measurement-sheet-excavation-and-earth-work/665036.png","ImageObject",300,407,{"name":42,"@type":43},"The weather in my hometown","Person",{"url":19,"name":45,"@type":46},"DocShare","Organization","application/pdf","2026-10-30","2026-10-29",true,{"@type":52,"interactionType":53,"userInteractionCount":55},"InteractionCounter",{"@type":54},"ViewAction",5,{"@type":57,"mainEntity":58},"FAQPage",[59,65,69],{"name":60,"@type":61,"acceptedAnswer":62},"What are the main cost heads listed in the general abstract summary?","Question",{"text":63,"@type":64},"The summary includes building work, electric work, royalty charges, and lab testing charges. A total cost of the project is also provided.","Answer",{"name":66,"@type":61,"acceptedAnswer":67},"Which items are included at the start of the warehouse civil work measurement sheet?",{"text":68,"@type":64},"It begins with excavation for foundations by manual means, then moves to providing soling, filling in plinth and floors, and related backfilling measurements.",{"name":70,"@type":61,"acceptedAnswer":71},"How are quantities typically represented for each civil work item?",{"text":72,"@type":64},"Each item provides a description and measurement parameters (such as number, length, breadth, depth/height) along with the calculated quantity and unit (e.g., CUM).","https://schema.org",{"og:url":32,"og:type":75,"og:title":10,"og:site_name":45,"og:description":12},"article",{"robots":77,"canonical":32},"index,follow",{"doc_id":79,"site_id":7},665036,1793286676,{"code":4,"msg":82,"data":83},"success",[84,88,92,96,100,105,110,114,119,122,126],{"id":22,"doc_module":4,"doc_module_name":25,"category_name":85,"show_sort_weight":86,"slug":87},"Story & Novel",90,"story-novel",{"id":26,"doc_module":4,"doc_module_name":25,"category_name":89,"show_sort_weight":90,"slug":91},"Literature",80,"literature",{"id":33,"doc_module":4,"doc_module_name":25,"category_name":93,"show_sort_weight":94,"slug":95},"Exam",70,"exam",{"id":55,"doc_module":4,"doc_module_name":25,"category_name":97,"show_sort_weight":98,"slug":99},"Comic",60,"comic",{"id":101,"doc_module":4,"doc_module_name":25,"category_name":102,"show_sort_weight":103,"slug":104},6,"Technology",50,"technology",{"id":106,"doc_module":4,"doc_module_name":25,"category_name":107,"show_sort_weight":108,"slug":109},7,"Healthcare",40,"healthcare",{"id":111,"doc_module":4,"doc_module_name":25,"category_name":29,"show_sort_weight":112,"slug":113},8,30,"research-report",{"id":115,"doc_module":4,"doc_module_name":25,"category_name":116,"show_sort_weight":117,"slug":118},9,"Religion & Spirituality",20,"religion-spirituality",{"id":117,"doc_module":4,"doc_module_name":25,"category_name":120,"show_sort_weight":117,"slug":121},"World Cup","world-cup",{"id":123,"doc_module":4,"doc_module_name":25,"category_name":124,"show_sort_weight":123,"slug":125},10,"Lifestyle","lifestyle",{"id":127,"doc_module":4,"doc_module_name":25,"category_name":128,"show_sort_weight":55,"slug":129},19,"General","general",{"code":4,"msg":82,"data":131},{"doc_id":79,"user_id":132,"nickname":42,"user_avatar":133,"doc_module":4,"category_id":111,"category_name":29,"doc_title":10,"doc_description":12,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":55,"is_deleted":4,"is_public":22,"is_downloadable":22,"audit_status":22,"page_count":139,"language":140,"language_code":8,"site_id":7,"html_lang":8,"table_of_contents":141,"faqs":142,"seo_title":143,"seo_description":12,"update_tm":80,"read_time":144},1374408744247,"https://ap-avatar.wpscdn.com/avatar/14001251d37d565ec6f?x-image-process=image/resize,m_fixed,w_180,h_180&k=1790672120290115972","| PROPOSED CONSTRCUTION PADDY SEED PROCESSING SHED BUILDING FOR SUSTANABLE PADDY FARMING WITH TECHNOLOGY AT MOHADI KHAPA ,GAT NO 137/1,TAH TUMSAR DIST BHANDARA BELONGING TO |  |  |  |  |  |\n| --- | --- | --- | --- | --- | --- |\n| TUMSAR FARMERS PRODUCER COMPANY LIMITED SIHORA\u003Cbr>WAREHOUSE BUILDING |  |  |  |  |  |\n| General Abstract (Summary) |  |  |  |  |  |\n| Sr. No. | Details |  | Currancy | Amount |  |\n| 1 | Building Work |  | Rs | 18301185.47 |  |\n| 2 | Electric work |  | Rs | 150584 |  |\n| 3 | Royalty charges |  | Rs | 467558.53 |  |\n| 4 | Lab testing charges |  | Rs | 118720 |  |\n|  | Total Cost Of Project |  | RS | 19038048.00 |  |\n|  |  |  |  |  |  |\n\nMEASUREMENT SHEET FOR INDIVIDUAL ITEM  \nWARE HOUSE  \n\n| Sr. No. | Sr.No &\u003Cbr>Code No. | Public Work\u003Cbr>Region\u003Cbr>Nagpur | DESCRIPTION & DETAILS |\n| --- | --- | --- | --- |\n\nSW-I-CIVIL WORK  \nExcavation (BDA)  \n\n| 1 | BDA1/21.01 | 718/ 115 | Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 m. beyond the building area and stacking and spreading as directed, dewater ing,preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 3.00 m. ) By Manual Means |  |  |  |  |  |  |\n| --- | --- | --- | --- | --- | --- | --- | --- | --- | --- |\n|  |  |  | DESCRIPTION | NO. | LENGTH | BREADTH | DPT/HT | QUANTITY | UNIT |\n|  |  |  | Warehouse | 18 | 2.8 | 2.8 | 1.5 | 211.68 | CUM |\n|  |  |  |  |  |  |  |  |  |  |\n|  |  |  | TOTAL |  |  |  |  | 211.68 | CUM |\n|  |  |  |  |  |  |  |  |  |  |\n| 2 | BDA1/21.01 | 718/ 115 | Excavation for foundation in earth, soil of all types, sand, gravel and soft murum, including removing the excavated material up to a distance of 50 m. beyond the building area and stacking and spreading as directed, dewater ing,preparing the bed for the foundation and necessary back filling, ramming, watering including shoring and strutting etc. complete. (Lift upto 3.00 m. ) By Manual Means |  |  |  |  |  |  |\n|  |  |  | DESCRIPTION | NO. | LENGTH | BREADTH | DPT/HT | QUANTITY | UNIT |\n|  |  |  | Warehouse | 18 | 2.8 | 2.8 | 0.9 | 127.008 | CUM |\n|  |  |  |  |  |  |  |  |  |  |\n|  |  |  | TOTAL |  |  |  |  | 127.01 | CUM |\n|  |  |  |  |  |  |  |  |  |  |\n| 3 | BDA1/21.01 | 718/ 115 | Providing soling using 80 mm. size trap metal in 15cm. layer including filling voids with crused sand/grit, ramming, [watering etc. complete. Spec. no. As](watering etc. complete. Spec. no. As) directed by Engineer in charge. |  |  |  |  |  |  |\n|  |  |  | DESCRIPTION | NO. | LENGTH | BREADTH | DPT/HT | QUANTITY | UNIT |\n|  |  |  | Warehouse | 18 | 2.8 | 2.8 | 0.2 | 28.224 | CUM |\n|  |  |  | Warehouse Floor | 1 | 41.54 | 21.59 | 0.2 | 179.36972 | CUM |\n|  |  |  | Plinth Protection | 2 | 42 | 1.2 | 0.2 | 20.16 | CUM |\n|  |  |  | Plinth Protection | 2 | 22 | 1.2 | 0.2 | 10.56 | CUM |\n|  |  |  | for Canopy Staicase T | 6 | 4.42 | 1.57 | 0.2 | 8.32728 | CUM |\n|  |  |  | Total 6 opening |  |  |  |  |  |  |\n|  |  |  | TOTAL |  |  |  |  | 246.64 | CUM |\n|  |  |  |  |  |  |  |  |  |  |\n| 4 | BDA10/21.36 | 748/ 117 | Filling in plinth and floors with approved excavated material in [15cm. to 20 cm. layers](15cm. to 20 cm. layers) Including watering and compacting etc. complete |  |  |  |  |  |  |\n|  |  |  | DESCRIPTION | NO. | LENGTH | BREADTH | DPT/HT | QUANTITY | UNIT |\n|  |  |  | Below Footing |  |  |  |  |  |  |\n|  |  |  | Warehouse | 18 | 2.8 | 2.8 | 0.3 | 42.336 | CUM |\n|  |  |  | Back Fillng in coloumn pit |  |  |  |  |  |  |\n|  |  |  | Excvation Qty Item 1& 2 | 1 |  |  |  | 338.69 | CUM |\n|  |  | Deduction Footing Column |  | -1 |  |  |  | 75.168 | CUM |\n|  |  |  | on Floor |  |  |  |  |  |  |\n|  |  |  | Warehouse | 1 | 41.54 | 21.59 | 0.3 | 269.05458 | CUM |\n|  |  |  |  |  |  |  |  |  |  |\n|  |  |  | TOTAL QTY for MURUM FILLING |  |  |  |  | 725.25 | CUM |\n\n\n| 5 | BDA10/21.37 | 749/ 117 | Filling in plinth and fl","cbCait3oH9uONEwX","https://ap.wps.com/l/cbCait3oH9uONEwX","pdf",300195,32,"English","# General Abstract (Summary)\n## Cost Heads and Total Project Cost\n# Measurement Sheet for Individual Item - Warehouse\n## SW-I-CIVIL WORK\n## Excavation (BDA)\n## Providing Soling and Backfilling\n## Filling in Plinth and Floors\n## Earthwork Embankment and Leveling","[{\"question\":\"What are the main cost heads listed in the general abstract summary?\",\"answer\":\"The summary includes building work, electric work, royalty charges, and lab testing charges. A total cost of the project is also provided.\"},{\"question\":\"Which items are included at the start of the warehouse civil work measurement sheet?\",\"answer\":\"It begins with excavation for foundations by manual means, then moves to providing soling, filling in plinth and floors, and related backfilling measurements.\"},{\"question\":\"How are quantities typically represented for each civil work item?\",\"answer\":\"Each item provides a description and measurement parameters (such as number, length, breadth, depth/height) along with the calculated quantity and unit (e.g., CUM).\"}]","Warehouse Building Civil Work Measurement Sheet - Excavation and Earth Work | PDF",81]