[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-569863-105":59,"doc-detail-569863-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","vol14-no39-water-pollution-control-state-certification-provision-snags-accord-on-water-pollution-control-act-amendments","Vol.14 No.39 - WATER POLLUTION CONTROL - State Certification Provision Snags Accord on Water Pollution Control Act Amendments","","WATER POLLUTION CONTROL conferees meet in an unannounced session to negotiate Federal Water Pollution Control Act Amendments, but key disagreements threaten passage. The dispute centers on state certification provisions, including how states may administer EPA sewage treatment construction grants and the conditions for dredge-and-fill moratoriums. Conferees ultimately align on several elements, including a one-year moratorium and trial state certification for fiscal 1977–1978, while further negotiations remain uncertain before adjournment.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/vol14-no39-water-pollution-control-state-certification-provision-snags-accord-on-water-pollution-control-act-amendments/569863/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/vol14-no39-water-pollution-control-state-certification-provision-snags-accord-on-water-pollution-control-act-amendments/569863.png","ImageObject",300,407,{"name":92,"@type":93},"Logic","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-11-15","2026-10-13",true,{"@type":102,"interactionType":103,"userInteractionCount":29},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What was the main source of disagreement between House and Senate conferees?","Question",{"text":112,"@type":113},"House conferees failed to accept a compromise language that would allow state certification for administering EPA sewage treatment plant construction grant programs, creating a disagreement that could derail the amendments.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"What moratorium terms were agreed to regarding dredge and fill permits?",{"text":117,"@type":113},"Senate conferees agreed to a one-year moratorium on the dredge and fill permit program, paired with conditions such as EPA’s ability to abate dredging with toxic or adverse effects.",{"name":119,"@type":110,"acceptedAnswer":120},"How did the Senate structure the state certification program?",{"text":121,"@type":113},"The Senate specified the program operate on a trial basis for fiscal 1977 and 1978, require 1% of construction grant funds for state administrative programs, and limit certification to states with an EPA-approved priority list.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},569863,1792164989,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":29,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":139,"language":140,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":141,"faqs":142,"seo_title":143,"seo_description":67,"update_tm":144,"read_time":145,"preview_page_count":19,"preview_urls":146},1099513958762,"https://ap-avatar.wpscdn.com/avatar/1000023916a998db790?x-image-process=image/resize,m_fixed,w_180,h_180&k=1784791008015729253","Vol.14 No.39  \nWATER POLLUTION CONTROL conferees met in unannounced session last Thursday eve-ning,but made no more progress than had been made on Wednesday(see page 382).Afterfailing again to resolve major issues,Rep.James Wright(D.-Tex.)charged that the Senatemembers had refused to accept any suggestions offered by the House and said it was up tothe Senate to seek any future meeting.Sen.Edmund S.Muskie(D.-Me.)took offense atWright's inference,but Sen.Jennings Randolph(D.-W.Va.)calmed things down quickly.Randolph indicated his desire to report a bill and,in fact,voted to accept the latest Houseproposal,which all other Senate conferees opposed.  \nREP.JOHN D.DINGELL(D.-Mich.)may not be on the Clean Air Act conference com-mittee,but he is still exerting behind-the-scenes pressure on auto emissions control delib-erations.With Rep.James T.Broyhill(R.-N.C.),who is on the committee,Dingell lastweek released a new Chase Econometrics study showing substantial fuel economy penal-ties,increased costs and additional unemployment associated with the Senate formula.Dingell's aides say the Congressman will not accept any compromise close to the Senateversion and believe he has enough votes in the House to make his position stick.Dingell aides also said they believe President Ford will veto any bill that strays too farfrom the Dingell formula.  \nSeptember 27,1976  \nPage 381  \n*State Certification Bid Snags FWPCA Accord                     …Page 382*Clean Air Conferees Still Face Toughest Tests                      …Page 383*Peterson Urges Voluntary Fluorocarbon Phase-Out……                …Page 385*EPA Auto Fuel Economy Data Show 6%Improvement-…             ·Page 385*Mining Congress Cites Cost of 1983 FWPCA Rules·                       Page 386*Brown Recommends Reorganization of R&D Effort-                 …Page 386  \nSLANTS &TRENDS  \nTWO MAJOR PROBLEMS STILL face conferees:Senate insistence that EPA approve statepriority lists as prerequisite for state certification to administer the construction grants pro-gram,and disagreement on the length of any moratorium on the dredge and fill permit pro-gram for Phase I and II waters.As a result of Thursday's discussions,the Senate now wantsa one-year moratorium,while the House is now seeking a moratorium extending one yearbeyond expiration of authorizations contained in the bill.Conferees had agreed to a two-year authorization,but the Senate now wants a one-year extension.  \nHOUSE HAS RECEIVED NO formal word from the Senate as to when,or whether,thenext meeting will be held.Muskie repeatedly stated he will not be in Washington thisweek,unless there is evidence of substantial progress on Clean Air Act Amendments,andCongress still plans to adjourn by Oct.2.At press time,however,most observers be-lieved that conferees would meet this week to take one last crack at both water and airlegislation.House conferees on Clean Air Act Amendments plan to meet today to con-sider their response to Muskie's proposal that any further discussion proceed from provi-sions of the Senate bill(see page 383).  \nHouse and Senate conferees on Fed-eral Water Pollution Control ActAmendments,S.2710,met Sept.22  \n# STATE CERTIFICATION PROVISION SNAGS ACCORDON WATER POLLUTION CONTROL ACT AMENDMENTS\n\nand adjourned the same day facing a disagreement which could kill amendments proposed for thisyear.Dispute resulted when House conferees failed to accept a compromise version of language intheir bill permitting certification of states to administer Environmental Protection Agency's sewagetreatment plant construction grant program.  \nAs part of a package deal to secure agreement on major problem areas,Rep.James Wright(D.-Tex.)had proposed that the Senate accept the state certification program adopted by the House,aswell as a combined Step 2 and 3 construction grant application for small projects.In return,theHouse would accept a simple one-year moratorium on enforcement of the dredge and fill permit pro-gram in Phase II and III waters -","cbCailwecVlsKLeb","https://ap.wps.com/l/cbCailwecVlsKLeb","pdf",3758577,11,"English","# STATE CERTIFICATION PROVISION SNAGS ACCORD\n## Other Provisions Accepted by Conferees","[{\"question\":\"What was the main source of disagreement between House and Senate conferees?\",\"answer\":\"House conferees failed to accept a compromise language that would allow state certification for administering EPA sewage treatment plant construction grant programs, creating a disagreement that could derail the amendments.\"},{\"question\":\"What moratorium terms were agreed to regarding dredge and fill permits?\",\"answer\":\"Senate conferees agreed to a one-year moratorium on the dredge and fill permit program, paired with conditions such as EPA’s ability to abate dredging with toxic or adverse effects.\"},{\"question\":\"How did the Senate structure the state certification program?\",\"answer\":\"The Senate specified the program operate on a trial basis for fiscal 1977 and 1978, require 1% of construction grant funds for state administrative programs, and limit certification to states with an EPA-approved priority list.\"}]","Vol.14 No.39 - WATER POLLUTION CONTROL - State Certification Provision Snags Accord on Water Pollution Control Act Amendments | PDF",1791877974,28,[147,151,155,159],{"page_no":8,"url":148,"width":149,"height":150},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-18/a3cd8286fc349caa0f9437b155a7df4d.webp",983,1294,{"page_no":14,"url":152,"width":153,"height":154},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-18/368675e32c0c145f666d918840f91c08.webp",982,1292,{"page_no":81,"url":156,"width":157,"height":158},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-18/b47e5aa0497b98c7ade412be769eba62.webp",981,1291,{"page_no":19,"url":160,"width":161,"height":162},"https://res-academy.cache.wpscdn.com/upload/kdocshare/2026-11-18/94044227202f8e439afb1276706427fe.webp",980,1298]