[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"detail-sidebar-cat-0-en-105":3,"doc-seo-664188-105":59,"doc-detail-664188-en":130},{"code":4,"msg":5,"data":6},0,"success",[7,13,18,23,28,33,38,43,48,51,55],{"id":8,"doc_module":4,"doc_module_name":9,"category_name":10,"show_sort_weight":11,"slug":12},1,"Document","Story & Novel",90,"story-novel",{"id":14,"doc_module":4,"doc_module_name":9,"category_name":15,"show_sort_weight":16,"slug":17},2,"Literature",80,"literature",{"id":19,"doc_module":4,"doc_module_name":9,"category_name":20,"show_sort_weight":21,"slug":22},4,"Exam",70,"exam",{"id":24,"doc_module":4,"doc_module_name":9,"category_name":25,"show_sort_weight":26,"slug":27},5,"Comic",60,"comic",{"id":29,"doc_module":4,"doc_module_name":9,"category_name":30,"show_sort_weight":31,"slug":32},6,"Technology",50,"technology",{"id":34,"doc_module":4,"doc_module_name":9,"category_name":35,"show_sort_weight":36,"slug":37},7,"Healthcare",40,"healthcare",{"id":39,"doc_module":4,"doc_module_name":9,"category_name":40,"show_sort_weight":41,"slug":42},8,"Research & Report",30,"research-report",{"id":44,"doc_module":4,"doc_module_name":9,"category_name":45,"show_sort_weight":46,"slug":47},9,"Religion & Spirituality",20,"religion-spirituality",{"id":46,"doc_module":4,"doc_module_name":9,"category_name":49,"show_sort_weight":46,"slug":50},"World Cup","world-cup",{"id":52,"doc_module":4,"doc_module_name":9,"category_name":53,"show_sort_weight":52,"slug":54},10,"Lifestyle","lifestyle",{"id":56,"doc_module":4,"doc_module_name":9,"category_name":57,"show_sort_weight":24,"slug":58},19,"General","general",{"code":4,"msg":60,"data":61},"ok",{"site_id":62,"language":63,"slug":64,"title":65,"keywords":66,"description":67,"schema_data":68,"social_meta":123,"head_meta":125,"extra_data":127,"updated_unix":129},105,"en","vol-1-3-phase-2-foundation-installation-multipurpose-laboratory-building-contract-documents-august-2025","Vol 1-3 - Phase 2 Foundation Installation - Multipurpose Laboratory Building - Contract Documents (August 2025)","","Contract documents for Phase 2: Foundation Installation (Multipurpose Laboratory Building) for Marin County, California, prepared under job number 24600-01 dated August 2025. The packet includes acknowledgements and certifications, a table of contents for Volume 1 (contract requirements) and Volume 2 (bidding requirements), and references to technical specifications and drawings across Volume 3 and Volume 4. Licensed California design professionals are listed with responsibility for specified divisions and volumes.",{"@graph":69,"@context":122},[70,84,105],{"@type":71,"itemListElement":72},"BreadcrumbList",[73,77,79,82],{"item":74,"name":75,"@type":76,"position":8},"https://docshare.wps.com","Home","ListItem",{"item":78,"name":9,"@type":76,"position":14},"https://docshare.wps.com/document/",{"item":80,"name":40,"@type":76,"position":81},"https://docshare.wps.com/document/research-report/",3,{"item":83,"name":65,"@type":76,"position":19},"https://docshare.wps.com/document/vol-1-3-phase-2-foundation-installation-multipurpose-laboratory-building-contract-documents-august-2025/664188/",{"url":83,"name":65,"@type":85,"image":86,"author":91,"headline":65,"publisher":94,"fileFormat":97,"inLanguage":63,"description":67,"dateModified":98,"datePublished":99,"encodingFormat":97,"isAccessibleForFree":100,"interactionStatistic":101},"DigitalDocument",{"url":87,"@type":88,"width":89,"height":90},"https://docshare.wps.com/thumbnails/vol-1-3-phase-2-foundation-installation-multipurpose-laboratory-building-contract-documents-august-2025/664188.png","ImageObject",300,407,{"name":92,"@type":93},"Patrick","Person",{"url":74,"name":95,"@type":96},"DocShare","Organization","application/pdf","2026-10-30","2026-10-29",true,{"@type":102,"interactionType":103,"userInteractionCount":29},"InteractionCounter",{"@type":104},"ViewAction",{"@type":106,"mainEntity":107},"FAQPage",[108,114,118],{"name":109,"@type":110,"acceptedAnswer":111},"What project and job number do these contract documents cover?","Question",{"text":112,"@type":113},"They cover Phase 2: Foundation Installation (Multipurpose Laboratory Building) with job number 24600-01.","Answer",{"name":115,"@type":110,"acceptedAnswer":116},"What must be done to receive addendums to the contract documents?",{"text":117,"@type":113},"The acknowledgement form must be received by the district, and it should be faxed or emailed immediately upon receipt of the packet.",{"name":119,"@type":110,"acceptedAnswer":120},"Which volumes are included and what general scope do they represent?",{"text":121,"@type":113},"Volume 1 contains contract requirements, Volume 2 contains bidding requirements, Volume 3 covers technical specifications, and Volume 4 covers drawings.","https://schema.org",{"og:url":83,"og:type":124,"og:title":65,"og:site_name":95,"og:description":67},"article",{"robots":126,"canonical":83},"index,follow",{"doc_id":128,"site_id":62},664188,1793242629,{"code":4,"msg":5,"data":131},{"doc_id":128,"user_id":132,"nickname":92,"user_avatar":133,"doc_module":4,"category_id":39,"category_name":40,"doc_title":65,"doc_description":67,"doc_content":134,"file_id":135,"file_url":136,"file_type":137,"file_size":138,"view_count":29,"is_deleted":4,"is_public":8,"is_downloadable":8,"audit_status":8,"page_count":139,"language":140,"language_code":63,"site_id":62,"html_lang":63,"table_of_contents":141,"faqs":142,"seo_title":143,"seo_description":67,"update_tm":129,"read_time":144},549758146520,"https://ap-avatar.wpscdn.com/avatar/80002397d8c0411e94?_k=1775819394049821470","MARIN COUNTY, CALIFORNIA  \nCONTRACT DOCUMENTS FOR  \nPHASE 2: FOUNDATION INSTALLATION  \n(Multipurpose Laboratory Building)  \nJOB NO. 24600-01  \nAUGUST 2025  \nDISTRICT BOARD  \nGary E. Robards – President Crystal J. Yezman – Vice President Megan Clark  \nNicholas Lavrov  \nCraig K. Murray  \nCurtis Paxton – General Manager Michael P. Cortez, PE – District Engineer Don Moore – Plant Manager Dale McDonald – Administrative Services Manager Greg Pease – Collection System/Safety Manager  \nCopy No    \nTHIS PAGE INTENTIONALLY LEFT BLANK  \nACKNOWLEDGEMENT  \nACKNOWLEDGEMENT OF THE CONTRACT DOCUMENTS MUST BE RECEIVED BY THE DISTRICT IN ORDER FOR YOU TO RECEIVE ADDENDUMS (i.e., updates or changes to the Contract Documents) . PLEASE COMPLETE BELOW AND FAX TO 415-499-7715, OR EMAIL TO [pquinn@lgvsd.org](pquinn@lgvsd.org) IMMEDIATELY UPON RECEIPT OF THIS PACKET so that you will receive any changes or updates as they occur. If we do not receive this form from you, any updates or changes that you do not receive are not the responsibility of the District.  \nPROJECT: PHASE 2: FOUNDATION INSTALLATION  \n(Multipurpose Laboratory Building)  \nDate Received:  \n_____________________________________  \nRecipient:   (BIDDER)  \n___________________________________________ (ADDRESS)  \n___________________________________________  \n___________________________________________  \n___________________________________________ (PHONE)  \n___________________________________________ (FAX)  \n___________________________________________ (EMAIL)  \n_________________________________ ___________________________________  \nPrinted Name Signature  \nTHIS PAGE INTENTIONALLY LEFT BLANK  \nCERTIFICATIONS PAGE  \nThe various portions of the specifications and other contract documents for project “PHASE 2: FOUNDATION INSTALLATION (Multipurpose Laboratory Building),” JOB NO. 24600-01 , have been prepared under the direction of the following design professionals, licensed in the State of California.  \nLGVSD:  \nResponsible for the following sections: Volume 3 – Technical Specifications  \nDivision 1  \n01 14 00  \n01 30 00  \n01 35 01  \n01 35 23  \n01 71 13  \n02 50 10  \nNOLL & TAM ARCHITECTS:  \nNoll & Tam Architects Scott Salge, Architect Lic. No. C30033  \nResponsible for the following sections: Volume 3 – Technical Specifications  \nDivision 1  \nAll except as noted above.  \nDivision 2  \nAll  \nDivision 5  \nAll  \nDivision 31  \nAll  \nVolume 4 – Drawings  \nTHIS PAGE INTENTIONALLY LEFT BLANK  \nTABLE OF CONTENTS  \nVOLUME 1 – CONTRACT REQUIREMENTS  \nNOTICE INVITING SEALED BIDS .................................................................................................. 1-1  \nINSTRUCTIONS TO BIDDERS ....................................................................................................... 1-5  \nCONTRACT CHECK LIST ............................................................................................................. 1-15  \nAGREEMENT ................................................................................................................................ 1-17  \nGENERAL CONDITIONS .............................................................................................................. 1-21  \nPERFORMANCE BOND ................................................................................................................ 1-67  \nPAYMENT/LABOR AND MATERIALS BOND ............................................................................... 1-69  \nMAINTENANCE BOND ................................................................................................................. 1-71  \nESCROW AGREEMENT FOR SECURITY DEPOSITS IN LIEU OF RETENTION ........................................................................ 1-73  \nVOLUME 2 – BIDDING REQUIREMENTS  \nBIDDER’S CHECK LIST .................................................................................................................. 2-1  \nBID LABEL ...............................................................................","cbCaijPZSvzGwogz","https://ap.wps.com/l/cbCaijPZSvzGwogz","pdf",33348547,516,"English","# NOTICE INVITING SEALED BIDS\n# INSTRUCTIONS TO BIDDERS\n# CONTRACT CHECK LIST\n# AGREEMENT\n# GENERAL CONDITIONS\n# PERFORMANCE BOND\n# PAYMENT/LABOR AND MATERIALS BOND\n# MAINTENANCE BOND\n# ESCROW AGREEMENT FOR SECURITY DEPOSITS IN LIEU OF RETENTION\n# VOLUME 2 – BIDDING REQUIREMENTS\n## BIDDER’S CHECK LIST\n## BID LABEL\n## PROPOSAL COVER PAGE\n## BID SCHEDULE\n## BID BOND\n## CONTRACTOR LICENSE INFORMATION\n## LIST OF PROPOSED SUBCONTRACTORS\n## LIST OF MAJOR MATERIALS\n## WORKERS COMPENSATION INSURANCE CERTIFICATION\n## NON-COLLUSION AFFIDAVIT\n## DRUG-FREE WORKPLACE CERTIFICATION\n## DEBARMENT CERTIFICATION\n## STATEMENT OF EXPERIENCE OF BIDDER\n## FINANCIAL QUALIFICATIONS BIDDER’S REFERENCES AND CREDIT REPORT\n## FINANCIAL STATEMENT FORM\n## SITE VISIT AFFIDAVIT TO BE EXECUTED BY BIDDER, NOTARIZED AND SUBMITTED WITH BID\n## BIDDER’S SIGNATURE PAGE","[{\"question\":\"What project and job number do these contract documents cover?\",\"answer\":\"They cover Phase 2: Foundation Installation (Multipurpose Laboratory Building) with job number 24600-01.\"},{\"question\":\"What must be done to receive addendums to the contract documents?\",\"answer\":\"The acknowledgement form must be received by the district, and it should be faxed or emailed immediately upon receipt of the packet.\"},{\"question\":\"Which volumes are included and what general scope do they represent?\",\"answer\":\"Volume 1 contains contract requirements, Volume 2 contains bidding requirements, Volume 3 covers technical specifications, and Volume 4 covers drawings.\"}]","Vol 1-3 - Phase 2 Foundation Installation - Multipurpose Laboratory Building - Contract Documents (August 2025) | PDF",1300]