[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"doc-detail-109062-en":3,"doc-seo-109062-105":30,"detail-sidebar-cat-0-en-105":91},{"code":4,"msg":5,"data":6},0,"success",{"doc_id":7,"user_id":8,"nickname":9,"user_avatar":10,"doc_module":4,"category_id":11,"category_name":12,"doc_title":13,"doc_description":14,"doc_content":15,"file_id":16,"file_url":17,"file_type":18,"file_size":19,"view_count":20,"is_deleted":4,"is_public":21,"is_downloadable":21,"audit_status":21,"page_count":22,"language":23,"language_code":24,"site_id":25,"html_lang":24,"table_of_contents":26,"faqs":27,"seo_title":13,"seo_description":14,"update_tm":28,"read_time":29},109062,7971461741311,"Ophelia","https://ap-avatar.wpscdn.com/avatar/74000253aff267980c6?x-image-process=image/resize,m_fixed,w_180,h_180&k=1779345379180704826",8,"Research & Report","Vietnam Solar Competitive Bidding Strategy and Framework","Vietnam Solar Competitive Bidding Strategy and Framework outlines how Vietnam can expand solar photovoltaic capacity through competitive bidding. It explains the national policy background and targets for solar PV deployment, then proposes approaches for a legal framework, including guidance for bidding procedures, investment law considerations, contractor selection, land-related investor selection, and PPP law alignment. It further details deployment schemes via substation-based bidding and solar park competitive bidding, roles and responsibilities, and a bidding, procurement, and contractual framework.","Vietnam Solar Competitive Framework | A  \nPub lic Disclosure Authorized Pub lic Disclosure Authorized Pub lic Disclosure Authorized Pub lic Disclosure Authorized  \nVIETNAM SOLAR  \nCOMPETITIVE BIDDING  \nSTRATEGY AND FRAMEWORK  \nThis report was researched and prepared by the World Bank with the contributions of its consultants PricewaterhouseCoopers (PWC) and Baker McKenzie. The work was funded by the Energy Sector Management Assistance Program (ESMAP), a multi-donor trust funded program administered by the World Bank, and the Global Infrastructure Facility (GIF) .  \nAuthors: World Bank Group (Sabine Cornieti and Ky Hong Tran with the support of Agnes Chew, Franz Gerner, Rahul Kitchlu, Bhanu Mehrotra , Cam Thi Kim Nguyen and Edwin Hin Lung Yuen) with the contributions from PWC (Raamkumar M Ragu, Rahul Raizada, Glenn Hughes, Kameswara Rao, Nikhil Abraham, Tran Nhat Bach, Abhinav Goyal) and Baker McKenzie (Chi Lieu Dang and Thanh Hai Nguyen) .  \nPeer-reviewers: Arnaud Braud, Claire Nicolas and Nadia Taobane (World Bank)  \nEditor: Stephen Spector and Steven Kennedy  \nDesign: Debra Naylor, Naylor Design, Inc  \n© 2019 International Bank for Reconstruction and Development / The World Bank 1818 H Street NW | Washington DC 20433  \n[202-473-1000 | www.worldbank.org](202-473-1000 | www.worldbank.org)  \nThis work is a product of the staff of the World Bank with external contributions. The findings, interpretations, and conclusions expressed in this work do not necessarily reflect the views of the World Bank, its Board of Executive Directors, or the governments they represent.  \nThe World Bank does not guarantee the accuracy of the data included in this work. The boundaries, colors, denominations, and other information shown on any map in this work do not imply any judgment on the part of the World Bank concerning the legal status of any territory or the endorsement or acceptance of such boundaries.  \nRights and Permissions  \nThe material in this work is subject to copyright. Because the World Bank encourages dissemination of its knowledge, this work may be reproduced, in whole or in part, for noncommercial purposes as long as full attribution to this work is given.  \nAny queries on rights and licenses, including subsidiary rights, should be addressed to: World Bank Publications, World Bank Group, 1818 H Street NW, Washington, DC 20433, USA; fax: 202-522-2625; [pubrights@worldbank.org](pubrights@worldbank.org).  \nESMAP and the GIF would appreciate a copy of or link to any publication that uses this publication as a source, addressed to ESMAP Manager/GIF Manager, World Bank, 1818 H Street NW, Washington, DC, 20433 USA; [esmap@worldbank.org/managementunit@globalinfrafacility.org](esmap@worldbank.org/managementunit@globalinfrafacility.org).  \nAll images remain the sole property of their source and may not be used for any purpose without written permission from the source.  \nAttribution  \nPlease cite the work as follows: “World Bank. 2019. Vietnam Solar Competitive Bidding Strategy and  \nFramework. Washington, DC: World Bank.”  \nVIETNAM SOLAR  \nCOMPETITIVE BIDDING STRATEGY AND FRAMEWORK  \nCONTENTS  \nExecutive Summary 5  \n1. Introduction 9  \n2. Solar Deployment Targets and Timeline 11  \n3. Legal Framework 13  \n3.1 Review of Legal Framework Possibilities 13  \n3.1.1 MOIT to develop further guidance on bidding procedures 13  \n3.1.2 Investment law 13  \n3.1.3 Bidding legal framework for selection of contractor to provide goods and services 13  \n3.1.4 Bidding legal framework for selection of investors for projects using land 14  \n3.1.5 Public-Private-Partnership (PPP) law 14  \n3.2 Legal Recommendations 14  \n4. Deployment Scheme 16  \n4.1 Substation Based Competitive Bidding 17  \n4.1.1 Description of the bidding model 17  \n4.1.2 Key steps for substation-based bidding scheme 17  \n4.1.3 Technical aspects 18  \n4.1.4 Permits 18  \n4.2 Solar Park Competitive Bidding 18  \n4.2.1 Description of the bidding model 18  \n4.2.2 Key steps for solar parks 20  \n4.2.3 Pe","cbCaiekY8uI3BeUl","https://ap.wps.com/l/cbCaiekY8uI3BeUl","pdf",2668231,4,1,44,"English","en",105,"# Executive Summary\n## Background\n# Introduction\n## Solar Deployment Targets and Timeline\n## Legal Framework\n## Deployment Scheme\n## Roles and Responsibilities\n## Bidding Framework\n## Socio-Economic Benefits Strategy\n## Conclusion\n# Annex 1. The Vietnam Power Sector Reform Program\n# Annex 2. Results of Geospatial Analysis\n# Annex 3. PV Supply Chain Analysis","[{\"question\":\"What policy and demand context drives Vietnam’s solar PV expansion plan?\",\"answer\":\"The report links solar PV growth to Vietnam’s revised power development plan, electricity demand forecasts, and energy security and sustainability objectives. It notes that the 2020 capacity target is unlikely met due to slower-than-expected demand growth.\"},{\"question\":\"What solar deployment targets does the plan set for Vietnam’s PV capacity?\",\"answer\":\"The document specifies targets for installed solar PV capacity: 850 MW by 2020, 4 GW by 2025, and 12 GW by 2030, alongside broader renewable energy shares.\"},{\"question\":\"How does the bidding strategy organize procurement for solar projects?\",\"answer\":\"It presents deployment schemes including substation-based competitive bidding and solar park competitive bidding. It then defines bidding mechanisms and connects them to procurement and contractual frameworks, supported by clear roles and responsibilities.\"}]",1784476227,111,{"code":4,"msg":31,"data":32},"ok",{"site_id":25,"language":24,"slug":33,"title":13,"keywords":34,"description":14,"schema_data":35,"social_meta":86,"head_meta":88,"extra_data":90,"updated_unix":28},"vietnam-solar-competitive-bidding-strategy-and-framework","",{"@graph":36,"@context":85},[37,53,68],{"@type":38,"itemListElement":39},"BreadcrumbList",[40,44,48,51],{"item":41,"name":42,"@type":43,"position":21},"https://docshare.wps.com","Home","ListItem",{"item":45,"name":46,"@type":43,"position":47},"https://docshare.wps.com/document/","Document",2,{"item":49,"name":12,"@type":43,"position":50},"https://docshare.wps.com/document/research-report/",3,{"item":52,"name":13,"@type":43,"position":20},"https://docshare.wps.com/document/vietnam-solar-competitive-bidding-strategy-and-framework/109062/",{"url":52,"name":13,"@type":54,"author":55,"headline":13,"publisher":57,"fileFormat":60,"inLanguage":24,"description":14,"dateModified":61,"datePublished":62,"encodingFormat":60,"isAccessibleForFree":63,"interactionStatistic":64},"DigitalDocument",{"name":9,"@type":56},"Person",{"url":41,"name":58,"@type":59},"DocShare","Organization","application/pdf","2026-07-30","2026-07-19",true,{"@type":65,"interactionType":66,"userInteractionCount":20},"InteractionCounter",{"@type":67},"ViewAction",{"@type":69,"mainEntity":70},"FAQPage",[71,77,81],{"name":72,"@type":73,"acceptedAnswer":74},"What policy and demand context drives Vietnam’s solar PV expansion plan?","Question",{"text":75,"@type":76},"The report links solar PV growth to Vietnam’s revised power development plan, electricity demand forecasts, and energy security and sustainability objectives. It notes that the 2020 capacity target is unlikely met due to slower-than-expected demand growth.","Answer",{"name":78,"@type":73,"acceptedAnswer":79},"What solar deployment targets does the plan set for Vietnam’s PV capacity?",{"text":80,"@type":76},"The document specifies targets for installed solar PV capacity: 850 MW by 2020, 4 GW by 2025, and 12 GW by 2030, alongside broader renewable energy shares.",{"name":82,"@type":73,"acceptedAnswer":83},"How does the bidding strategy organize procurement for solar projects?",{"text":84,"@type":76},"It presents deployment schemes including substation-based competitive bidding and solar park competitive bidding. It then defines bidding mechanisms and connects them to procurement and contractual frameworks, supported by clear roles and responsibilities.","https://schema.org",{"og:url":52,"og:type":87,"og:title":13,"og:site_name":58,"og:description":14},"article",{"robots":89,"canonical":52},"index,follow",{"doc_id":7,"site_id":25},{"code":4,"msg":5,"data":92},[93,97,101,105,110,115,120,123,128,131,135],{"id":21,"doc_module":4,"doc_module_name":46,"category_name":94,"show_sort_weight":95,"slug":96},"Story & Novel",90,"story-novel",{"id":47,"doc_module":4,"doc_module_name":46,"category_name":98,"show_sort_weight":99,"slug":100},"Literature",80,"literature",{"id":20,"doc_module":4,"doc_module_name":46,"category_name":102,"show_sort_weight":103,"slug":104},"Exam",70,"exam",{"id":106,"doc_module":4,"doc_module_name":46,"category_name":107,"show_sort_weight":108,"slug":109},5,"Comic",60,"comic",{"id":111,"doc_module":4,"doc_module_name":46,"category_name":112,"show_sort_weight":113,"slug":114},6,"Technology",50,"technology",{"id":116,"doc_module":4,"doc_module_name":46,"category_name":117,"show_sort_weight":118,"slug":119},7,"Healthcare",40,"healthcare",{"id":11,"doc_module":4,"doc_module_name":46,"category_name":12,"show_sort_weight":121,"slug":122},30,"research-report",{"id":124,"doc_module":4,"doc_module_name":46,"category_name":125,"show_sort_weight":126,"slug":127},9,"Religion & Spirituality",20,"religion-spirituality",{"id":126,"doc_module":4,"doc_module_name":46,"category_name":129,"show_sort_weight":126,"slug":130},"World Cup","world-cup",{"id":132,"doc_module":4,"doc_module_name":46,"category_name":133,"show_sort_weight":132,"slug":134},10,"Lifestyle","lifestyle",{"id":136,"doc_module":4,"doc_module_name":46,"category_name":137,"show_sort_weight":106,"slug":138},19,"General","general"]